• Title/Summary/Keyword: Project type

Search Result 1,534, Processing Time 0.029 seconds

A Review of the Improvement of Construction Management (CM) System and the CM Policy for the Public Construction Works (공공사업의 CM제도 개선 및 정책방향)

  • Jang Kie-Chang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.207-212
    • /
    • 2002
  • The Construction Management(CM) System in Korea is systematized both in name and reality by being prescribed in Construction Industry Act('97) and Construction Management Act('01) through various discussions considering reformation of construction industry structure and enhancement of construction technology competitiveness. Specially in the public construction works, CM Pilot Project is promoted by central government for the activation of CM system introduced for efficiency of public construction project. The promotion of Pilot Project is not only the settlement and activation of CM system but also the process to embody and diversify the CM system. Now we should develop various CM application type such as Owner type, PM type and type for private capital project in doing so. And with this efforts, we could expect that CM system should play an important role to enhance the efficiency of public construction works and should affect private construction sector.

  • PDF

A Study of Development Schedule Estimation Based on Development Type (소프트웨어 개발형태 기반 개발기간 추정 연구)

  • Park Seok-Gyu;Kim Woon-Yong
    • Journal of the Korea Computer Industry Society
    • /
    • v.7 no.3
    • /
    • pp.191-198
    • /
    • 2006
  • Area of software measurement is active more than thirty years. There is a huge collection of researches but still no concrete software development effort, duration and cost estimation model. The data sets used to conduct previous studies in the duration estimation model are often small and not too recent, these types of models should not be apply in recent projects that have complex architecture and various development environment. Therefore, Oligny et al. presents empirical models that predict software project duration in accordance with project platform based on project effort using the log data transformation. These models are based on the analysis of 396 project data provided by release 4 of the ISBSG Benchmark. Applying Oligny et al.'s models to 534 project data provided release 6 of the ISBSG Benchmark, the project duration is affected by development type more than development platform. Therefore, This paper presents the model of duration estimation according to development type. This paper proves the duration is more affected by development type than development platform. And, The model according to development type is more adequate for duration estimation.

  • PDF

Development of Loss Model Based on Quantitative Risk Analysis of Infrastructure Construction Project: Focusing on Bridge Construction Project (인프라건설 프로젝트 리스크 분석에 따른 손실 정량화 모델 개발 연구: 교량프로젝트를 중심으로)

  • Oh, Gyu-Ho;Ahn, Sungjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.208-209
    • /
    • 2022
  • This study aims to analyze the risk factors caused by object damage and third-party damage loss in actual bridge construction based on past insurance premium payment data from major domestic insurers for bridge construction projects, and develop a quantitative loss prediction model. For the development of quantitative bridge construction loss model, the dependent variable was selected as the loss ratio, and the independent variable adopted 1) Technical factors: superstructure type, foundation type, construction method, and bridge length 2) Natural hazards: flood anf Typhoon, 3) Project information: total construction duration, total cost and ranking. Among the selected independent variables, superstructure type, construction method, and project period were shown to affect the ratio of bridge construction losses, while superstructure, foundation, flood and ranking were shown to affect the ratio of the third-party losses.

  • PDF

Analysis of Biotope Area Ratio in the Environmental Impact Statements (환경영향평가서에 나타난 개발사업의 생태면적률 검토 연구)

  • Lee, Sang-Don
    • Journal of Environmental Impact Assessment
    • /
    • v.27 no.4
    • /
    • pp.394-401
    • /
    • 2018
  • Tendency in ratio of biotope area of environmental impact assessment (EIA) according to population, location, project type, and total project area was analyzed by type of the projects. According to EIA, biotope area ratio is the ratio of the weighted biotope areas and total project area. biotope area is important to resident's health and quality of their life. Ministry of Environment recommends to meet the biotope area ratio standard presented by each project type. The analysis is based on 4 types of project, urban development, industrial comlpex deveopment, tourism development, and waste and sewerage treatment facility, and 55 data extracted from them. It is needed that new standard that the population is reflected, adjustment that region and frequency are considered, and regulation strengthening according to achievement of 'the minimum achievable goals' to improve biotope area policy. The research includes more data and improvements of specific system are needed as a further research.

A Study on the Expansion and Revitalization Plan when Conceiving Civil and Military Sharing Facilities - Factor Analysis and Analytic Hierarchy Process - (민군 시설공용 확대 및 활성화 방안에 관한 연구 - 요인 분석과 AHP분석 기법으로 -)

  • Gong, Keum Rok;Park, Young Jun
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.5
    • /
    • pp.19-26
    • /
    • 2018
  • A civil-military facility sharing project is a part of mutual cooperative efforts, which enables the military to use any civilian (local government or company) or a civilian to use any military facility. Such facility sharing project may reduce or clear possible conflicts with the local residents in the surrounding area of a military facility while being available to save budgets for new construction or maintenance of a defense or military facility. Various measures have been proposed for institutional resolutions on conflicts with the local residents in the surrounding area of a military facility. This study collects and organizes previous cases of the civilian-military facility sharing projects, and analyzes the characteristics of such cases based on the project types. In addition, by organizing and proposing the project characteristics, plans (ideas) and determination criteria to expand and vitalize are presented regarding the project types having restrictions. AHP technique is employed to research on the matrix for the project feasibility determination. Also, the opinions organized through the cause analysis are categorized and presented as a project for the expansion and vitalization of future project. According to the rearch result, Type I, II and III are determined to be projects that can be implemented without difficulties. Type IV, on the other hands, is determined as not illegal, yet inadequate so that some legal and institutional complements are required to expand and vitaliza this facility sharing project.

The Strategy for Improvement of System md Model Development for Upland Area Integrated Improvement Project (밭지역 종합정비를 위반 모델 개발 및 제도개선방안)

  • Kim Young Hwa;Han Kuk Heon;Park Ji Sung;Kim Chae Soo
    • KCID journal
    • /
    • v.11 no.1
    • /
    • pp.64-76
    • /
    • 2004
  • For effective development of upland areas, e development model of upland area integrated improvement project are suggested which on standard type and integrated infrastructure improvement type, rural Income raising type and eco-friendly consolidation type

  • PDF

Development of Time-Cost Models for Building Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh;Chun, Yong Hyun
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.13-20
    • /
    • 2014
  • Estimating time and cost is an important mission in the early phase of a construction project, especially in feasibility study. It provides a foundation for making decision whether or not the project is performed on schedule and within budget. Thus, reliability of this estimate plays a key role in measuring the success of a project. This study was carried out to investigate the time-cost relationship in building construction projects in Bangladesh. The mathematical equation used in this study is based on Bromilow's equation. The research data were collected from sixty-three completed building projects through questionnaire survey. Type of clients, type of projects, and tender methods are the project characteristics considered in this study. The results of analysis indicated that the Bromilow's time-cost (BTC) models developed for each project characteristic are appropriate due to quite high coefficient of determination and relatively small mean percent errors. Among them, the forecasted model for time and cost according to tender methods is the best fit model. It is concluded that the BTC model could be applied in building construction project to predict its time and cost in Bangladesh. Four different regression models were also developed in this study. The results of BTC model between some selected countries were compared to gain the comprehensive view.

A Study on the Impact of Project Performance According to the Implementation type of PMO Function : Focus on Information and Communication Technology Industry (PMO 기능 도입유형에 따른 프로젝트 성과의 영향 연구 : ICT 산업을 중심으로)

  • Lee, Mu-Geon;Kim, Seung-Chul;Boo, Je-Man
    • Journal of Information Technology Services
    • /
    • v.16 no.2
    • /
    • pp.61-83
    • /
    • 2017
  • It is well known that PMO (Project Management Office)s are effective for successful project performance. Since it takes a long time to develop PMO capability, many public organizations and companies that do not have internal PMOs are increasingly relying on outsourcing of PMO functions in order to introduce mature PMO capabilities in a short period of time. However, it is not verified yet whether outsourced PMO is more effective than internal PMO or not. The objective of this study is to verify the effectiveness of PMO outsourcing. There are many different definitions about PMO function, and even the same PMO function may have different effectiveness depending on the Industry. Thus, this study redefined the PMO functions and Project Performance based on the past studies, and conducted research by focusing on the ICT (Information and Communication Technology) industry. The ICT industry is an important industry economically and has been attracting global attention recently. This study is the first attempt to prove the effectiveness of outsourcing of PMO function in Korea. We found that PMO function outsourcing is effective for certain aspects of project performance, particularly technical support and infrastructure management. Overall, PMO outsourcing is usually more effective than internal PMO for improving project performance. The results of this study are expected to contribute to the development of PMO theories and practices.

Waterfront Development Project Pattern Analysis of the Coastal Zone Management of the Osaka Bay

  • Yang, Jae-Joon;Yhang, Wii-Joo
    • Journal of Navigation and Port Research
    • /
    • v.27 no.3
    • /
    • pp.329-333
    • /
    • 2003
  • Study of the background and state of Osaka's waterfront space development and analysis of the functions of 22 chosen major facilities of development project reveals the following four types: amenity-oriented development, large-scale synthesis type development, renewal compound area type development, exchange communication promotion type development. Osaka bay area has served primely as the base of harbors, industry and energy, while analysis of the ongoing project has found that the city has been making a functional transition to a type of development to live up to the needs of the times, suggesting that is wise that Korea's future direction of waterfront development be oriented toward environmental-friendly development by taking advantage of low-density area's natural resources. Given the plurality and complexity of the law of coastal zone, what is needed is a legal maintenance for coastal zone's clear-cut coordinating function and for environmental-friendly development with the limitations of seaside and coastal functions in mind.

Key Success Factors of Collaborative R&D Projects in the Small and Medium-Sized Companies in the Korean Electronic Parts Industry (우리나라 전자부품 중소기업에 있어서 공동기술개발의 성패요인)

  • 이광회;김영배
    • Proceedings of the Technology Innovation Conference
    • /
    • 1997.12a
    • /
    • pp.104-130
    • /
    • 1997
  • This study empirically examined different patterns of collaborative R&D project with their key success factors(KSFs), using data from 80 projects in the Korean electronic parts industry The patterns in this study were categorized into 4 types by two criteria : product types(off-the-shelf/unique) and project initiator (focal/partner). The bivariate relationships revealed that project characteristics (technological complexity, demand certainty), partner characteristics(the number of partners, precious experience), process characteristics (participation in the project formulation, specificity of the collaboration process and outcomes) appear to be different among four types of collaboration. Furthermore, this study found that each type of collaborative R&D projects has different KSFs for their commercial success. The KSFs of type 1 (off-the-shelf product and focal organization initiation), for instance, include the strategic importance of the project, the problem solving performance of the focal organization while those of type 4(unique product and partner initiation) are technological complexity, demand certainty, reliability of partner relationship, specificity of the goals, specificity of the process and outcomes, information sharing. Finally, based on this empirical results, managerial, policy, and theoretical implications of the study were discussed.

  • PDF