• 제목/요약/키워드: Public road project

검색결과 85건 처리시간 0.026초

ESTIMATING COSTS DURING THE INITIAL STAGE OF CONCEPTUAL PLANNING FOR PUBLIC ROAD PROJECTS: CASE-BASED REASONING APPROACH

  • Seokjin Choi;Donghoon Yeo;Seung H. Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1183-1188
    • /
    • 2009
  • Estimating project costs during the early stage of conceptual planning is very important when deciding whether to approve the project and allocate an appropriate budget. However, due to greater uncertainties involved in a project, it is challenging to estimate costs during this initial stage within a reasonable tolerance. This paper attempts to develop a cost-estimate model for public road projects under these circumstances and limitations. In the conceptual planning stage of a road project, there is only limited information for cost estimation, for example, such input data as total length of the route, origin and destination, number of lanes, general geographic characteristics of the route, and other basic attributes. This implies that the model should individuate suitable but restricted information without considering detailed features such as quantity of earthwork and a detailed route of a given condition. With these limited facts, this paper applies a case-based reasoning (CBR) method to solve a new problem by deriving similar past problems, which in turn is used to estimate the cost of a given project based on best-fitted previous cases. To develop a CBR cost-estimate model, the authors classified 8 representative variables, including project type, the number of lanes, total length, road design grades, etc. Then, we developed the CBR model, primarily by using 180 actual cases of public road projects, procured over the last decade. With the CBR model, it was found that the degree of error in estimation can be reasonably reduced, to below approximately 30% compared to the final costs estimated upon the completion of detailed design.

  • PDF

Government's Roles in Public Private Partnership Toll Road Projects

  • Rohman, Mohammad Arif;Doloi, Hemanta;Heywood, Christopher
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.381-385
    • /
    • 2015
  • This research aims to investigate critical factors of the government's role in achieving success in Public Private Partnership (PPP) toll road projects in Indonesia according to government and private sectors' perceptions. A preliminary interview Subsequently a questionnaire survey was also conducted involving 143 respondents across the two sectors from eight operating toll were five critical factors of the government's roles in achieving success in PPP toll road projects, namely; "Active involvement in overall project stage activities", "Establishment of good bureaucracy", "Provision of conducive environment", "Appropriate project planning and competitive tendering" and "Provision of appropriate government support and supervision". This research finding is expected to assist the government in defining clear roles and underlying responsibilities in development of PPP toll roads in Indonesia.

  • PDF

도로사업의 PI에 관한 주민의식 평가 (Evaluation of Consciousness on Public Involvement of Road Project)

  • 김현;권영인;정병두;이선하
    • 대한교통학회지
    • /
    • 제24권3호
    • /
    • pp.73-83
    • /
    • 2006
  • 본 연구에서는 서울외곽순환고속도로의 사패산 사업을 대상으로 행정측의 불신감, 도로사업의 이해도, 주민참여의 만족도, 그리고 새로운 주민참여제도에 대한 이해도와 참가의도 등의 의식에 초점을 두고 있다. 이러한 의식의 변수와 사패산 도로사업의 수용의식에 관한 주민의식 평가 인과구조 가설을 설정하고 공분산구조방정식을 이용하는 주민의식 평가 방법론과 그 적용에 대해 검토하고 있다. 그 결과 사패산 도로사업의 수용의식 평가에 있어 행정 불신감이 강한 장해요인이며, 도로사업의 이해도와 새로운 주민참여제도의 이해도는 긍정적인 영향을 미치는 촉진요인으로 작용하고 있다 것을 확인하였다.

FACTORS AFFECTING THE SUCCESS/FAILURE OF ROAD INFRASTRUCTURE PROJECTS UNDER PPP IN INDIA

  • Nallathiga, Ramakrishna;Shaikh, Haris D;Shaikh, Tauseef F;Sheik, Farhan A
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권4호
    • /
    • pp.1-12
    • /
    • 2017
  • India has accorded a high priority to road infrastructure development through Public-Private Partnership (PPP) and it has set a high target for investment inflows. Yet, it is widely held that road/highway infrastructure has not been developing at required pace and that the road infrastructure projects under PPP have been suffering from several hurdles and delays, thereby affecting project success/failure. This paper is an attempt to analyze the critical success/failure factors of road infrastructure projects under PPP in India. A questionnaire survey was conducted among a sample of the stakeholders of road infrastructure projects to identify the critical success/failure factors during all four major project stages using different approaches. Initially, the critical factors were identified through ranking based on the average/mean score. Later, the conventional RII score was used to identify the critical success/failure factors. Finally, the critical success/failure factors were also identified based on the stakeholder-wise ranking of the factors and their convergence. The assessment revealed that there was a greater convergence across the different methods and also that there was greater consensus among project stakeholder on the critical success/failure factors of road PPP projects.

민간투자사업의 제안서 작성 업무 개선에 관한 연구 - 운영관리비 산정 업무를 중심으로 - (Study on the Improvement of Proposal Works for PPP Project: Focused on Operation and Maintenance Cost)

  • 구자경;이동욱;심명섭;이태식
    • 대한토목학회논문집
    • /
    • 제30권6D호
    • /
    • pp.655-662
    • /
    • 2010
  • 사회기반시설은 국가 경쟁력 지표로써, 전통적으로 정부의 SOC 재정으로 건설되어 왔다. 그러나 SOC 예산 축소에도 불구하고 사회기반시설의 확충 요구를 해결하기 위해 민간투자사업제도가 도입되었으며, 이 중 도로사업의 비중이 높다. 본 연구는 기 제안된 도로사업 사업계획서의 운영관리비와 사업계획서와 연계되는 재무모델의 운영관리비 항목을 분석하고, 도로사업의 특성을 반영하기 위해 한국도로공사의 사업비 항목과 운영관리 업무를 분석하였다. 분석 결과를 통해 분류체계를 마련하여 비용산정 기준을 마련하는 것이 요구된다. 또한 업무의 효율성을 고려하여 기존의 업무 도구를 웹기반으로 통합하여 하나의 시스템으로 개발하는 것을 제안하였다. 이를 통해 민간투자사업의 전체적인 사업성 확보에 기여하고, 수익성을 기반으로 하는 사회기반시설의 확충에 기여할 것으로 기대된다.

공공 도로건설사업에서의 설계도서 납품체계 개선방안에 관한 연구 (A Study on Improvement Measures for the Design Documents Delivery System in Public Road Construction Projects)

  • 옥현;김성진;김태학;주기범
    • 한국도로학회논문집
    • /
    • 제20권2호
    • /
    • pp.45-55
    • /
    • 2018
  • PURPOSES : This study aims to survey and analyze the status of the design and completion documents output delivery system in public construction projects in order to assess the problems of the Ministry of Land, Infrastructure and Transport (MOLIT)'s electronic delivery system, with a focus on roads and rivers, and to offer improvement measures. METHODS : This study first surveys and analyzes laws and existing study trends with regard to the design and completion documents output delivery system in public construction projects. It further analyzes the status of the output delivery system in public construction projects, including roads, rivers, expressways, water resources, and railroads. In addition, a comparative analysis of the current electronic delivery system of MOLIT and Korea Expressway Corporation in the road field is conducted, and the problems and improvement measures for MOLIT's electronic output delivery system are presented. This study seeks to analyze problems and prepare improvement measures with regard to road and river public construction projects, as ordered by MOLIT's five regional offices. RESULTS : This study sought to prepare the electronic output delivery system with regard to public construction projects and present the analysis of its major problems and improvement measures in four categories: "the preparation of electronic design documents output delivery system improvement measures including inspection and delivery," "preparation of guidelines, systems, etc., concerning electronic design documents," "preparation of improvement measures for the construction project management system and electronic design document support tools", and "linking of MOLIT's electronic output delivery system with relevant agencies and the expansion thereof to local governments." CONCLUSIONS : This study analyzed the current status and problems of the MOLIT's electronic output delivery system in the field of road and river construction projects, and presented corresponding improvement measures. This study is expected to address the problems of the MOLIT's electronic output delivery system, and to provide the foundation for the preparation of an efficient electronic output delivery system for design and completion documents. In addition, this study is expected to boost the quality and utilization of the electronic design documents output, and to exchange, share, and link construction information among relevant agencies so as to prepare the foundation for sharing construction information.

EVALUATION OF MINIMUM REVENUE GUARANTEE(MRG) IN BOT PROJECT FINANCE WITH OPTION PRICING THEORY

  • Jae Bum Jun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.800-807
    • /
    • 2009
  • The limited public funds available for infrastructure projects have led governments to consider private entities' participation in long-term contracts for finance, construction, and operation of these projects to share risks and rewards between the public and the private. Because these projects have complicated risk evolutions, diverse contractual forms for each project member to hedge risks involved in a project are necessary. In light of this, Build-Operate-Transfer(BOT) model is considered as effective to accomplish Public Private Partnerships(PPPs) with a characteristic of an ownership-reversion. In BOT projects, the government has used such an incentive system as minimum revenue guarantee(MRG) agreement to attract the private's participation. Although this agreement turns out critical in success of BOT project, there still exist problematic issues in a financial feasibility analysis since the traditional capital budgeting theory, Net Present Value(NPV) analysis, has failed to evaluate the contingent characteristic of MRG agreement. The purpose of this research is to develop real option model based on option pricing theory so as to provide a theoretical framework in valuing MRG agreement in BOT projects. To understand the applicability of the model, the model is applied to the example of the BOT toll road project and the results are compared with that by NPV analysis. Finally, we found that the impact of the MRG agreement is significant on the project value. Hence, the real option model can help the government establish better BOT policies and the developer make appropriate bidding strategies.

  • PDF

Web-system development for the feasibility of national road

  • Park, T.;Shin, E.;Kang, T.;Park, W.;Lee, Y.
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.698-699
    • /
    • 2015
  • For last three years, our research team have conducted the project named "Development of construction project management technology based on BIM/GIS platform. "We developed construction cost estimation system as well as 3D modeling engine at the first two year and established a web-system which could estimate the benefits of the project and further analyze the economic and financial feasibility of the project. This paper mainly focused on the functions and specifications of web-system. The system was composed of two modules: economic feasibility estimation module and financial feasibility estimation module. While the economic feasibility estimation module determines economic feasibility of the project based on traffic demand forecasting from the public's perspective, the financial feasibility estimation module determine financial viability of the project using toll fee of the road from private entity's perspective. Compared with traditional feasibility study, the proposed system provide users with better flexibility which can make users easily to validate the project upon the change of project environments. The system was also verified with an already accomplished project. The verification showed that proposed system could provide satisfactory accurate results with reduced time and resources.

  • PDF

서울시 터널의 유해대기오염물질 농도변화 특성 분석 (Characteristics of Hazardous Air Pollutant Level in Road Tunnels in Seoul)

  • 박진아;이원영;김진아;김익수;김현수;정종흡;윤중섭;정권;엄석원
    • 한국환경보건학회지
    • /
    • 제39권6호
    • /
    • pp.541-549
    • /
    • 2013
  • Objectives: We analyzed the characteristics of hazardous air pollutants (HAPs) in road tunnels in Seoul. Methods: Particle matter ($PM_{10}$), elemental carbon (EC), organic carbon (OC), and 16 species of polycyclic aromatic hydrocarbons (PAHs) in two road tunnels (NS tunnel and HJ tunnel) were sampled and analyzed from 2007 to 2011. Results: Levels of $PM_{10}$ and carbon ingredients which were mainly emitted from diesel-fueled vehicles showed a declining tendency in both road tunnels. PAHs levels in HJ were declining slightly while PAHs levels in the NS tunnel fluctuated considerably and showed an increasing tendency. Conclusions: These results suggested that the abatement project of diesel vehicle emissions by the Seoul metropolitan government from 2007 has had an impact on the reduction of DVE into the air, though there exist many things to consider for analyses.

공공 도로건설사업에서의 원격 현장모니터링 체계 구축에 관한 연구 (A Study on Development of Remote Site Monitoring System in Public Road Construction Projects)

  • 옥현
    • 한국도로학회논문집
    • /
    • 제14권6호
    • /
    • pp.57-65
    • /
    • 2012
  • PURPOSES : Efficiency Improvement of a public road construction project management work using the development of a real-time remote site monitoring system METHODS : In this study, we developed the remote site monitoring system using a web camera for road construction projects in the RCMA(Regional Construction Management Administration). We can be monitored a construction progress and a weak point of the situation in real time using this. To achieve this, we tested about 10 road construction projects ordered by RCMA. Then, we verified a applicability for the site monitoring system in future. RESULTS : Take advantage of the remote site monitoring system consists of the Construction CALS System, one of the business systems used in the part of the MLTM(Ministry of Land, Transport and Maritime Affairs) institution-agencies. Was configured to be served through the "Construction CALS System" of "Construction Management System(Contractors)" and the "Construction CALS Portal System". Through this, Benefit analysis through a pilot application of the 10 road construction sites and developing considerations and "Guide for visual information processing equipment installation-operating in construction sites"are presented. CONCLUSIONS : Through the establishment of remote site monitoring system can improve the efficiency of construction management services. In addition, Various disasters and calamities, accidents and illegal construction will be prevented in advance is expected. This is expected to further improve the quality of the facilities.