건설감리제도의 성과분석에 관한 연구(설문조사를 중심으로) (A Study on the Performance Analysis of Construction Supervision System)

  • 한재구;박환표;진경호;오은호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 2부
    • /
    • pp.137-138
    • /
    • 2011
  • This paper aims to analyze the performance of Construction Supervision System that contributed to domestic construction projects in public area with respect to reduction of shoddy constructions and improvement of the quality of construction results. Thus research suggested qualitative and quantitative criteria for assessing outcomes and analyzed the performance of Construction Supervision System based on the result of survey questionnaires.

  • PDF

건설사업관리(CM) 안전관리 정보시스템 개발에 관한 조사연구 (A Field Survey on the Development of Safety Management Information System in the Construction Management)

  • 김영수;박종근
    • 한국안전학회지
    • /
    • 제19권2호
    • /
    • pp.75-87
    • /
    • 2004
  • This study suggests a safety management model for construction management (CM) suitable to domestic conditions so that inefficiency resulted from the operation of construction projects by public and private indtitutes according to different systems can be eliminated for the securing of systematic and efficient safety managment. Based on the suggested safety management model, this study also develops a safety management information system that can efficiently and consistently manage and maintain a large quantity of information, and give necessary supports in a speedy way in the managing of construction projects.

건설공사의 위험도 분석평가 및 모델개발 (Development of a Risk Analysis Assessment Models for the Construction Projects)

  • 이정식
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제3권2호
    • /
    • pp.233-240
    • /
    • 1999
  • Even though the recent construction safety disasters not only result in the loss inside construction sites but also become to a large public disasters, safety activities are managed in an irrational way and safety rules are ignored in the construction sites which leads to occur same type of disasters repeatedly. In this paper, a fuzzy set theoretic approach to risk analysis is proposed as an alternative to the techniques currently used in the general construction projects safety. Then the concept of risk evaluation using linguistic representation of the likelihood, exposure and consequences is introduced. A risk assessment model using approximate reasoning technique base on fuzzy logic is presented to drive fuzzy values of risk and numerical example for risk analysis is also presented to illustrate the results.

  • PDF

토목분야 BIM 적용 사례 분석을 통한 발주자 관점에서의 BIM 발전 전략 (Case study of Civil Engineering BIM Projects: Perspective of Korean Public Owners)

  • 김창윤;문현석;나혜숙;김진욱
    • 한국산학기술학회논문지
    • /
    • 제15권12호
    • /
    • pp.7430-7437
    • /
    • 2014
  • 복잡해지고 대형화되고 있는 국내 외 건설 프로젝트의 변화에 따라 건축 토목 분야 설계 패러다임이 점차 2차원 설계에서 3차원 설계로 이동하고 있다. 건축 분야에서는 발주자의 적극적인 요구에 따라 건설 정보의 효율적 관리를 위하여 Building Information Modeling(BIM) 기술을 활용하고자 많은 연구와 노력이 이루어지고 있다. 그러나 토목 분야에서는 발주자 관점에서의 BIM 기술 적용 사례가 건축 분야에 비해 상대적으로 부족한 실정이며, 대부분의 프로젝트의 발주자가 국가나 공공기관인 토목 분야의 특성상 BIM과 관련된 제도나 기술에 대한 인식 미비로 기술 도입에 소극적인 것이 현실이다. 하지만 최근 토목 분야에서도 BIM 기술의 활용가능성에 주목하여 조달청 및 국토교통부와 같은 정부기관과 공사 공단과 같은 기관에서 관련 제도 정비 및 기술 도입에 적극적으로 노력하고 있다. 이에 본 연구에서는 이러한 정책 및 제도 변화에 발맞추어 나아가기 위하여 대표적인 토목공사 발주 공공기관의 BIM대응 전략에 대하여 살펴보고, 각 기관별로 실제 BIM 적용 사례 분석을 통해 토목분야에서의 BIM 기술에 대한 대응 및 발전 전략에 대하여 도출하였다.

목표달성기여도와 예상적용효과에 의한 시공단계 BIM 주요 업무 도출 - 공공부문 공동주택 건설사업 사례를 중심으로 - (Identification of Major BIM-applicable Tasks with Contribution to Achieving Objectives and Expected Benefit in Construction Stage: Focused on the Case of Public Apartment Housing Projects)

  • 송상훈;방종대;손정락
    • 한국BIM학회 논문집
    • /
    • 제9권3호
    • /
    • pp.41-53
    • /
    • 2019
  • As a central part in smart construction, BIM has been rapidly spread in construction industry at large. However, the level of applying BIM in construction stage is still relatively lower than that in design stage due to unclear application method, inadequate design BIM model, technical faults of BIM itself, etc. Under these circumstances, public owners inevitably need to adjust the scope and pace in BIM application considering their internal support and capabilities of contractors. This study aims to suggest major BIM-applicable tasks during construction stage in the process of establishing gradual long-term and short-term introduction strategy for public apartment housing projects. Those major tasks were identified with the combination of the importance of tasks and the future benefits of BIM using IPA method. To do so, the degrees of contribution to achieving objectives in construction, current task execution, and communication requirement were investigated by internal site managers. On the other hand, the expected benefits and current level of using BIM were assessed by BIM experts. Among operational tasks by phases, design review, construction plan review, making as-built drawing, etc. were categorized as major tasks. In addition, progress control, regular meeting, master schedule development, work inspection, on-site quality check, etc. were also drawn as major tasks by management areas. The results of this study will provide the useful reference for owners concerned about the introduction of new technologies.

공공부문 시공책임형 CM 사업의 시공이전단계 성과분석 (Performance Analysis of Pre-Construction Phase of CM at Risk Project in Public Sector)

  • 박보성;김옥규
    • 한국건설관리학회논문집
    • /
    • 제22권2호
    • /
    • pp.97-105
    • /
    • 2021
  • 발주제도 혁신을 통한 국내 건설산업의 글로벌 경쟁력 강화를 목적으로 시작된 시공책임형 CM 사업이 공공부문에서 시범사업의 형태로 시행되고 있다. 그러나 정식 발주제도로 나아가기 위한 관련 법령 제정까지는 시간이 필요해 보이며, 사업에 대한 성과분석도 아직까지 미진한 상황이다. 이에 본 논문에서는 현재 시행되고 있는 4개의 시범사업의 사업이전단계사업관리(Pre-Construction Service)에 대한 성과분석을 통해 사업의 효과와 신뢰성을 검증하고자 하였다. Team Building, 설계도서 정합성, 공기검토, VE, BIM 활용 등 총 5개의 분야에 대해 성과분석을 진행했으며, 참여자 면담조사를 통해 문제점을 확인하고 그에 대한 개선안을 제시하였다. 본 연구의 결과는 향후 이루어질 발주제도 법제화에 대한 기초자료로 활용될 수 있을 것으로 기대한다.

FTT를 활용한 입찰실무자의 입찰담합 가능성 예측 연구 (A Study on Predicting the Potential for Bid-Rigging among Bidders using FTT in Public Construction Projects)

  • 조진호;신영수;김병수
    • 한국건설관리학회논문집
    • /
    • 제24권6호
    • /
    • pp.36-44
    • /
    • 2023
  • 입찰담합에 따른 공공재정 손실, 경쟁 저해, 신뢰 하락 등의 문제에 대응하기 위해, 공공 건설공사 입찰실무자의 담합 가능성을 예측하고 대응 방안을 개발하는 것을 목적으로 한다. 이를 위해 FTT (Fraud Triangle Theory)의 기회, 압력, 합리화 요인을 분석하여 입찰담합 예방 및 대응 방안을 도출한다. 종합·전문 건설업체의 입찰실무자를 대상으로 한 설문 조사를 통해 FTT 연구모형을 검증하고, 결과를 통해 입찰실무자의 담합 가능성을 예측하는 데 활용한다. 연구 결과, 압력이 높을수록, 기회가 많을수록, 합리화가 강할수록 개인의 담합 가능성이 커지는 것을 확인하였다. 또한, 기회가 많을수록, 합리화가 강할수록 타인의 담합 가능성도 커지는 것을 알 수 있었다. 이러한 현상을 이해하여 입찰담합 예방을 위한 정책 개발에 기여할 것으로 기대된다.

AN INTEGRATED REAL OPTION-RISK MANAGEMENT FRAMEWORK FOR PPP/PFI PROJECTS

  • Jicai Liu;Charles Y.J. Cheah
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.729-738
    • /
    • 2007
  • The Public Private Partnership/Private Finance Initiative (PPP/PFI) schemes have made the private sector become a major participant involved in the development of infrastructure systems along with the government. Due to more integrated efforts among project participants and longer concession period, PPP/PFI projects are inherently more complex and risky. It is therefore very important to proactively manage the risks involved throughout the project life cycle. Conventional risk management strategies sometimes ignore managerial flexibility in the planning and execution process. This paper starts with a revised risk management framework which incorporates the real option concept. Following the presentation of the framework, a new risk classification is proposed which leads to different ways of structuring options in a project according to the stage of the project life cycle. Finally, the paper closes by discussing other issues concerning option modeling and negotiation.

  • PDF

공공공사 사후평가의 사용자 만족도 평가모델에 대한 기초연구 (A Foundation Study for User Satisfaction Degree's Estimated Model of Post-Evaluation in the public construction)

  • 김재우;조창연;신태홍;권순욱;김예상;진상윤
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.432-435
    • /
    • 2008
  • 건설공사의 품질을 확보하고 예산의 절감을 도모하는 등 건설 프로젝트의 성공 여부를 판단하기 위해서는 객관적인 평가지표와 그에 대한 투명성 확보가 필요하다. 건설부문을 포함한 공공사업의 경우 대규모 예산투입이 이루어지고 있지만 그 결과물로 인한 편익을 산정하기 어려울 경우가 많아 공공사업의 효율성과 효용성이 떨어진다고 인식되고 있다. 따라서 본 연구에서는 500억 원 이상의 공공공사 중 사후평가를 실시하는 시설물에 대한 소비자 만족도를 정량화하는 것을 범위로 하여, 공공공사 사후평가 시 체계적이고 정량적인 측정이 가능할 수 있도록 주민 호응도와 사용자 만족도 항목을 중심으로 하는 사후평가 측정기준을 제안하고자 한다.

  • PDF

핵심성공요인과 연계한 공공발주기관의 설계VE 프로세스 개선에 관한 연구 (Improving the Design-phased VE Process of Public Clients in Relation to Using Critical Success Factors)

  • 박희대;한승헌;김성수
    • 대한토목학회논문집
    • /
    • 제29권3D호
    • /
    • pp.399-408
    • /
    • 2009
  • 우리나라 건설사업은 점차 대형화되고 복잡화되는 가운데 예산 및 원가절감에 대한 압박도 점차 높아지고 있다. 이러한 가운데 정부와 공공발주기관들은 경제성 및 품질 향상에 부응하기 위한 발주자 주도의 원가관리기법인 '설계VE(Value Engineering)'을 도입하기 위해 노력해왔다. 국토해양부는 2000년 3월 건설기술관리법시행령을 통해 총공사비 500억원 이상의 1종 시설물 공사에 대하여 설계VE를 의무화하였고 2006년 1월부터는 총공사비 100억원 이상 공사로 그 대상을 확대하였다. 또한 정부는 '경영혁신기본법'과 '공공기관운영에관한법률' 제정을 통해 공공발주기관의 경영혁신 필요성을 제고하고 있어 설계VE의 도입 필요성은 더욱 증가하고 있다. 이에 본 연구는 공공발주기관의 설계VE 성공과 매우 밀접한 7개 부문 총 19개의 핵심성공요인(Critical Success Factors, CSFs)을 도출하고, 10개의 주요기능을 도출한 후 프로세스 모델링기법을 활용하여 공공발주기관의 개선된 설계VE 프로세스를 제시하였다. 연구에서 제시된 프로세스는 공공발주기관인 G사의 사례 연구를 통해 그 효과를 확인하였다. 본 연구결과는 설계VE를 이미 시행하고 있거나 새로 도입하고자 하는 정부, 지방자치단체 및 기타 공기업들이 보다 효과적인 설계VE 프로세스를 도입하는데 활용될 수 있을 것으로 기대된다.