Multi-dimensional Quality Model for Value Engineering in Planning Phase of Public Construction Program (공공 건설 프로그램의 기획단계 VE를 위한 다차원 품질모델)

  • Hyun, Chang-Taek;Kim, Jong-Hyeob;Son, Myung-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.61-69
    • /
    • 2013
  • In the mixed-use development program, several conflicts occur due to the characteristics of construction program, such as large-scale, variety of stakeholders, long periods of time, etc. In particular, since the characteristics of the construction program having various complex projects lead to different requirements depending on stakeholders, it is crucial to plan the appropriate type and size of facilities. Therefore, it is necessary to derive solutions suitable for the needs of owner by conducting VE in the planning phase. In this study, a multi-dimensional quality model is developed to present proper facilities necessary for the construction program by clearly identifying the owner's requirements in performing VE in the planning phase. Through the development of the multi-dimensional quality model, the characteristics distribution of 15 major facilities by 12 performance indicators for mixed-use development programs is presented. The deduction method of appropriate facilities based on the requirements of owner and the multi-dimensional synthesis method among the performance indicators are also suggested. This study is significant as a basic research for the application of VE in the planning phase of construction program. It is expected that the multi-dimensional quality model proposed in this study could facilitate presentation and review of appropriate facilities based on the analysis of requirements of various stakeholders in the early stage of the construction program.

Construction Claims Prediction and Decision Awareness Framework using Artificial Neural Networks and Backward Optimization

  • Hosny, Ossama A.;Elbarkouky, Mohamed M.G.;Elhakeem, Ahmed
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.11-19
    • /
    • 2015
  • This paper presents optimized artificial neural networks (ANNs) claims prediction and decision awareness framework that guides owner organizations in their pre-bid construction project decisions to minimize claims. The framework is composed of two genetic optimization ANNs models: a Claims Impact Prediction Model (CIPM), and a Decision Awareness Model (DAM). The CIPM is composed of three separate ANNs that predict the cost and time impacts of the possible claims that may arise in a project. The models also predict the expected types of relationship between the owner and the contractor based on their behavioral and technical decisions during the bidding phase of the project. The framework is implemented using actual data from international projects in the Middle East and Egypt (projects owned by either public or private local organizations who hired international prime contractors to deliver the projects). Literature review, interviews with pertinent experts in the Middle East, and lessons learned from several international construction projects in Egypt determined the input decision variables of the CIPM. The ANNs training, which has been implemented in a spreadsheet environment, was optimized using genetic algorithm (GA). Different weights were assigned as variables to the different layers of each ANN and the total square error was used as the objective function to be minimized. Data was collected from thirty-two international construction projects in order to train and test the ANNs of the CIPM, which predicted cost overruns, schedule delays, and relationships between contracting parties. A genetic optimization backward analysis technique was then applied to develop the Decision Awareness Model (DAM). The DAM combined the three artificial neural networks of the CIPM to assist project owners in setting optimum values for their behavioral and technical decision variables. It implements an intelligent user-friendly input interface which helps project owners in visualizing the impact of their decisions on the project's total cost, original duration, and expected owner-contractor relationship. The framework presents a unique and transparent hybrid genetic algorithm-ANNs training and testing method. It has been implemented in a spreadsheet environment using MS Excel$^{(R)}$ and EVOLVERTM V.5.5. It provides projects' owners of a decision-support tool that raises their awareness regarding their pre-bid decisions for a construction project.

Case study of Civil Engineering BIM Projects: Perspective of Korean Public Owners (토목분야 BIM 적용 사례 분석을 통한 발주자 관점에서의 BIM 발전 전략)

  • Kim, Changyoon;Moon, Hyoun-Seok;Nah, Heu-Suk;Kim, Jin-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7430-7437
    • /
    • 2014
  • Owing to the increase in large and complex construction projects, the design paradigm of architecture and civil engineering projects has changed from 2D CAD to 3D CAD. For this reason, to meet the strong requirements of project contractors, various efforts have been made to adopt a Building Information Modeling (BIM) technology for effective construction management. On the other hand, compared to architectural projects, only a few civil engineering project cases have been conducted in the perspective of public contractors. This is because the characteristics of civil project contractors and the negative pursuit of adopting BIM technology due to the lack of a current BIM system and technologies. Recently, positive changes in adopting BIM technology for public projects were anticipated by public owners, such as the Public Procurement Service and the Ministry of Land, Infrastructure and Transport. In this regard, this study analyzed the current BIM technology status of public owners in Korea to adopt the BIM policies and guidelines of the Korean government. Strategies for adopting BIM technologies for Korean public owners are also discussed based on an analysis of civil engineering BIM project cases.

Consumers' Perception on Legal Liability of the Online Reviews (온라인 사용후기에 대한 법적책임의식에 관한)

  • Kim, Soyean
    • International Commerce and Information Review
    • /
    • v.17 no.3
    • /
    • pp.3-27
    • /
    • 2015
  • As hostile online reviews can have a negative impact on a company's reputation, it is not surprising that online reviewers and business owners often get involved in conflicts which sometimes evolve into legal disputes. This research examines the legal dispute case in which the business owner charges an online reviewer for a defamation. Further, this research compares the supreme court's decision with general public's view on this defamation case, using a survey method. From the legal point of view, an online reviewer's primary motive determines whether the online reviews are defamatory statements or not. Specifically, if an online reviewer's primary motive is to increase the overall benefits for the public society, the online review does not bear any legal liability. According to our survey, consumers' view aligns with the final decision of the supreme court. They believe that online reviews should bear a minimum level of legal liability as online reviews often contain useful and valuable information which can enhance overall public benefits.

  • PDF

Local Governments′ Housing Information System (지방정부의 주택정보서비스체계구축방안 및 사례연구)

  • 윤혜정
    • Journal of the Korean housing association
    • /
    • v.15 no.2
    • /
    • pp.27-34
    • /
    • 2004
  • The purpose of this study has two folds. For the local government it gives a guide to establish the housing information system, which provides various housing information in order to promote service to the public on Internet. It also gives a guide for the local government to collect the fundamental data from local housing market and provide them to the policy makers as well as the housing producers (landlords, builders and owner-occupiers). Contents of housing information system website for the local government consist of three main parts. The first part provides housing policy and local housing market information to the upper level local government as well as housing producers. The second part provides housing information for the people who are looking for houses to move the own. Final part provides the procedures of building construction and development plan for landlords to the public. In case of Pyongtaek-City, this study makes them by cluster analysis of houses and households moving pattern as the Internet contents. Housing markets of Pyongtaek-City divide 3 sectors by housing type, tenure type and housing supply ratio etc. And populations prefer to move intra sectors. According to this information, policy-makers should define local housing problems and find solutions and housing producers can supply the house just in sites and in time. In conclusion, local government should provide valuable housing information based on local housing market research to the public for the effective housing policy. As local housing market is formed by various factors it is needed for local government to research housing sub-markets due to apply these research results to the local government for the future.

A Study on the Improvement of Public Facility Management System Using Life-cycle Management (Life-cycle Management를 활용한 공공시설 유지관리 시스템 개선방안)

  • Jeon Ick-Sung;Shon Jeong-Rak;Kim Kyung-Suk;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.55-63
    • /
    • 2004
  • A building structures was used the facility management phase through $planing\cdotdesign\cdotconstruction$. phase. building's length of life was shorter than its physical length of life, because of the lack of law and institution, the lack of related agencies' preparation and owner's preparation. Also, considering the construction life-cycle, the facility phase accounted for $70\%$ of whole official lift, therefore, it needed to be opposed to systemic facility management. Current facility management system practically managed the defect of facility and almost never communicated between the other phase. In the side of policy, domestic law, institution, and policy related to building structure focused built-up market. and then the management of existing facilities was not consolidated efficiently. The purpose of this study was to suggest the direction of facility management construction for managing, utilizing, and operating public facilities, moreover, to study the direction of current facility management system improvement corresponding to total computer integrated construction system under government agencies.

A Design of Hadoop Security Protocol using One Time Key based on Hash-chain (해시 체인 기반 일회용 키를 이용한 하둡 보안 프로토콜 설계)

  • Jeong, Eun-Hee;Lee, Byung-Kwan
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.10 no.4
    • /
    • pp.340-349
    • /
    • 2017
  • This paper is proposed Hadoop security protocol to protect a reply attack and impersonation attack. The proposed hadoop security protocol is consists of user authentication module, public key based data node authentication module, name node authentication module, and data node authentication module. The user authentication module is issued the temporary access ID from TGS after verifing user's identification on Authentication Server. The public key based data node authentication module generates secret key between name node and data node, and generates OTKL(One-Time Key List) using Hash-chain. The name node authentication module verifies user's identification using user's temporary access ID, and issues DT(Delegation Token) and BAT(Block Access Token) to user. The data node authentication module sends the encrypted data block to user after verifing user's identification using OwerID of BAT. Therefore the proposed hadoop security protocol dose not only prepare the exposure of data node's secret key by using OTKL, timestamp, owerID but also detect the reply attack and impersonation attack. Also, it enhances the data access of data node, and enforces data security by sending the encrypted data.

Improving the Design-phased VE Process of Public Clients in Relation to Using Critical Success Factors (핵심성공요인과 연계한 공공발주기관의 설계VE 프로세스 개선에 관한 연구)

  • Park, Heedae;Han, Seung Heon;Kim, Sung Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3D
    • /
    • pp.399-408
    • /
    • 2009
  • The major changes in construction environment are that construction project is bigger and more complicated and the power of construction market changes from the supplier to the client or the user. Especially public construction enterprises have advanced to introduce the value engineering (VE) which is one of the cost management based on the owner's leading at the design phase for economical efficiency and quality improvement. According to the these efforts, the implementation of VE was legislated in the revised Construction Technology Management Act in 2000, governmental agencies, local autonomies, and construction public enterprises universally has taken the VE into consideration. In this circumstance, the scope that VE construction applied at 50 billion won projects from 2003 has been extended to 10 billion won projects in 2006. Therefore, the VE construction will be activated in the future. The cost savings and function improvement, which are the purpose of VE are not only construction public enterprises, but also every public client supported from government's budget or owned by the government. Therefore, the purpose of this study is to propose the improved process and performance index of VE for governmental agencies, local autonomies, and construction public enterprises which want to introduce or improve the VE process. This research also suggested the To-be design-phased VE process model. In addition, it suggested the To-be model of design management reflected the To-be design-phased VE process model, which is eliminated two problems reflected for the performance improvement of the As-is model of design management.

Major Risk Factors to Implement CM at Risk Pilot Project on the Public Sector (시공책임형 CM 발주방식 공공부문 시범사업 사례를 통한 리스크 도출)

  • Han, Jonghoon;Kim, Kyungtae;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.61-69
    • /
    • 2018
  • The buildings are getting enormous and more complex as well as the requirement of the owner which wants diverse and efficient. Moreover advanced management is necessary for construction services and a new method of delivering project is now required. In order to expand the delivering method and the construction industry, we have to introduced the CM at Risk method. However, despite the fact that six years have passed already the CM at Risk regulation was introduced, the contract amount in significantly lower than that of the CM for fee, and also there is no CM at Risk project in the public sector. As a result, three pilot projects are currently underway for the LH(Korea Land & Housing Corporation) in order to set up a CM at Risk for the public sector. However, detailed regulations related to CM at Risk have not yet been implemented in Korea. Therefore, in this study, I am trying to understand the risks that could incur when practitioners participate in the three pilot projects that are currently underway and employed in the public sector wherein the CM at Risk is normally introduced. Based on the results of this study, It will be able to utilize as a basic data for future CM at Risk delivery system improvement and enactment.

A Study on the Application Plan of the Cadastral Resurvey in South Korea Through a Case Analysis of the Japanese Private-Public Boundary (일본 관민경계 사례분석을 통한 우리나라 지적재조사 적용방안에 관한 연구)

  • KIM, Jae-Myeong;LEE, Dong-Hwa
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.22 no.1
    • /
    • pp.39-50
    • /
    • 2019
  • Since the "Special Law on Cadastral Resurvey" was enforced in 2012, the Cadastral Resurvey Project in South Korea has been promoted in earnest. However, it has been difficult to obtain the following items: a budget for the project, the establishment of land boundaries by increasing/decreasing the area of the parcels of land in the downtown area, the calculation of the adjustment fee, and the analysis of the relationship between the business owner and the landowner in regards to conflicts of opinion. The analysis of Japan's private-public boundary system, which is promoting the Cadastral Resurvey ahead of South Korea, should not attempt to determine complex interests, especially when they are pursuing consensus of the boundary setting portion of the Cadastral Resurvey Project. Therefore, this study shows that there is a need to reduce the number of stakeholders and promote them by using a step-by-step process. The introduction of cost-saving measures for the Cadastral Resurvey through a private-public boundary preliminary investigation is needed. This study suggested the following: link the precision road map construction business using MMS, introduce the preliminary research projects for the Cadastral Resurvey, and gather the important land survey information for the private-public boundary basic survey. In order to establish the utilization base, the researcher proposed linking the downtown area regeneration with the downtown area planning business.