• Title/Summary/Keyword: Public Transportation Cost

Search Result 176, Processing Time 0.037 seconds

Socioeconomic Costs of Stroke in Korea: Estimated from the Korea National Health Insurance Claims Database (건강보험 청구자료를 이용한 우리나라 뇌졸증 환자의 사회경제적 비용 추계)

  • Lim, Seung-Ji;Kim, Han-Joong;Nam, Chung-Mo;Chang, Hoo-Sun;Jang, Young-Hwa;Kim, Se-Ra;Kang, Hye-Young
    • Journal of Preventive Medicine and Public Health
    • /
    • v.42 no.4
    • /
    • pp.251-260
    • /
    • 2009
  • Objectives : To estimate the annual socioeconomic costs of stroke in Korea in 2005 from a societal perspective. Methods : We identified those 20 years or older who had at least one national health insurance (NHI) claims record with a primary or a secondary diagnosis of stroke (ICD-10 codes: I60-I69, G45) in 2005. Direct medical costs of the stroke were measured from the NHI claims records. Direct non-medical costs were estimated as transportation costs incurred when visiting the hospitals. Indirect costs were defined as patients and caregivers productivity loss associated with office visits or hospitalization. Also, the costs of productivity loss due to premature death from stroke were calculated. Results : A total of 882,143 stroke patients were identified with prevalence for treatment of stroke at 2.44%. The total cost for the treatment of stroke in the nation was estimated to be 3,737 billion Korean won (KRW) which included direct costs at 1,130 billion KRW and indirect costs at 2,606 billion KRW. The per-capita cost of stroke was 3 million KRW for men and 2 million KRW for women. The total national spending for hemorrhagic and ischemic stroke was 1,323 billion KRW and 1,553 billion KRW, respectively, which together consisted of 77.0% of the total cost for stroke. Costs per patient for hemorrhagic and ischemic stroke were estimated at 6 million KRW and 2 million KRW, respectively. Conclusions : Stroke is a leading public health problem in Korea in terms of the economic burden. The indirect costs were identified as the largest component of the overall cost.

Health Care Utilization and Costs for the Disabled Not Included in the Medical Aid Allowance (의료급여 장애인의 비 급여 의료비용 조사)

  • Rhee Seon Ja;Lee Hyo Young;Kim Mi Ju;Jang Soong Nang
    • Journal of Korean Public Health Nursing
    • /
    • v.17 no.2
    • /
    • pp.287-298
    • /
    • 2003
  • This study was conducted to identify the health care utilization, health care costs, and potential health care demands of the disabled in the Medicaid Aid beneficiaries. This study focused on the heath care costs not included in the medical aid allowance such as transportation, informal nursing costs, and ambulatory aids etc. Participants were the 864 subjects who were beneficiaries of the National Medical Aid program living in 10 district of Korea. A questionnaires were distributed to the disabled in the Medical Aid beneficiaries during August to September, 2001 through public offices. Data were collected through a home visiting by social workers working in public offices. Direct and indirect medical costs expended for one month by the participating disabled were examined. They expended 110.748 won $({\$}100)$ for heath care costs, which was not included in the medical aid allowance during the month. The disabled with cerebral diseases or who have level 4 disability expended more health care costs compare to those with other diseases. Gradual expansion of medical aid allowance for the disabled is recommended to alleviate economic burden of the disabled and their family.

  • PDF

An Institute for Weight and Price index of Estimation System of Historical Cost Data in the Electrical Construction Works (실적공사비 적산제도에서 전기공사비지수의 적정 가중치 및 가격지수에 관한 연구)

  • Seo, S.S.;Jang, Y.K.;Ryu, K.H.;Kim, K.G.;Choi, S.D.;Kim, D.S.;Baek, S.H.;Won, S.H.;Sohn, H.K.;Park, I.P.
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.2092-2093
    • /
    • 2008
  • Since Jan. 2004, the Ministry of Construction and Transportation has partly introduced estimation system of historical cost data in order to reflect result cost of construction market to cost estimation for public construction. And KEPCO started estimation system of historical cost data in the electrical construction works. Electrical construction cost index a matter of great importance. This paper was conducted to examine estimation methods of the items of the price index estimation system of historical cost data and suggest reasonable applications.

  • PDF

A Study of Housing Environment Problems through the Daily newspapers ( II ) -Centering around a excretion and fixing process of lavatory- (일간지를 통해 본 주거환경문제의 연구 ( II ) - 분뇨에서 변소의 정착과정을 중심으로 -)

  • 신경주
    • Journal of the Korean housing association
    • /
    • v.3 no.2
    • /
    • pp.89-99
    • /
    • 1992
  • We discussed the change of housing environmental problems from the early 1900s to the present in Study(I). This study(II) which secendly research of study(I) analyzed the fixing precess of a lavatory centering around a excretion which was a serious housing environmental problem in 1920 to 1940. The documentary research method was used for this study. Articles of content analysis(N=185) were published in 1920 to 1990 which were The Deng-A daily news article about a excretion and a lavatory. The main content of this study was examined the change, such as the number of whole article, the column number of article by time series. and the content of article by subject. 1. The number of whole article by time series was collected mainly in1920s-1930s. In 1940s-1960s, one-two column of article was appeared generally and three-four, five column of article was appeared in 1970-1980. 2. Contents of article was divided into two classes, excretion and lavatory. Contents of excretion was 1) a use of fertilizer 2) the method of transportation 3) a cost of gathering 4) a place of disposal 5) the problem of cleaning. Contents of lavatory was 1) a public lavatory 2) a flush toilet 3) a sanitary conditions 3. 1) A use of fertilizer was concentrated in 1920s-1930s, and problems of it was solved more or less by change of management method. Transportation of excretion developed such as \ulcornerGue\ulcorner->a coach of tank style->underground transportation->a dung car of absorption style. Disposal place of excretion was a cause of dissatisfaction in 1920s and it is serious problem Today. A duty of excretion gathering was transfered to a private worker in 1978. The accunulation problem of excretion was continued until 1940s-1950s. The management law of waste matters was proclaimed in 1986. 2) A public lavatory was planned in 1924 for the first time, and it is insufficient in these days, A settlement of public lavatory in building which has upward of 20pyung became obligation in 1973. The problem of water contamination which by poor septic tank was happened in 1970s-1980s.

  • PDF

Estimation of a Level of Service and Cost of Service Function for Road Pavements for Performance Management in the Public Sector (공공부문 성과관리를 위한 도로포장의 서비스수준과 서비스비용 함수 추정)

  • HAN, Daeseok;LEE, Suhyung;LEE, Sang Hyuk;YOO, In-kyoon
    • International Journal of Highway Engineering
    • /
    • v.18 no.4
    • /
    • pp.9-18
    • /
    • 2016
  • PURPOSES : This study aimed to evaluate the performance of pavement management works and to develop a function for estimating the level of service (LOS) and cost of service (COS) for the systematic and quantitative management of pavement performance in the public sector. METHODS : The International Roughness Index (IRI) was used as the performance index for pavement management. Long-term pavement performance data for a period of 7 years (2007-2014) collected by the National Highway Pavement Management System and historical maintenance budget data published by the South Korean government were used to develop the LOS-COS function. Based on the function, a model for estimating the appropriate budget as well as the network conditions was suggested. RESULTS : There was high degree of correlation between pavement performance and the investment level (R = - 0.74). The developed LOS-COS function suggested that the unit cost to improve the network IRI to 1 m/km was 32.6 billion KRW. Further, the maintenance costs normalized with respect to the LOS levels were LOS-A = 88.2 billion KRW, LOS-B = 55.6 billion KRW, and LOS-C = 23.0 billion KRW. CONCLUSIONS : This study proposes a simple way of developing a LOS-COS function. It also shows how to develop a network budget demand and condition estimation model using the LOS-COS function. In addition, it is the first attempt to evaluate the road maintenance budget in South Korea. It is expected that these results will help in the negotiations between the road managers and budget makers.

Legislation-Method Study for the Bimodal Tram Promotion (바이모달 트램(Bimodal Tram) 활성화를 위한 법정비 방안)

  • Yang, Chul-Su;Kim, Hyun-Woong
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.698-702
    • /
    • 2010
  • While past traffic laws have focused on solving problems related to traffic congestion, the current legislation must play a role in reducing the social cost of solving traffic problems by forecasting future issues based on current traffic situations, setting goals in advance, and leading the traffic modal choice-trend. This paper verifies that the bimodal tram should be an alternative means of public transportation and proposes ways to introduce and promote it based on a government subsidy and the modification of traffic laws.

  • PDF

A Study on the Development Strategies for the Light Rail Transit Industry (경전철 산업 발전방안 연구)

  • Chung Kyung-Ryul;Yoon Se-Kyun;Choi Yong-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.500-509
    • /
    • 2005
  • Light-rail transit system has many characteristics of better accessibility. frequency service, low construction cost, reduced air pollution and medium-capacity public transport etc. Light rail transit system as a urban transportation system has been growing worldwide since the late 20th century. More than 300 cities around the world have light railway systems. Many medium-size cities in domestic site is planning the construction of light railway. This paper describes the development strategies for the light rail transit industry.

  • PDF

Development and Application of Subway's Operating Cost Functions with Full Allocation Method (For Seoul, Incheon, Busan and Daegu) (완전배정방법을 이용한 도시철도 운행비용 모형의 정립과 적용 (서울, 인천, 부산, 대구지하철을 중심으로))

  • Song, Sun-Ah;Suh, Sun-Duck
    • Journal of Korean Society of Transportation
    • /
    • v.22 no.7 s.78
    • /
    • pp.41-48
    • /
    • 2004
  • We may consider the inducement of demand to public transportation as a solution to relieve traffic congestion and pollution. Subway has merits as moving on schedule, transporting more people than bus. But subway is required a vast investment in the early stage of construction has a huge debt. So it runs into red figures, and on this account, services of subway are falling more and more. Development of subway's operation cost function is useful to understand structure of subway's operation and catch the relations of operation cost and actual results. In addition, we can present the policy that is a helpful to the operation as development of operation cost function. But there are short of studies about operation cost deal with a subway comparison with local train. Because local train has many lines and data, on the other hand, subway has one to four lines and less data. Most of previous studies sought the operation cost function of Seoul. So this study aimed to develop and apply the operation cost function of Seoul, Incheon, Busan and Daegu area using full allocation method. In this study, we considered the number of passengers, track-km, train-km, revenue as actual results. By appling the operation cost function, we compared the average cost of each city and confirmed the existence of economies of scale about the number of passengers, train-km.

Development of Optimal Bus Dispatch Simulation for Greenhouse Gas Reduction

  • Jung, Sang Won;Cho, Kyu-Cheol
    • Journal of the Korea Society of Computer and Information
    • /
    • v.27 no.1
    • /
    • pp.141-148
    • /
    • 2022
  • Global climate change caused by greenhouse gases(GHG) is getting serious. To prevent this, countries around the world are regulating GHG emissions. Korea has decided to reduce GHG emissions by 37% compared to BAU (Business As Usual) by 2030. The transportation sector accounted for 18.58% of the domestic GHG emission, and roads accounted for 93.75% of the total. Public transportation is also included in the target of GHG reduction, and this study was conducted to reduce GHG emissions of bus public transportation, which can reduce GHG emissions while reducing the cost of road transportation. In this study, a simulation was conducted to predict the optimal GHG emission compared to the waiting time of passengers by adjusting the bus dispatch interval by implementing a greenhouse gas simulation model using Any Logic. If a more precise model is implemented in the future, it is expected that it will be used to reduce bus GHG emissions.

The State of Light Railway Industry (경전철 산업 현황)

  • Choi, Yong-Hoon;Yoon, Se-Kyun;Kim, Kyung-Taek;Chung, Kyung-Ryul
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2005.05a
    • /
    • pp.454-458
    • /
    • 2005
  • Light railway system has many characteristics of better accessibility, frequency service, low construction cost, reduced air pollution and medium capacity public transport etc. Light railway system as a urban transportation system has been glowing worldwide since the late 20th century. More than 300 cities around the world have light railway systems. Many medium-size cities in domestic site is planning the construction of light railway. This paper reviews the domestic and foreign light railway system.

  • PDF