• 제목/요약/키워드: Project risks

Search Result 420, Processing Time 0.029 seconds

Applying Fire Risk Analysis to Develop Fire-safe Modular Walls: Guidance to Material Selection, Design Approach and Construction Method

  • Lim, Seokho;Chung, Joonsoo;Kim, Mihyun Esther
    • Architectural research
    • /
    • v.24 no.2
    • /
    • pp.21-27
    • /
    • 2022
  • For the past decade, South Korea had experienced catastrophic building fires, which resulted in consider-ably high number of casualties. This motivated research to develop fire-safe wall assemblies. In this study Fire Risk Analysis (FRA) is conducted as part of the project designing phase to ensure fire safety of the final product. Traditional approach was to consider fire performance at the end of the designing stage, when PASS/FAIL fire test results are required to be submitted to the Authority Having Jurisdiction (AHJ). By applying a fire risk analysis to guide the designing phase, overall fire safety of a wall assembly can be achieved more systematically as conducting FRA allows designers to clearly identify elements that are more vulnerable to fire and simply replace them with other practical options. Severity of fire risk is determined by considering the fire hazards of a wall assembly such as the exterior layer, insulation, vertical connectivity, and external ignition sources (e.g., photovoltaic panels). Frequency of fire risk is assessed based on the factors affecting fire likelihood, which are air cavity and fire-stopping applied in the design, and random design changes occurring during on-site construction. Fire risk matrix is proposed based on these fire risk factors and efforts to reduce the fire risk level associated with the wall assembly are given by systematically assessing the fire risk factors identified from fire risk analysis. Current study demonstrates how fire risk analysis can be applied to develop fire-safe walls by reducing the relevant fire risks- both severity and frequency.

A Policy Dilemma Analysis on ICT SMEs after COVID19 (코로나19 이후 ICT 중소벤처기업 정책 딜레마분석)

  • Lee, Jung Mann;Cho, Sangseop
    • Journal of Information Technology Applications and Management
    • /
    • v.29 no.4
    • /
    • pp.1-16
    • /
    • 2022
  • This study analyzed the policy dilemma for ICT SMEs venture companies that changed after COVID-19 based on the results of the cognitive map analysis for ICT SMEs venture policies. First, as a result of analyzing the cognitive map of ICT SMEs venture companies that have changed since COVID-19, ICT venture companies are expanding support for ICT venture companies due to the threat of COVID-19. However, in order to convert COVID-19 into an opportunity factor, it also shows a policy direction to achieve innovative growth by creating a new market through non-face-to-face industry revitalization based on digital transformation (digital new deal). As a result of the study, the policy measures of supporting DNA-centered convergence innovation technology, digital transformation (digital new deal), fostering ICT startups (K-Global project), and expanding support for ICT SMEs did not have a policy dilemma. However, although many support has been expanded for ICT SMEs due to COVID-19, it is difficult to find and foster ICT start-up companies, and globalization problems are occurring due to the decrease in exports to COVID-19, making it difficult to create new markets. There is a negative (-) perception of causality that ICT SMEs venture companies may face risks as jobs decrease and innovative growth cannot be led to the revitalization of the non-face-to-face industry. Therefore, it was found that both the flow of causal relationship between the expansion of support for ICT SMEs and the high growth of ICT SMEs is not + and has a policy dilemma in part.

Status of Government Funded Projects for "Laboratory Safety" ('연구실 안전' 관련 정부연구개발사업 동향 분석)

  • Suh, Jiyoung;Kim, Hyemin;Bae, Sunyoung;Park, Jeongim
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.31 no.4
    • /
    • pp.396-416
    • /
    • 2021
  • Objectives: This study was conducted to analyze the trends of government R&D (R&D) projects related to laboratory safety over the past 20 years. Methods: We collected publications from various databases(DBs) with words such as laboratory(ies), lab(s), researcher(s), laboratory worker(s), safety, environment, hazard(s), risk(s), and so on. Selected publications were analyzed by the research funds and the number of projects according to the investment subject and research characteristics. Results: About 93% of the total R&D budget went to government policy projects, not scientific research. Second, from the perspective of 'safety management activities', most of the research is related to management and inspection at the organizational level. Issues that need to be discussed at the national level like policy governance are not included. Third, focusing on the 'safety management cycle', there were few studies related to 'prediction' or 'post-response'. Fourth, when an analysis framework combining the perspectives of 'safety management activities' and 'safety management cycle' is applied, most of the budget is spent on infrastructure such as digital management systems, whereas basic knowledge for prevention and production of evidence was very few. Conclusions: In order to prevent policy planning without policy evaluation, implementation without strategy, and evaluation without evidence, it is necessary to expand investment in empirical research on risks, research on the effectiveness of current application methods, and research on theory development. The government budget for laboratory safety-related projects should be managed separately from the R&D budget for scientific research. Although less than 5% of the budget allocated to scientific research is the total budget, an optical illusion occurs because both the project budget and the scientific research budget are counted as R&D budgets.

A Worker-Driven Approach for Opening Detection by Integrating Computer Vision and Built-in Inertia Sensors on Embedded Devices

  • Anjum, Sharjeel;Sibtain, Muhammad;Khalid, Rabia;Khan, Muhammad;Lee, Doyeop;Park, Chansik
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.353-360
    • /
    • 2022
  • Due to the dense and complicated working environment, the construction industry is susceptible to many accidents. Worker's fall is a severe problem at the construction site, including falling into holes or openings because of the inadequate coverings as per the safety rules. During the construction or demolition of a building, openings and holes are formed in the floors and roofs. Many workers neglect to cover openings for ease of work while being aware of the risks of holes, openings, and gaps at heights. However, there are safety rules for worker safety; the holes and openings must be covered to prevent falls. The safety inspector typically examines it by visiting the construction site, which is time-consuming and requires safety manager efforts. Therefore, this study presented a worker-driven approach (the worker is involved in the reporting process) to facilitate safety managers by developing integrated computer vision and inertia sensors-based mobile applications to identify openings. The TensorFlow framework is used to design Convolutional Neural Network (CNN); the designed CNN is trained on a custom dataset for binary class openings and covered and deployed on an android smartphone. When an application captures an image, the device also extracts the accelerometer values to determine the inclination in parallel with the classification task of the device to predict the final output as floor (openings/ covered), wall (openings/covered), and roof (openings / covered). The proposed worker-driven approach will be extended with other case scenarios at the construction site.

  • PDF

A Development of Integrated Prototype Model for Risk Management of Construction Projects (건설공사의 리스크관리를 위한 통합전산모형 구축)

  • Kim, Chang-Hak;Park, Seo-Young;Kang, In-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3D
    • /
    • pp.469-480
    • /
    • 2006
  • The results of the study include a computerized system and a systematic process model for risk management and analysis. This study analyzes the present status of risk management in the construction industry, and then suggests reasonable methods for improved risk management plans. This study defines risk management procedures as preparation, identification, analysis, response and management to manage potential risks in the construction project. The modules for computerizing in this system consist of planning, construction, application of WBS (Work Breakdown Structure) and RBS (Risk Breakdown Structure), and risk analysis. The methodology for analyzing construction risk uses fuzzy theory, and the scope of developed system is focused to the contractors. The risk management system suggested in this study operates on the Internet, for providing contractors with a useful risk management tool by online system, with web-based menus that is helpful for practical application.

Correlation Extraction from KOSHA to enable the Development of Computer Vision based Risks Recognition System

  • Khan, Numan;Kim, Youjin;Lee, Doyeop;Tran, Si Van-Tien;Park, Chansik
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.87-95
    • /
    • 2020
  • Generally, occupational safety and particularly construction safety is an intricate phenomenon. Industry professionals have devoted vital attention to enforcing Occupational Safety and Health (OHS) from the last three decades to enhance safety management in construction. Despite the efforts of the safety professionals and government agencies, current safety management still relies on manual inspections which are infrequent, time-consuming and prone to error. Extensive research has been carried out to deal with high fatality rates confronting by the construction industry. Sensor systems, visualization-based technologies, and tracking techniques have been deployed by researchers in the last decade. Recently in the construction industry, computer vision has attracted significant attention worldwide. However, the literature revealed the narrow scope of the computer vision technology for safety management, hence, broad scope research for safety monitoring is desired to attain a complete automatic job site monitoring. With this regard, the development of a broader scope computer vision-based risk recognition system for correlation detection between the construction entities is inevitable. For this purpose, a detailed analysis has been conducted and related rules which depict the correlations (positive and negative) between the construction entities were extracted. Deep learning supported Mask R-CNN algorithm is applied to train the model. As proof of concept, a prototype is developed based on real scenarios. The proposed approach is expected to enhance the effectiveness of safety inspection and reduce the encountered burden on safety managers. It is anticipated that this approach may enable a reduction in injuries and fatalities by implementing the exact relevant safety rules and will contribute to enhance the overall safety management and monitoring performance.

  • PDF

A Study of Health and Safety Management Practices of Contractors in Southern Vietnam

  • Phung, Van Manh;Manu, Patrick;Mahamadu, Abdul Majeed
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.127-131
    • /
    • 2015
  • In spite of the socio-economic benefits of the construction industry, it accounts for many deaths, injuries and illnesses in many countries. In developing countries like Vietnam, the situation is even worse. Health and safety (H&S) management plays a crucial role in the efforts to improve H&S performance as it contributes to mitigating the risks of occupational injuries and illnesses. However, within the wider H&S literature in Vietnam, there is no insight into the current state of affairs of H&S management, particularly in terms of the management practices that need attention in order to improve H&S management across the construction sector. This study therefore presents the findings of an inquiry into the H&S management practices of contractors in Vietnam. The study employed a questionnaire survey which yielded 58 responses from contractors, particularly those operating in Southern Vietnam. Some commonly implemented H&S management practices by the contractors are: provision of personal protective equipment (94%), allocation of H&S supervisor on site (90%), and displaying of company H&S policy on construction sites, company website, and head/branch offices (86%). Some of the less implemented practices are: networking/engaging with other companies/institutions (e.g. government offices) about H&S issues (39%), rewarding workers for safe work behaviour (39%), reviewing and updating H&S plans (48%), and displaying regulatory H&S posters on site (45%). The findings have provided some insight into the current state of affairs of the H&S management practices of contractors in Southern Vietnam and could thus inform efforts by industry stakeholders to improve the aspects of H&S management that are lagging.

  • PDF

Trends in Development of Micro Rovers for Planetary Exploration (행성탐사용 (초)소형 로버 개발 동향)

  • Keon-Woo Koo;Hae-Dong Kim
    • Journal of Space Technology and Applications
    • /
    • v.3 no.3
    • /
    • pp.213-228
    • /
    • 2023
  • Unmanned exploration rovers serve as tools for investigating mineral resources, mining, and carrying out various scientific on celestial bodies beyond Earth, acting on behalf of humans. Recently, not only the United States but also other countries such as Japan, India and China have been attempting to develop unmanned planetary exploration rovers for space development or have successfully operated them on other celestial bodies. This has accelerated the enthusiasm for space exploration and development. However, the development and operation of unmanned rovers for planetary exploration still entail significant costs and high risks, making it difficult for universities or companies to undertake such project independently without the guidance of financial backing from government entities. In this paper, we describe the recent development trends of micro-rovers, known as Cube Rovers, which inherit the concepts and definitions of traditional Cube Sat. We also introduce the potential and expectations of Cube Rovers through the necessity of their development and ongoing planetary exploration cases.

Cloud Security and Privacy: SAAS, PAAS, and IAAS

  • Bokhari Nabil;Jose Javier Martinez Herraiz
    • International Journal of Computer Science & Network Security
    • /
    • v.24 no.3
    • /
    • pp.23-28
    • /
    • 2024
  • The multi-tenancy and high scalability of the cloud have inspired businesses and organizations across various sectors to adopt and deploy cloud computing. Cloud computing provides cost-effective, reliable, and convenient access to pooled resources, including storage, servers, and networking. Cloud service models, SaaS, PaaS, and IaaS, enable organizations, developers, and end users to access resources, develop and deploy applications, and provide access to pooled computing infrastructure. Despite the benefits, cloud service models are vulnerable to multiple security and privacy attacks and threats. The SaaS layer is on top of the PaaS, and the IaaS is the bottom layer of the model. The software is hosted by a platform offered as a service through an infrastructure provided by a cloud computing provider. The Hypertext Transfer Protocol (HTTP) delivers cloud-based apps through a web browser. The stateless nature of HTTP facilitates session hijacking and related attacks. The Open Web Applications Security Project identifies web apps' most critical security risks as SQL injections, cross-site scripting, sensitive data leakage, lack of functional access control, and broken authentication. The systematic literature review reveals that data security, application-level security, and authentication are the primary security threats in the SaaS model. The recommended solutions to enhance security in SaaS include Elliptic-curve cryptography and Identity-based encryption. Integration and security challenges in PaaS and IaaS can be effectively addressed using well-defined APIs, implementing Service Level Agreements (SLAs), and standard syntax for cloud provisioning.

Research Trends in Off-Site Construction Management : Review of Literature at the Operation Level (국외 오프사이트 건설 관리 연구 동향 : 작업 단계 수준에서의 문헌 연구)

  • Jang, JunYoung;Chen, Hao;Lee, Chansik;Kim, TaeWan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.114-125
    • /
    • 2019
  • Off-Site Construction (OSC) is a new construction method based on factory production. OSC (Off-Site Construction) is a new construction method based on factory production. Researches such as OSC-related design and production standardization, transport methods are actively conducted in the U.S., UK and other parts of the world as this new method has an edge over existing methods in terms of productivity, economy and quality. As the emergence of this new area requires reasonable management, an analysis of the scope of construction project management is required accordingly. Therefore, this research analyzed the study trends and relationships at the CM/PM range's "Operation level" to identify areas of study, relationship between studies and deficiencies in current research. This study carried out a comprehensive literature review of the OSC (CM/PM) research by analyzing 94 papers in Operation level as of September 3, 2018, and the analysis results are as follows. (1) Working stage level researches have been increasing rapidly since 2006. (2) Non-volumetric type is contributing most significantly at work stage level. In the building sector, it has been identified that problems such as residential: living, quality issues, non-residential: economic difficulties, factory: productivity problems have been addressed. (4) The Non-volumetric pre-assembly type dealt with the economic feasibility of residential and non-residential buildings, whereas the modular type was studied in regards to assembly quality. (5) From 2006, project management areas (e.g., quality, human resources, risks) have been expanded. It is expected that this research will help find new areas of research for OSC. If the analysis is carried out to the level of the industrial, corporate and project phases in the future, it is deemed that the overall research flow and area of the OSC industry can be identified.