• 제목/요약/키워드: Projects

검색결과 9,636건 처리시간 0.036초

공간정보사업의 중복사업 검색을 위한 의미기반검색 시스템의 설계 (Design of Semantic Search System for the Search of Duplicated Geospatial Projects)

  • 박상언;임재익;강주영
    • 한국IT서비스학회지
    • /
    • 제12권3호
    • /
    • pp.389-404
    • /
    • 2013
  • Geospatial information, which is one of social overhead capital, is predicted as a core growing industry for the future. The production of geospatial information requires a huge budget, so it is very important objective of the policy for geospatial information to prevent the duplication of geospatial projects. In this paper, we proposed a semantic search system which extracts possible duplication of geospatial projects by using ontology for geospatial project administration. In order to achieve our goal, we suggested how to construct and utilize geospatial project ontology, and designed the architecture and process of the semantic search. Moreover, we showed how the suggested semantic search works with a duplicated projects search scenario. The suggested system enables a nonprofessional can easily search for duplicated projects, therefore we expect that our research contributes to effective and efficient duplication review process for geospatial projects.

건축공사 환경관리비 운영체계 비교 분석 (Comparative Analysis of the Environmental Management Cost in Building Construction Sites)

  • 구자건
    • KIEAE Journal
    • /
    • 제10권4호
    • /
    • pp.111-116
    • /
    • 2010
  • The environmental management is essential for construction projects. The environmental management cost for construction projects is used for various purposes to control the environmental pollution and treat the wastes generated from the construction sites. Six construction cases were analyzed to compare the environmental management cost. The proportion of environmental management cost for total construction budget should be higher than 0.70% in redevelopment projects and 0.30% in newly constructed buildings, respectively, but every six construction cases did not meet the legal requirement. Redevelopment projects expanded more environmental management cost than the newly constructed projects especially in noise control and wastes treatment. In case of apartment construction projects, the proportion of environmental management cost of redevelopment buildings is 2.4 times higher than the newly constructed buildings, but in all cases, paid more attention to the noise and waste controlling measures than the wastewater treatment. It is needed to ensure the cost-effectiveness of environmental management for achieving the eco-friendly construction sites.

Study on the Layout of Water Diversion Projects Influenced by China's Macro Developing Strategies

  • Peng, Xiang
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2008년도 학술발표회 논문집
    • /
    • pp.59-66
    • /
    • 2008
  • A country's macro developing strategies will greatly impose upon its water resources allocation. Based upon the relationship between national macro developing strategies and water diversion projects layout, the paper discusses the vital influence of water diversion projects caused by China's food security and sustainable development strategy implemented in recent years, and points out that it is an inevitable choice of constructing inter-basin water diversion projects in north China in view of local water resources can't meet the demand of socio-economic development and eco-environment protection, and then recommends China's water diversion projects layout in the current and future, which attaching most importance to the South-to-North Water Diversion Project.

  • PDF

우리나라의 학교보건제도와 학교보건사업의 발달: 1945~2010년 (Development of School Health System and Projects in Korea from 1945 to 2010)

  • 장창곡
    • 한국학교보건학회지
    • /
    • 제25권2호
    • /
    • pp.143-146
    • /
    • 2012
  • Purpose: The purpose of this study was to review the academic development of school health system and projects implemented in Korea since 1945. Methods: This study analyzed and reviewed literatures to find out the process of the development of school health system and projects implemented in Korea. Results: The history of school health in Korea since 1945 could be divided into three periods according to the development of school health system and projects; countermeasure period (1945-1969), support period (1970-1999), and innovation period (2000~). The major school health system and projects were focused on the health screening and prevention, health management and support, and health promotion for each period. Conclusion: School health system in Korea has been set successfully due to school health law(1967) and school meal law(1981), and various countermeasure, support, and innovation projects had implemented during last 60 years.

  • PDF

건설공사의 확률적 위험도분석 시스템 모형 및 해석방법 (Probabilistic Risk Assessment System Model and Methods for Construction Projects)

  • 조효남;최현호;김윤배
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1999년도 봄 학술발표회 논문집
    • /
    • pp.3-10
    • /
    • 1999
  • This paper presents probabilistic risk assessment system model and methods for general construction projects and demonstrates the applicability of the approach to a specific subway construction project. The proposed system model entitled Integrated Risk Assessment System(IRAS) for construction projects is composed of four steps, which is newly reorganized and improved in order to be easily adjusted for a systematic PRA of construction projects. Based on the proposed model, and integrated prototype software is then developing for computer-aided PRA of construction projects under the environment of the graphic-user interface, which will be successfully applied to construction projects.

  • PDF

지방농정 자율성 확대를 위한 농림수산 포괄보조금제 운용 방안 (Introduction of the Block Grant in Agriculture, Forestry, and Fishery Sectors)

  • 조재환;이한성
    • 농촌계획
    • /
    • 제19권3호
    • /
    • pp.145-155
    • /
    • 2013
  • This study proposed the introduction of the block grant in agriculture, forestry, and fishery sectors so that the local governments get greater autonomy in agricultural policy. First of all, theoretical background on block grant was reviewed and present situation in Korea regarding block grant was examined. Four criteria were set to evaluate the eligibility for the block grant. Four criteria imply that block grant is more appropriate with small-scaled similar projects, high locality projects, easily evaluated projects, and easily formula-applied projects. Applying these criteria to the projects subsidized by the national government, appropriate projects as the block grant were selected. Finally, specific operation scheme of the block grant was proposed.

The Public-Private Partnerships and the Fiscal Soundness of Local Governments in Korea

  • LEE, HOJUN
    • KDI Journal of Economic Policy
    • /
    • 제39권1호
    • /
    • pp.41-82
    • /
    • 2017
  • This paper studies the risks associated with local finance in Korea by identifying the financial status of each local government, including the financial burdens of PPP projects, and examined governmental future burdens related to PPP projects. We reviewed all fiscal burdens associated with projects, such as, for BTL (Build-Transfer-Lease) types of projects, facility lease and operating expenses, and, for the BTO (Build-Transfer-Operate) types of projects, construction subsidies that are paid at the construction stage, MRG (Minimum Revenue Guarantee) payments and the government's share of payment. Furthermore, we compared the annual expenditures of local governments on PPP projects against their annual budgets and checked if the 2% ceiling rule could be applied.

BTL사업의 사업시행자 평가기준 개선 요인 분석 (Improvement Factors of Promoter Selection Evaluation Criteria for Build-Transfer-Lease Private Participation in Infrastructure Projects)

  • 신현인;박태근
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.310-316
    • /
    • 2006
  • Since 'Act on Private Participation in Infrastructure' were changed in January 2005, BTL(Build-Transfer-Lease) projects of Private Participation in Infrastructure was introduced in the domestic construction market for the purpose of providing public facilities with the public. Selecting the most qualified Promoter should be considered discreetly in BTL projects because BTL projects is for projects with approximately thirty year project life cycle, plan, construction, operating, maintenance and obviously the success of the project totally depends on the capability and role of Promoter. However, score for cost is likely to influence selecting Promoter to take the project. Accordingly, low bid contract with too much competition could decrease the quality of the construction plan and operating plan. Thus, this study did preliminary research and documents on problems of evaluation criteria for selecting Promoter in BTL projects, and proposed improvement factors by doing questionnaire over specialists of each field.

  • PDF

농촌마을종합개발사업에서 상하수도시설의 합리적 계획방향에 관한 기초적 연구 (A Study on the Rational Planning of Water Supply and Sewage System for Rural Village Development Projects)

  • 김환용
    • 한국농촌건축학회논문집
    • /
    • 제8권2호
    • /
    • pp.62-71
    • /
    • 2006
  • This study on the rational planning of water supply and sewage system for rural village development projects. Present, when establishment and standard about maintenance of water supply and sewage system were not presented in rural village synthesis development projects, it is real condition that service industry is depending on presenting simple plan in basis planning phase and business enforcement step. This study wishes to present basic data so that can be planned more rationally and enforce and contribute in rural village synthesis development projects water supply and sewage system that is enforced as part of rural village synthesis development projects.

  • PDF

A Probabilistic Fuzzy Logic Approach to Identify Productivity Factors in Indian Construction Projects

  • Princy, J. Darwin;Shanmugapriya, S.
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권3호
    • /
    • pp.39-55
    • /
    • 2017
  • Preeminent performance of construction industry are unattainable with poor productivity resulting in time and cost over runs. Enhancement in productivity cannot be achieved without identifying and analyzing factors that adversely affect productivity. The objective therefore is to propose a productivity analysis model to quantify the probability of effect of factors influencing productivity by using fuzzy logic incorporated with relative importance index method, for various types of construction projects. To achieve this objective, a questionnaire survey was carried out targeting respondents of Indian construction industry, from four distinct projects, namely, residential, commercial, infrastructure and industrial projects. Based on questionnaire administered, the relative importance and ranks of factors demonstrated using relative importance index method. Probability assessment model to analyze productivity was then developed by using Fuzzy Logic Toolbox of MATLAB. The applicability of the proposed model was tested in seven construction projects and the probability of impact of factors on productivity evaluated. The results of application of model in the construction firms infers that the most contributing factor groups for most of the projects were discerned to be manpower, motivation and time group.