• 제목/요약/키워드: Project method

검색결과 4,169건 처리시간 0.033초

식품산업 연구개발의 결정론적 평가방법에 관한 연구 (A Study on the Deterministic Evaluation Method of R&D Project in Food Industry)

  • 이종만;이근희
    • 산업경영시스템학회지
    • /
    • 제14권23호
    • /
    • pp.57-64
    • /
    • 1991
  • The preliminary, advanced and final evaluation of R&D project is essential in order to reduce loss of resource and opportunity and to minimize uncertainty resulting from optimal selection and efficient progress of R&D project. This thesis examined characteristics of deterministic evaluation, economical evaluation, and OR-approach evaluation as theoretical methodology of evaluation of R&D project applicable to food industry in Korea by using scoring method, one of deterministic evaluations. In addition, this thesis divided the evaluation factors for preliminary evaluation of R&D project into 5 groups and 30 factors on basis of the environment of domestic companies and set up the standard of each evaluation factors and contains marking-selecting way. But, generally, the evaluation model by this thesis, as the conditions of the business company environment are different to each other, contents to be set up evaluation factors, evaluation standard and decision method conforming to each the environment of the business companies with referring to as one standard of evaluation project for selecting R&D project.

  • PDF

프로젝트 네트워크에서 사업완성시간의 적률 추정 (Estimating the Moments of the Project Completion Time in Project Networks)

  • 조재균
    • 한국산업정보학회논문지
    • /
    • 제22권1호
    • /
    • pp.61-67
    • /
    • 2017
  • 프로젝트 네트워크 분석에서 사업완성시간의 분포를 추정하는 것은 매우 기본적이다. 본 논문에서는 활동시간이 상호 독립적이고 정규분포를 따른다는 가정 하에서 사업완성시간의 적률(평균, 분산, 왜도, 첨도)을 추정하기 위한 방법을 제안한다. 제안된 방법은 연속형의 활동시간 분포를 이산형 분포로 근사화하기 위한 이산화 기법과 난수발생을 이용한다. 제안된 방법은 대규모 네트워크에 대해서도 쉽게 적용 가능하며, 그리고 제안된 방법에 의한 결과는 몬테칼로 시뮬레이션에 의해 얻어진 결과와 비교할 때 매우 정확함을 보여준다.

NCS 교육과정 개편을 위한 프로젝트기반 학습법: 4년제 대학을 중심으로 (Project-based Learning Method to Reorganize the NCS Training Program: Focusing on the 4-Year-Course University)

  • 정대현;원종하
    • 수산해양교육연구
    • /
    • 제28권4호
    • /
    • pp.1057-1067
    • /
    • 2016
  • National Competency Standards are the major administrative project to build a competence-based society. The manpower for the global society should be recognized by performance rather than educational records. Therefore, all colleges should first nurture NCS-type manpower based on field needs. This study comparatively analyzed the differences between the lecture style of four-year colleges and the outcomes of problem-solving and project-based learning method to prove why it is necessary to introduce the NCS program. Especially, It will review the constraints and measures of NCS introduction to overcome in a four-year university. Through this, it can be used as a means to help improve the field conformity of a four-year college curriculum by presenting the development and utilization of curriculum-based NCS in a four-year university. As a result, it was found that the overall satisfaction with the problem-solving and project-based learning method was above average. Many students were dissatisfied with the traditional teaching methods and the new project-based learning method was relatively effective in college education. Students' participation also improved. Based on the evaluation of learning performance, the new method was found more satisfactory than the old teaching method in terms of comprehension of professional knowledge in various fields, nurturing of logical thinking skills, acquisition of analytical skills, comprehensive thinking skills, creative problem recognition, and open-minded thinking skills.

IDENTIFICATION OF SIGNIFICANT CRITERIA FOR SELECTION OF CONSTRUCTION PROJECT MANAGERS IN IRAN

  • Abbas Rashidi;Fateme Jazebi;Mohamad Hassan Sebt
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1564-1569
    • /
    • 2009
  • Project managers play a key role in cost, time, and quality of a project. Selection of an appropriate project manager, therefore, is considered as one of the most important decisions in any construction project. It should be noted that most important decision makings are carried out by the project manager throughout the project. Traditionally, project manager selection in construction companies in Iran is through organizing an interview with candidates and selecting the most appropriate choice in accordance with the capabilities, potentials and individual specifications coupled with the requirements of the project. In the same direction, organizing interview on selection of appropriate candidate is usually carried out by senior managers of companies. Determination of the most important criteria for selection of project managers and also identification of significance coefficient of each criterion can highly help senior managers of companies to make sound selection decisions. In this paper, a numerical model has been considered for determination of significance of each criterion, details of which are submitted for selection of project manager in Iranian petrochemical, oil and gas sector companies. For this reason, all criteria- considered by senior managers of the companies under study- are first determined. Then, information obtained through 38 interviews, conducted by senior managers of the mentioned companies while selecting project manager, is analyzed. Significant coefficient of each criterion is calculated through the accumulated data using fuzzy curves method.

  • PDF

공공 건설프로젝트 BIM 적용 효율적인 발주방안에 관한 연구 (Application of BIM in Public Construction Project : Focused on Delivery System)

  • 조성;조용;이경하;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.203-207
    • /
    • 2009
  • These days Construction Industry is one of the major industry in public project and it has many problems. And Construction Industry highly respond to a chage of IT, politics, economy, domestic and international situation. And it causes an uncertainty in Korea economy. The goal of this paper is showing the efficiency application of BIM in Public Project. And this paper follow three steps. First, these day's trend of BIM and delivery method are researched. Second, major factors are thrived to appreciating BIM Third, delivery method based on BIM is proposed. Major factors of delivery method are researched to make guide line of delivery method in public project in the future.

  • PDF

PRELIMINARY PROJECT OF WATER SUPPLY FOR NDATA FARM, MALAWA

  • Min-Shun Lee;Hung-Kwai Chen;Sheng Liang;Ho-Shong Hou
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1615-1617
    • /
    • 2009
  • The water resources project of 320 Ha second stage reclamation, in which including an University City, out of 800 Ha Ndata Farm, Malawa, had been under studied in this research. The challenge of C value of runoff coefficient was obtained as 0.8, by introducing the attenuation factors method, proposed by second author, an IDF dimensionless method customary used in Taiwan, proposed by the third author, is translated further to solve the project design rainfall; Rational Method, thus, obtains 11.5 CMS as the 5 year recurrence storage. The final job, completed by the third author's on-site performance, includs field alignments and discussions with the trustee, Malawa President H. E. Dr. Bingu Wa Mutharika, when a special concern of anti-theft. In order to provide sufficient supply up to an amount of 44,000 M3 during April to November, the sketch package includes 6 measurements: one water barrage, one sluice gate, one intake, one sediment reservoir, one water reservoir, and 3199 Km long gravity-driving hydraulic pipe.

  • PDF

Quantifying Monetary Value of Float

  • Park, Young-Jun;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.111-113
    • /
    • 2015
  • Floats are used by the parties involved in a construction project. The owner may use float by changing order(s) or by executing risk avoidance plan; the contractor may use it for leveling resources or substituting activities' construction methods to reduce costs. Floats are accepted either just as by-product obtained by critical path method(CPM) scheduling or as asset having significant value. Succinctly, existing studies involved in float value does not consider its' changes on project time domain. It is important to identify float ownership and to quantify its' corresponding values. This paper presents a method that quantifies float value of money that changes over project execution. The method which accurately computes the monetary value of float may contributes to resolve conflicts relative to float ownership and/or delay issues among project participants. It compares the difference between the monetary value of total float - on non-critical path in each and every schedule update. It makes use of critical path method (CPM) and commercial software with which practitioners are already familiar.

  • PDF

The Impact of Design-Bid-Build Procurement Methods on Project Performance in Libya

  • Ghadamsi, Alaeddin;Braimah, Nuhu
    • Journal of Construction Engineering and Project Management
    • /
    • 제6권2호
    • /
    • pp.16-23
    • /
    • 2016
  • The use of inappropriate procurement methods to deliver construction projects has long been acknowledged as a major source of poor project performance and is particularly problematic for the Libyan Construction Industry. Poor procurement method selection has been recognised as a major contributory factor to frequent time and cost overruns. This paper offers a way of selecting specific procurement methods to maximize successful project performance. The methodology involves an intensive review of relevant literature, followed by a semi-structured questionnaire survey. The key findings of the study reveal that 11 out of its 12 common selection criteria exhibit a significant contribution to one or more project performance criteria (time, cost and quality). Project clients should therefore prioritise these criteria when selecting a design-bid-build method. Knowledge of the criteria that contribute positively to project performance will also enable clients to work out, prior to and during construction, the best measures and provisions for successful project outcomes.

자기부상열차 도입의 교통경제학적 평가방법 연구 (Transportation Economic Analysis Method for a Maglav System)

  • 김현웅
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.1276-1280
    • /
    • 2005
  • The Maglav system project affects communities and are usually funded by public agencies. Evaluation of this project that considerably impact whole communities requires public involvement. This specific requirement of transportation projects determines the method of their evaluation as the impacts are estimated from the transportation economic point of view. Especially evaluation criteria must reflect the needs of the interested parties and should consider all foreseeable benefits and losses caused by the Maglav project. To select evaluation criteria and evaluation method may help a decision--maker in making a best selection for a Maglav project.

  • PDF

건설 현장 관리자 역량의 인과관계 구조 분석 (An Analysis of the Casual Relations on Construction Project Manager's level Competency)

  • 김도엽;김화랑;장현승
    • 대한건축학회논문집:구조계
    • /
    • 제34권3호
    • /
    • pp.77-86
    • /
    • 2018
  • Recently, Korean construction industry is moving from quantitative growth to qualitative growth. Among the changes in the construction industry, the competency of the project manager who represents the construction project as well as the construction company has been referred to as a factor that effects qualitative growth. This research utilized previous research analysis and expert interview in order to extract essential competency factors of a construction project manager. DEMATEL method was utilized to analyze the quantitative and objective causal relationship between the competency factors. The causal relationship of the competency factors were visualized through Digraph (directed graph) and competency areas of the project manager that requires strengthening were also suggested. Analysis result showed that the important competency categories of a project manager were Internal & External Communication, Project Management Body of Knowledge, and Inspirational Leadership. The analysis results of this research can be utilized in developing competency enhancement method for future project managers and as a basic data in developing an education program.