표준시장단가 공고시기 조정에 따른 영향분석 연구 (Analysis of the Influence of Changing the Announcement Date of Standard for Construction Cost Estimation)

  • 이주현;백승호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.204-205
    • /
    • 2020
  • Construction Standard Unit Price is the unit price calculated based on the market price for work items in construction projects that have already been conducted. It is used as basic data for calculating the budget price of public construction projects. In the Construction Standard Unit Price Book implemented in the second half of 2020, there are 1,810 types of unit prices. Since 2017, 100-150 construction standard unit prices have been revised semiannually (on January 1 and July 1 of each year) through Construction Site Surveys. Other work items have been set based on the rate of inflation during the corresponding period. Later in 2020, this procedure was changed, with on-site survey period extended to one year to strengthen the construction standard unit price investigation. The revisions previous announced during the second half of the year were changed only to reflect the price inflation rates. With such changes in the revisions to construction standard unit prices, one important issue that was raised: The timing of announcing the revisions during the second half of the year (reflecting the price inflation rates). The market unit wage, which is the unit price standard of labor cost that takes up a large part of the construction cost, is announced in January and September. The figures announced in September is reflected on the construction standard unit price four months later in January, but the market unit wage announced in January is reflected only six months after in July, which causes a timing issue. As such, the current study analyzed problems rising from the changed timing of the announcements of the construction standard unit price during the second half of the year, in addition to analyzing their impact on public construction projects.

  • PDF

A Study on the Characteristics of "Early Contractor Involvement Method" in Public Project in Japan

  • Tamura, Atsushi
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.42-49
    • /
    • 2022
  • In recent years, Owner, Architects, and Contractor are increasingly collaborating with each other from pre construction phase in construction projects, which is called Early Contractor Involvement (ECI). In Japan, the ECI method has been introduced in several public building projects since 2015. The purpose of this study is mainly to clarify the characteristics of the ECI method in Japan and to compare the contract clauses of the ECI method in the UK and the USA. The results of the survey are as follows. (1) the ECI method was supposed to make it possible to achieve appropriate quality, cost, and construction period by reflecting Contractor's technology and know-how in the design documents and specifications. (2) According to the database, there were 27 cases of the ECI method in Japan from 2015 to 2021, of which 13 cases for which bidding information could be obtained had a variety of technical proposals, mainly VE proposals, depending on the project characteristics. (3), Japan's ECI method has very much in common with SBC + PCSA in the UK. On the other hand, ECI Method in Japan differs from in the UK in that Owner, Architect, and Contractor enter into a partnership agreement, which is similar to ConsensusDocs CD541 in the USA. (4) The ECI method in Japan has the following problems: Owner depends on Contractor for cost control, the division of roles among project members is complicated, and more work from Owner than the DBB method are required.

  • PDF

POTENTIAL PROBLEMS OF RUNNING BUILDING MAINTENANCE PROJECTS IN CONSTRUCTION

  • Edmond W.M. Lam;Albert P.C. Chan;Daniel W.M. Chan
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.856-863
    • /
    • 2009
  • The problem of urban decay in Hong Kong has drawn much attention of both practitioners and academics. Poorly managed buildings not just give a negative image to the Pearl of the Orient in the region, but also pose potential risk hazards to the health and safety of the general public. While it is necessary to devise a comprehensive plan on redevelopment and urban planning, preserving the existing buildings to maintain their conditions for habitation can be a short-term option to safeguard quality standard. With the increasing number of ageing buildings in Hong Kong, a lot of research efforts have been devoted to managing repair and maintenance projects properly (for example those initiated and funded by the Construction Industry Institute, Hong Kong; and the current study financially supported by The Hong Kong Polytechnic University). Given the short duration and more diversified nature of work, building repair and maintenance works are found to be more difficult to monitor and regulate when compared with new works. This paper aims to provide a comprehensive analysis on the problems of running building maintenance projects. An extensive review of contemporary literature was firstly conducted, which forms a solid basis for developing an empirical study on the problems and difficulties of running building maintenance projects from the viewpoints of industrial practitioners with a view to formulating effective strategies for managing maintenance projects successfully.

  • PDF

Public-Private Partnerships in International Development Cooperation: Avoiding the Pitfalls to Make a Difference

  • Lussier, Dr Kattie
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.30-31
    • /
    • 2015
  • PPPs in international development cooperation can be challenging due limited capacities in the country, weaknesses in terms of policy and legislative frameworks, differences in mindsets, values, work ethics and hierarchical structures as well as cultural issues. These can lead to misunderstandings and implementation problems. However, a careful assessment of the situation on the ground, stakeholder analysis and needs assessment can help to identify potential bottlenecks and address capacity constraints that could slowdown operations. A sound understanding of local power dynamics and work practices can help to put in place an exit strategy which will enhance the projects' sustainability. Making sure that goals and objectives are understood in the same way by all partners, establishing an ongoing and respectful dialogue between them, as well as transparent implementation and monitoring mechanisms can also contribute to the PPP's success and increase the likeliness to make a difference in the lives of those in needs.

  • PDF

A PROPOSAL OF CONSTRUCTABILITY REVIEW IN THE BASIC DESIGN STEP FOR DESIGN-BUILD PROJECTS

  • Sung-Wook Choi;Young-Woong Song;Yoon-Ki Choi;Dong-Woo Shin;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1150-1153
    • /
    • 2005
  • The orders of Design-Build Delivery System (DBDS) in a large and public construction project have been increasing. Single Source Responsibility (SSR) for design and construction, which contributes to quality improvement of design and construction, has been performed. The DBDS performs SSR for design and construction, but, it has not maximized effect because of the dissatisfied alternative analysis procedures which are based on constructability evaluation and the information system in the design step. In this research, Constructability Evaluation Factors (CEFs) that must be evaluated, investigated, and reflected in the basic design step for design-build projects. The CEF proposed and the business process of each conductor has been systematized. To propose constructability evaluation factors, first classify drawing information by the constructability evaluation sphere. CEFs must be proposed to evaluate factors according to interference among work items. Second, applicable CEFs must be classified by preference ranking and weight. Third, the values of constructability factors in accordance with building elements and work items, need to be calculated. Finally, the CEFs proposal will support rational decision making, design cost reduction, and quality improvement through the values for constructability of building elements and work items.

  • PDF

자연환경복원산업 활성화를 위한 표준품셈 연구 (A Study on the Standard of Estimate for Vitalizing the Natural Environment Restoration Industry)

  • 진기정;구본학
    • 한국환경복원기술학회지
    • /
    • 제16권2호
    • /
    • pp.23-40
    • /
    • 2013
  • The natural environment restoration industry has been newly included in the environment area of engineering technology. Accordingly, the enactment of a standard of estimate for determining the 'Cost plus Fixed Fee' method has become necessary for the implementation and vitalization of natural environment restoration projects. The purpose of this study is to determine the standards for which the prices for engineering projects are calculated with respect to the enactment of an engineering project standard of estimate in the natural environment restoration field. These include the scope of the technological work, standard area, manpower requirements by technical grade that are necessary for carrying out the technological tasks. Relevant laws and regulations, systems and precedent case studies were investigated and analyzed to establish a price calculation standard. The overall results of the analysis were used and applied to questionnaires, public hearings, and expert delphi techniques. The study showed the following results: The scope of the technological work was categorized into 'Biotopes', 'Eco-corridors' and 'Ecological restoration'. The standard area was set up as $1,000m^2$ for 'Biotopes' and $5,000m^2$ for 'Eco-corridors' and 'Ecological restoration'. The manpower requirements by technical grade that are necessary for carrying out the technological tasks were determined. The suitability of the costs, standard area, manpower requirements by technical grade of ordered engineering projects that are determined by applying the standard of estimate for natural environment restoration that may be enacted pursuant to this study may be effectively investigated and analyzed. Moreover, further studies on the calculation of standard prices that can ensure the stability of natural environment restoration projects will be necessary.

고속도로 건설공사 발주자의 안전점검 체계구축 절차에 관한 이해관계자 설문조사 및 분석 (Survey and Analysis of Stakeholder Opinions on the Establishment Procedure of Safety Inspection System for Highway Construction Clients)

  • 박응호;이수동;정기효
    • 대한안전경영과학회지
    • /
    • 제25권4호
    • /
    • pp.57-65
    • /
    • 2023
  • The public safety management guidelines were introduced in 2019 and continue to be dedicated to advancing comprehensive measures for public safety management, with a primary focus on prioritizing the safety and well-being of the public within governmental institutions. To achieve this goal, our previous study developed a establishment procedure of risk assessment-based safety inspection system for public institutions that order construction projects and applied it to highway construction projects to evaluate its effectiveness. To enhance the practicality of the establishment procedure, it is essential to collect and analyze feedback from stakeholders regarding its performance and suitability. This study conducted a survey involving 200 participants who had experience with the establishment procedure, and performed statistical analyses to evaluate its performance and applicability. The survey results indicated that the participants reported a high level of satisfaction (scoring 4 and above on a 5-point Likert scale) in several areas: specialization of safety inspection items for different types of work (with a satisfaction rate of 65%), the evaluation process for safety ratings (64.5%), and their willingness to recommend the procedure to other institutions (75.5%). In the factor analysis with Varimax rotation, two factors emerged: (1) a specialization factor related to safety inspection items, and (2) a grading factor associated with safety evaluation results. Regression analyses of these factors unveiled significant positive relationships with improvements in safety and health performance, including the prevention of fatal accidents, heightened safety responsibility, and raised safety inspection standards. The establishment procedure of safety inspection system developed in our previous study can play a crucial role in reducing accidents resulting in fatalities and injuries at construction sites, ultimately contributing to a safer working environment for all involved parties.

한강유역 환경보전 종합계획 사업의 개요 (The Outline of Han River Basin Environmental master Plan Project)

  • 이선환
    • 기술사
    • /
    • 제15권1호
    • /
    • pp.46-50
    • /
    • 1982
  • Following rapid industrial development and urbanization in Korea, there is a need for the Government to implement effective control of pollution and to undertake specific schemes in areas where pollution of the environment is severe. In response to this need, Government of Korea prepare Han River Basin Environmental Master Plan Project for water, air, solid waste to cover environmental protection of the Han River Basin. The Project area is approximately 27,000 sq. Km extending over Seoul, Kyunggi, Kwangwon, Chungbuk Province. The total population of Master Plan Project area is approximately 11.6 million, or one-third of the total population of Korea. There are about 8,000 industries, including those located in 16 industrial complexes, in the project area. The scope of work and terms of reference are the following: (1) A Summary of existing land use and forecasts for changes in land use by the year 2,000. (2) Emission inventories for air, waste water, and solid wastes. (3) Forecasts of future population growth patterns and pollution loadings. (4) Identification of specific projects needs to reduce pollution levels and satisfy the environmental quality standards. (5) A Program of enforcement to include (i) self monitoring, and (ii) governmental inspections and surveillance. (6) A program for quality improvement and quality assurance of environmental measurements. (7) Reports summarizing all data collected analyzed during the study. (8) Conceptual design and feasibility studies, including cost estimates, for needed pollution control projects. (9) A financial plan for future detailed design and construction of public facilities, for financial incentives to industry, and for user charges for industrial use of public treatment of disposal works.

  • PDF

조경계획.설계 기술용역의 수행실태에 관한 조사연구 (A Study on the Practices of Landscape Planning & Design Services in Korea)

  • 권오준;심경구;김유일;고동완
    • 한국조경학회지
    • /
    • 제21권4호
    • /
    • pp.113-129
    • /
    • 1994
  • This study is designed to analyze the trends of professional services in Landscape Architecture during the past 5 years(1987-1991) in Korea. The data were collected from 1,117 projects from 56 engineering and landscape architecture firms. The findings are summarized as follows: 1) The projects have been increased annually by 19 percent in numbers and by 47 percent in money terms. 2) The main sources of projects are local governments and corporations. However the private sector comprise 31 percent in projects number and 46 percent in money terms. 3) The public park and tourism site development comprise a half of the projects. Recently recreational forest, golf, amusement and large housing site development have increased very rapidly. 4) In terms of workscope they are devided by 'complex' project which include extensive engineering works and 'simple' project which contain mostly planting design. The former include receational project with average 5 or 6 months contract period, and the later include housing and building site design with 2 or 3 months period. 5) Two types of consulting firms are typical. One is comprehensive engineering firms with urban planning section and few landscape section. The other is specialized professional firms with urban planning or landscape architecture. 50 percent of the project was done by comhensive engineering firms and 60 percent was done by urban planning section. The implication of these findings are broad: Firstly, We have to meet the demands in private secter mostly in recreation and leisure related projects. Secondly, landscape architects and project managers need more professional skills and coordination ability to deal with 'complex' projects. Thirdly, to enhance the quality of professional services it is required to have enough work time and higher service fee through legal and institutional enforcements.

  • PDF

SW개발 SI 프로젝트 과업내용변경에 대한 대가 조정에 관한 연구 (A Study on the Compensation for the Change of Work in SI Project of SW Development)

  • 임규건;김중한
    • 한국IT서비스학회지
    • /
    • 제4권1호
    • /
    • pp.31-40
    • /
    • 2005
  • Generally SW industry is considered as a high value-added business area. However, many SI companies in Korea have been loosing profits in public business sector. One of the reasons of this problem is because the compensation for the change of work which occurs frequently during a project has been rarely happened. This might be because many contracts have been made as more officer-oriented one. So far, there has not been much study on this topic. So in this paper, we are going to define the change of works in SI projects, analyze the characteristics, and classify them into some categories. After analyzing the current status and related laws concerning this problem, we will suggest a way to solve this problem and show the future research topics.