• Title/Summary/Keyword: Pumped-storage

Search Result 126, Processing Time 0.032 seconds

Development of Digital Excitation System for San-cheong Pumped Sorage Power Plant (산청양수 디지털 여자시스템 개발)

  • Ryu, Ho-Seon;Lim, Ick-Hun
    • Proceedings of the KIEE Conference
    • /
    • 2006.07b
    • /
    • pp.956-957
    • /
    • 2006
  • KEPRI developed digital excitation system for San-Cheong pumped storage power plant. This is the very complicated system because of operation connected with SFC(Static Frequency Converter). Many operation modes(stating, regeneration, back to back, line charging, gird connection mode etc) during the commissioning were successfully tested at san-Cheong #2.

  • PDF

Dynamic Simulation of Pump-Storage Power Plants with different variable speed configurations using the Simsen Tool

  • Kruger, Klaus;Koutnik, Jiri
    • International Journal of Fluid Machinery and Systems
    • /
    • v.2 no.4
    • /
    • pp.334-345
    • /
    • 2009
  • Pumped storage power plants are playing a significant role in the contribution to the stabilization of an electrical grid, above all by stable operation and fast reaction to sudden load respectively frequency changes. Optimized efficiency and smooth running characteristics both in pump and turbine operation, improved stability for synchronization in turbine mode, load control in pump mode operation and also short reaction times may be achieved using adjustable speed power units. Such variable speed power plants are applicable for high variations of head (e.g. important for low head pump-turbine projects). Due to the rapid development of power semiconductors and frequency converter technology, feasible solutions can be provided even for large hydro power units. Suitable control strategies as well as clear design criteria contribute significantly to the optimal usage of the pump turbine and motor-generators. The SIMSEN tool for dynamic simulations has been used for comparative investigations of different configurations regarding the power converter topology, types of semiconductors and types of motor-generators including the coupling to the hydraulic system. A brief overview of the advantages & disadvantages of the different solutions can also be found in this paper. Using this approach, a customized solution minimizing cost and exploiting the maximum usage of the pump-turbine unit can be developed in the planning stage of new and modernization pump storage projects.

A New Probabilistic Generation Simulation Considering Hydro, Pumped-Storage Plants and Multi-Model (수력,양수 및 다중모델을 고려한 새로운 확률론적 발전시뮬레이션)

  • 송길영;최재석
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.40 no.6
    • /
    • pp.551-561
    • /
    • 1991
  • The probabilistic generation simulation plays a key role in power system expansion and operational planning especially for the calculation of expected energy, loss of load probaility and unserved energy expected. However, it is crucial to develop a probabilistic generation simulation algorithm which gives sufficiently precise results within a reasonable computation time. In a previous paper, we have proposed an efficent method using Fast Hartley Transform in convolution process for considering the thermal and nuclear units. In this paper, a method considering the scheduling of pumped-storage plants and hydro plants with energy constraint is proposed. The method also adopts FHT techniques. We improve the model to include multi-state and multi-block generation. The method has been applied for a real size model system.

  • PDF

Probabilistic Optimal Weekly Coordination of Thermal-Pumped Storage Power System based on the Maximum Principle (최대원리에 의한 화력-양수발전시스템의 확률적 운전시뮬레이션 모델)

  • Lee, Bong-Yong;Shim, Keon-Bo
    • Proceedings of the KIEE Conference
    • /
    • 1991.07a
    • /
    • pp.411-416
    • /
    • 1991
  • Operation simulation is a key factor to evaluate investment and operation in a power utility. Probabilistic production simulation is of major concern. With pumped-storage plant, production simulation is not an easy task, because its economy should fully be exploited. In addition, usual operation interval is a week rather than a day. Most existing models are based on approximate production simulation such as adopting simple priority orders of generations. This study is based on the more elaborate model developed by authors. Further, a policy of weekly coordination is established based on the Maximum Principle. Chronological load curve instead of usual load duration curve is used and the accuracy in simulation is enhahced. Resulting economics are compared. Deviation between these two toad curve is shown.

  • PDF

An Experimental Study on the Basic Properties and the Control Properties of Crack for Face Slab Concrete in CFRD (CFRD 표면 차수벽 콘크리트의 기본 물성 및 균열 제어 특성에 관한 실험 연구)

  • 우상균;송영철;원종필;윤영수
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.681-686
    • /
    • 2001
  • The purpose of this study is to provide the optimum mix design of concrete to be placed at the face slab concrete in CFRD(Concrete Faced Rockfill Dam) for pumped storage power plants. The basic performance tests including compressive strength, modulus of elasticity, flexural strength and the control properties of crack including plastic shrinkage, drying shrinkage were conducted for concrete using fly ash and polypropylene fiber. From this study, the fly ash concrete represented the better results in the aspects of basic performance, control properties of crack and economy than ordinary portland cement concrete. Especially the concrete mix design containing 20% of fly ash is recommended to be applied in the construction of the face slab concrete in CFRD for pumped storage power plants.

  • PDF

An Installation of 154kV XLPE CABLE in Steep Slope Condition (고낙차 조건에서의 154kV XLPE CABLE 설치)

  • Hwang, Soon-Chul;Lee, Chang-Su;Lee, Cheon-Ku;Goh, Chang-Sung
    • Proceedings of the KIEE Conference
    • /
    • 1992.07b
    • /
    • pp.775-778
    • /
    • 1992
  • In 1980, 154kV OF cable was installed at the Cheong-Pyeong pumped-storage power station. Effective head of this pumped-storage station is 250m between upper and lower re-servior and length of cable route is 750m. However, several failures have happened owing to steep slope during the operation. 154 kV XLPE cable was applied for this power station to eliminate a lack of stability on account of steep slope and successfully installed in 1991. Meanwhile, installation procedure brings about many problem to be solved. In this paper, we describe the counter measure of cable sliding phenomena caused by heat shrinkage as well as the method of installation of cable under the steep slope condition. And hereafter, we think this paper will be a good reference to design and installation of 154kV XLPE cables in steep slope turnnel at urban areas.

  • PDF

Development of On-Line Monitoring System for Pumped Storage Generator/Motor (양수발전소 발전-전동기 운전중 감시 시스템의 개발)

  • 김희동;주영호
    • The Transactions of the Korean Institute of Electrical Engineers C
    • /
    • v.53 no.3
    • /
    • pp.168-174
    • /
    • 2004
  • On-line monitoring system(OMS) has been developed for the pumped storage generator/motor The OMS is applied to diagnosis of the PD(partial discharge) activity of stator insulation, the shorted-turn of rotor winding and the variation of the air-gap between stator and rotor. The OMS consists of DAS(data acquisition system), main server system, gateway and display PC. The DAS measures the PD, the shorted-turn and air-gap from three sensors installed on the generator/motor. The gateway controls the data which sent by DAS. The main server system saves the data, analyzes the data and conducts the diagnostic algorithm. The display PC shows the diagnostic results of partial discharge, shorted-turn and air-gap. Field tests were conducted using PDA(partial discharge analyzer). The results of the OMS and PDA measurements can be directly correlated with normalized quantity number(NQN), PD magnitude(Qm) and PD pattern.

The Best Generation Mix considering CO2 Air Pollution Constraint ($CO_2$ 배출량제약을 고려한 최적전원구성)

  • Lee, Sang-Sik;Tran, TrungTinh;Kwon, Jung-Ji;Choi, Jae-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.149-151
    • /
    • 2005
  • A new approach considering CO2 air pollution constraints in the long-term generation mix is proposed under uncertain circumstances. A characteristic feature of the presented approach in this paper is what effects give the air pollution constraints in long term best generation mix. Best generation mix problem is formulated by linear programming with fuel and construction cost minimization with load growth, reliability (reserve margin rate) and air pollutionconstraints. The proposed method accommodates the operation of pumped-storage generator. It was assumed in this study that the construction planning of the hydro power plants is given separately from the other generation plans. The effectiveness of the proposed approach is demonstrated by applying to the best generation mix problem of KEPCO-system, which contains nuclear, coal, LNG, oil and pumped-storage hydro plant multi-years.

  • PDF