Browse > Article
http://dx.doi.org/10.6106/JCEPM.2017.9.29.039

A Probabilistic Fuzzy Logic Approach to Identify Productivity Factors in Indian Construction Projects  

Princy, J. Darwin (Coimbatore Institute of Technology)
Shanmugapriya, S. (Department of Civil Engineering, Coimbatore Institute of Technology)
Publication Information
Journal of Construction Engineering and Project Management / v.7, no.3, 2017 , pp. 39-55 More about this Journal
Abstract
Preeminent performance of construction industry are unattainable with poor productivity resulting in time and cost over runs. Enhancement in productivity cannot be achieved without identifying and analyzing factors that adversely affect productivity. The objective therefore is to propose a productivity analysis model to quantify the probability of effect of factors influencing productivity by using fuzzy logic incorporated with relative importance index method, for various types of construction projects. To achieve this objective, a questionnaire survey was carried out targeting respondents of Indian construction industry, from four distinct projects, namely, residential, commercial, infrastructure and industrial projects. Based on questionnaire administered, the relative importance and ranks of factors demonstrated using relative importance index method. Probability assessment model to analyze productivity was then developed by using Fuzzy Logic Toolbox of MATLAB. The applicability of the proposed model was tested in seven construction projects and the probability of impact of factors on productivity evaluated. The results of application of model in the construction firms infers that the most contributing factor groups for most of the projects were discerned to be manpower, motivation and time group.
Keywords
Productivity; Construction; Fuzzy logic; Relative importance index; Probability assessment model;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Alinaitwe, H.M., Mwakali, J.A., Hanson, B., "Factors affecting the productivity of building craftsmen-Studies of Uganda", Journal of Civil Engineering & Management, vol. 13, no. 3, pp. 169-176, 2007.
2 Alwi, S., "Factors influencing construction productivity in the Indonesian context", Proceedings of the 5th EASTS Conference, Fukuoka, Japan. QUT ePrints, Brisbane, QLD, pp. 1557-1571, 2003.
3 Anu V. Thomas, Sudhakumar, J., "Critical analysis of the key factors affecting construction labour productivity- An Indian perspective", International Journal of Construction Management, vol. 13, no. 4, pp. 103-125, 2013. DOI: 10.1080/15623599.2013.10878231.   DOI
4 Borcherding, J.D., Palmeter, S.B., Jansma, G.L., "Workforce management programs for increased productivity and quality work", EEI Construction Committee Spring Meeting, pp. 4-9, 1986.
5 Cox, E. and O'Hagen, M., "The Fuzzy systems handbook: A practitioner's guide to building, using and maintaining fuzzy systems". AP Professional, Cambridge, MA, 1998.
6 Dai, J., Goodrum, P.M., Maloney, W.F., "Construction craft worker's perceptions of the factors affecting their productivity", Journal of Construction Engineering & Management, vol. 135, no. 3, pp. 217- 226, 2009. DOI: 10.1061/ (ASCE) 0733-9364(2009)135:3(217).   DOI
7 Dai, J., Goodrum, P.M., Maloney, W.F., et al., "Latent Structures of the factors affecting construction labour productivity". Journal of Construction Engineering & Management, vol. 135, no. 5, pp. 397- 406, 2009. DOI: 10.1061/ (ASCE) 0733-9364(2009) 135:5(397).   DOI
8 Fayek, A.R. and Oduba, A., "Predicting Industrial Construction Labour Productivity Using Fuzzy Expert Systems", Journal of Construction Engineering and Management, vol. 131, no. 8, pp. 938-941, 2005. DOI: 10.1061/ (ASCE) 0733-9364(2005)131:8(938).   DOI
9 El-Gohary, K.M., Aziz, R.F., "Factors influencing construction labour productivity in Egypt". Journal of Management in Engineering, vol. 30, no. 1, pp. 1-9, 2014.   DOI
10 Enshassi, A., Mohamed, S., Mustafa, Z.A., et al., "Factors affecting labour productivity in building projects in the Gaza strip", Journal of Civil Engineering and Management, vol. 13, no. 4, pp. 245-254, 2007. DOI: 10.1080/13923730.2007.9636444.
11 Jarkas, A.M., and Bitar, C.G., "Factors affecting construction labour productivity in Kuwait", Journal of Construction Engineering and Management, vol. 138, no. 7, pp. 811-820, 2012. DOI: 10.1061/(ASCE)CO.1943-7862.0000501.   DOI
12 Koehn, E., "Fuzzy sets in construction engineering", Proc. CZB W-65. Waterloo, Ont., Canada, 1984.
13 Makulsawatudom, A., Emsley, M.W., Sinthawanarong, K., "Critical factors affecting construction productivity in Thailand", Journal of King Mongkut's University and Technology, vol. 14, no. 3, pp. 1-6, 2004.
14 Rivas, R.A., Borcherding, J.D., Gonzalez, V., et al., "Analysis of factors influencing productivity using craftsmen questionnaires: Case study in a Chilean construction company", Journal of Construction Engineering and Management, vol. 137, no. 4, pp. 312-320, 2011. DOI: 10.1061/ (ASCE) CO.1943-7862.0000274.   DOI
15 Zadeh, L. A., "Fuzzy set. Information and Control", vol. 8, no. 3, pp. 338-353, 1965.   DOI