1 |
Alinaitwe, H.M., Mwakali, J.A., Hanson, B., "Factors affecting the productivity of building craftsmen-Studies of Uganda", Journal of Civil Engineering & Management, vol. 13, no. 3, pp. 169-176, 2007.
|
2 |
Alwi, S., "Factors influencing construction productivity in the Indonesian context", Proceedings of the 5th EASTS Conference, Fukuoka, Japan. QUT ePrints, Brisbane, QLD, pp. 1557-1571, 2003.
|
3 |
Anu V. Thomas, Sudhakumar, J., "Critical analysis of the key factors affecting construction labour productivity- An Indian perspective", International Journal of Construction Management, vol. 13, no. 4, pp. 103-125, 2013. DOI: 10.1080/15623599.2013.10878231.
DOI
|
4 |
Borcherding, J.D., Palmeter, S.B., Jansma, G.L., "Workforce management programs for increased productivity and quality work", EEI Construction Committee Spring Meeting, pp. 4-9, 1986.
|
5 |
Cox, E. and O'Hagen, M., "The Fuzzy systems handbook: A practitioner's guide to building, using and maintaining fuzzy systems". AP Professional, Cambridge, MA, 1998.
|
6 |
Dai, J., Goodrum, P.M., Maloney, W.F., "Construction craft worker's perceptions of the factors affecting their productivity", Journal of Construction Engineering & Management, vol. 135, no. 3, pp. 217- 226, 2009. DOI: 10.1061/ (ASCE) 0733-9364(2009)135:3(217).
DOI
|
7 |
Dai, J., Goodrum, P.M., Maloney, W.F., et al., "Latent Structures of the factors affecting construction labour productivity". Journal of Construction Engineering & Management, vol. 135, no. 5, pp. 397- 406, 2009. DOI: 10.1061/ (ASCE) 0733-9364(2009) 135:5(397).
DOI
|
8 |
Fayek, A.R. and Oduba, A., "Predicting Industrial Construction Labour Productivity Using Fuzzy Expert Systems", Journal of Construction Engineering and Management, vol. 131, no. 8, pp. 938-941, 2005. DOI: 10.1061/ (ASCE) 0733-9364(2005)131:8(938).
DOI
|
9 |
El-Gohary, K.M., Aziz, R.F., "Factors influencing construction labour productivity in Egypt". Journal of Management in Engineering, vol. 30, no. 1, pp. 1-9, 2014.
DOI
|
10 |
Enshassi, A., Mohamed, S., Mustafa, Z.A., et al., "Factors affecting labour productivity in building projects in the Gaza strip", Journal of Civil Engineering and Management, vol. 13, no. 4, pp. 245-254, 2007. DOI: 10.1080/13923730.2007.9636444.
|
11 |
Jarkas, A.M., and Bitar, C.G., "Factors affecting construction labour productivity in Kuwait", Journal of Construction Engineering and Management, vol. 138, no. 7, pp. 811-820, 2012. DOI: 10.1061/(ASCE)CO.1943-7862.0000501.
DOI
|
12 |
Koehn, E., "Fuzzy sets in construction engineering", Proc. CZB W-65. Waterloo, Ont., Canada, 1984.
|
13 |
Makulsawatudom, A., Emsley, M.W., Sinthawanarong, K., "Critical factors affecting construction productivity in Thailand", Journal of King Mongkut's University and Technology, vol. 14, no. 3, pp. 1-6, 2004.
|
14 |
Rivas, R.A., Borcherding, J.D., Gonzalez, V., et al., "Analysis of factors influencing productivity using craftsmen questionnaires: Case study in a Chilean construction company", Journal of Construction Engineering and Management, vol. 137, no. 4, pp. 312-320, 2011. DOI: 10.1061/ (ASCE) CO.1943-7862.0000274.
DOI
|
15 |
Zadeh, L. A., "Fuzzy set. Information and Control", vol. 8, no. 3, pp. 338-353, 1965.
DOI
|