• 제목/요약/키워드: Public work projects

검색결과 153건 처리시간 0.027초

국내 공공미술 사업의 건축적 경향 - 국내 건축가가 단체로 참여한 2000년 이후의 사업을 중심으로 - (Architectural Tendencies of Public Art Projects in Korea - Focused on Those in Which Korean Architects Participated in Group after 2000 -)

  • 박슬기;김란수
    • 한국실내디자인학회논문집
    • /
    • 제24권1호
    • /
    • pp.133-143
    • /
    • 2015
  • This study tried to inquire architectural tendencies in public art projects by analyzing projects and public art works designed by Korean architects. First, it described not only the background and the objectives of this study but also the scope and the methods of it. Second, it gave an overview of public art by explaining the concept, the institutions, and the history of it in Korea. Third, it investigated the contents of public art projects in Korea, in which more than two architectural teams participated, analyzing the tendencies of public art works designed by architects. In order to find the architectural tendencies of public art projects, it analyzed the intentions, the contents and the expressions of architects' art works. In conclusion, this study regarded the architectural tendencies as site-specific, space-experiencing, sheltering, multi-purposeful, contextual, recycling, and eco-friendly.

공공디자인사업 수행 프로세스의 구조적 특성에 관한 연구 (The Structural Characteristics of Work Processes in Public Design Projects)

  • 박수경;문정민
    • 한국실내디자인학회논문집
    • /
    • 제22권3호
    • /
    • pp.145-153
    • /
    • 2013
  • Since a government design department office was set up in 2007, active design projects have been implemented. With this opportunity, each local self-governing organization has improved its administration and institutions, and are planning intensive research on public design for efficient execution of public design projects. However, recent public design projects have caused many problems due to unspecialized design processes, a lack of cooperation with relevant organizations, and unsatisfactory management systems after projects. Therefore, to overcome such problems in the execution of public design projects, a procedure-centered model should be developed. This study aims to analyse the process structures for the strategic execution of public design projects, and the methods and content of the execution process. For this purpose, this study looked into the process structures of public design projects based on design management strategies in order to draw suggestions needed for the execution process through advanced cases. The study is summed up as follows: First, when the process of public design projects was examined in terms of management strategies and design management strategies, it included two dimensions: the management structure of general projects and the design of development projects. Secondly, through the analysis of public design cases, this study discovered useful methodologies and the main programs used and drew suggestions needed for each step in public design projects. It is expected that the results of this study will be helpful for the development of a process model appropriate for national public design projects based on the current status of the project execution and to make a contribution to systematic development in national public design.

국내 공공공사 낙찰률 하락의 원인 분석 및 개선 방향 (Identifying Factors Causing Bid-dropping in Domestic Public Work Projects and Ways of Ending Its Decline)

  • 이복남;이영환;장철기
    • 한국건설관리학회논문집
    • /
    • 제6권5호
    • /
    • pp.102-109
    • /
    • 2005
  • 최저가 낙찰제하에서 국내 공공공사의 낙찰률이 지속적으로 하락하고 있다. 미국, 일본과 비교 해 보았을 때 상당히 낮은 수치이며, 특히 국내의 경우 건설업체의 향후 유사 사업에 대한 실적을 확보하기 위한 전략적 수주는 상황을 더욱 악화 시키고있다. 정부는 저가 낙찰을 방지하기 위한 보완책을 내 놓았지만, 실효성이 없는 실정이다. 본 고에서는 먼저, 국내 공공공사의 낙찰률을 미국, 일본의 공공공사 낙찰률과 비교를 하여 국내 공공공사의 낙찰률 하락의 정도를 파악하고, 국내 공공공사의 낙찰률 하락의 원인을 분석하고자 한다. 이와 더불어, 무분별한 저가 수주를 방지하기 위한 선진 외국의 제도와 국내 제도와의 비교를 통해 무제한 저가낙찰을 방지하기 위한 개선 방향을 제시하고자 한다.

공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발 (Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects)

  • 강동완;문현석;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF

Construction Delay Analysis Using Daily Work Report Data for Short Construction Seasons

  • Jamal, Md Shah;Abdelaty, Ahmed;Shrestha, K. Joseph
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.616-623
    • /
    • 2022
  • Some regions and states, such as Wyoming, have harsh weather conditions, forcing most transportation projects to be completed under tight schedules. However, construction projects are not only delayed by weather conditions, but also delayed by other factors such as contractor's competency, resource availability, coordination issues, and safety. Also, the construction method, geographical location of the projects, and inability to follow baseline schedules accurately due to the contractor's resource allocation are also reasons for the delay. This paper discusses the main reasons for the delay in the public transportation projects based on Daily Work Reports (DWRs) from five different transportation projects of the last three years in Wyoming. This paper focuses on the inconsistencies of the contractor's schedules to complete the project according to the baseline schedule. First, the authors collected DWRs and baseline schedules from the Wyoming Department of Transportation (WYDOT). Second, the DWR data are compared against the baseline schedules to determine the reasons for delaying their significance. Finally, the paper presents the recommendations to mitigate the effects of delays on public transportation projects as well as to improve the documentation process of DWR data.

  • PDF

물량 산출 및 생산성 분석 기반의 거푸집공사 비용공정 통합 모델 (Integration Model of Cost and Schedule in Aluminum Form Work based on Quantity Take-offs and Daily Productivity Analysis)

  • 지성민;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.17-18
    • /
    • 2011
  • Over the past 20 years, Researchers have tried to develop "Integration Model of Cost and Schedule" in construction industry. They suggested various models and techniques, however, it is still required to develop new methodology for AL Form Work in Public Multi-Housing Projects. Accordingly, this research focused on measuring quantity take-offs of on-going projects and analysing the basic process of using the resources(Labor, Material, Plant) related to cost and time data. There are 3 steps of this research : 1) The literature review of previous studies about Integration Model of Cost and Schedule was conducted. 2) Model for integration between cost and schedule was developed. 3) the accuracy of developed model was verified. The results are expected to improve in integrated managing the cost and schedule data of AL form work.

  • PDF

공공사업 예정공사비에 대한 실증적 접근 (An Empirical Approach Study on Construction Cost Estimation in Public Work Projects)

  • 유창규;송정규;이윤선;김재준
    • 한국건축시공학회지
    • /
    • 제9권1호
    • /
    • pp.65-73
    • /
    • 2009
  • Looking at current construction costs estimations of publicly declared public works, there are many instances where estimation criteria are ambiguous and doesn't imply the reality. Up to date, estimation criteria for calculating construction cost estimations are simply by unit area multiplication and stochastic construction cost estimation. However, possibility of making errors are high due to using uniform data that excludes each public work's specifications and environmental conditions. Further, on the aspect of cost management, there is certain limitation in the efficiency of cost management in order-placing stage and commencing-work stage; while efficient cost management and reduction of expenses are highly possible during initial stages of the project. In this respect, the paper adopts positive approach with regards to construction cost estimations of public works and draws common elements from calculation tables of the construction cost estimations from 3 completed domestic construction works; after which, the paper analyzes whether business exposition, construction guide and publicly-declared estimated construction costs that the orderer issued are calculated economically and properly; deducing problems in the process, the paper seeks to recommend rational calculation method on this.

건설공사 발주 공공기관의 안전점검 체계구축에 관한 연구 (Establishment of a Safety Inspection System for Public Institutions Ordered Construction Projects)

  • 박응호;이수동;정기효
    • 대한안전경영과학회지
    • /
    • 제25권3호
    • /
    • pp.55-62
    • /
    • 2023
  • Public institutions have a responsibility to ensure the safety of their employees and the public. One way to do this is to implement a systematic safety inspection system based on risk assessments and continuous improvements. This study developed a systematic safety inspection system for public institutions that are ordered construction projects. The proposed system in this study consists of a three-step process: (1) developing safety grade evaluation tables, (2) preparing and conducting safety inspections, and (3) evaluating and improving safety management grades. The first step is to develop safety grade evaluation tables by analysis and diagnosis of the construction site's work type, disaster statistics, and related laws. The second step is to conduct safety inspections using the developed evaluation tables. The third step is to determine the safety management grade based on the results of the safety inspection, and to improve risk factors found during the safety evaluation. The proposed system was implemented in highway construction projects carried out by public institutions. The results showed that the proposed system has two major effects: (1) reducing accident-related deaths and injuries, (2) improving safety management levels by continuous evaluation and improvement. The proposed system can be utilized in construction projects ordered by public institutions to improve the level of occupational safety and health.

A CBR-BASED COST PREDICTION MODEL FOR THE DESIGN PHASE OF PUBLIC MULTI-FAMILY HOUSING CONSTRUCTION PROJECTS

  • TaeHoon Hong;ChangTaek Hyun;HyunSeok Moon
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.203-211
    • /
    • 2009
  • Korean public owners who order public multi-family housing construction projects have yet to gain access to a model for predicting construction cost. For this reason, their construction cost prediction is mainly dependent upon historic data and experience. In this paper, a cost-prediction model based on Case-Based Reasoning (CBR) in the design phase of public multi-family housing construction projects was developed. The developed model can determine the total construction cost by estimating the different Building, Civil, Mechanical, Electronic and Telecommunication, and Landscaping work costs. Model validation showed an accuracy of 97.56%, confirming the model's excellent viability. The developed model can thus be used to predict the construction cost to be shouldered by public owners before the design is completed. Moreover, any change orders during the design phase can be immediately applied to the model, and various construction costs by design alternative can be verified using this model. Therefore, it is expected that public owners can exercise effective design management by using the developed cost prediction model. The use of such an effective cost prediction model can enable the owners to accurately determine in advance the construction cost and prevent increase or decrease in cost arising from the design changes in the design phase, such as change order. The model can also prevent the untoward increase in the duration of the design phase as it can effectively control unnecessary change orders.

  • PDF

공공건설사업에서의 건설공사 사후평가시스템 구축에 관한 연구 (Development of the Construction Post-evaluation System in Public Construction Projects)

  • 옥현;양성훈
    • 한국산학기술학회논문지
    • /
    • 제15권12호
    • /
    • pp.7364-7371
    • /
    • 2014
  • 건설공사 사후평가는 공공건설사업 수행성과를 평가하고 차후 유사사업 추진 시 이를 활용하여 공공건설사업 효율화에 기여하기 위한 제도이다. 건설공사를 계획하는 과정과 공사완료 후의 공사비, 공사기간, 수요, 효과 등에 대한 예측치와 실제치를 종합적으로 분석, 평가하여 시행의 효율성을 도모하는데 목적이 있다. 이를 통해 방만한 사업추진을 방지하고, 유사 건설공사의 품질 및 효율성 향상을 위한 자료로 활용하고 있다. 하지만, 건설공사 사후평가 자료를 유사 건설사업에 참조 및 활용하기 위해서는 건설공사 사후평가 결과정보에 대한 체계적인 관리가 필요하다. 따라서 본 연구는 발주청별로 실시하고 있는 건설공사 사후평가의 결과정보를 체계적으로 통합 관리하고, 활용할 수 있도록 국토교통부에서 고시한 건설공사 사후평가 시행지침을 기초로 하여 건설공사 사후평가시스템을 구축하였다. 이를 통해 공공 건설사업의 수행 시 유사 건설사업의 수요 증감, B/C 비율 등 결과정보의 참조 활용을 통해 품질 향상 및 효율적인 사업 추진이 가능한 기반을 마련하였으며, 향후 사후평가 결과정보의 체계적인 관리를 통해 종합적인 분석 및 평가 등 유용한 도구로 활용될 수 있으리라 기대된다.