• Title/Summary/Keyword: Project financing

Search Result 152, Processing Time 0.02 seconds

A Basic Study for Finding Methods to solve the Crisis of Construction Industry caused by Deterioration of Liquidity (유동성 악화에 따른 건설산업 위기극복 방안 모색을 위한 기초연구)

  • Kim, Eun-Sung;Lee, Sang-Hyo;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.131-135
    • /
    • 2009
  • Domestic construction industry is facing big difficulties by a worldwide financial crisis. Especially the deterioration of liquidity by the reject of banks for project financing and unsold housing project made a big problem on financing for the ongoing and new projects. To solve this, it is critical for construction companies. banking facilities and public organizations to cooperate and support each other. In this study, the methods which each part can do are investigated. Construction companies can do a price reduction, finance condition improvement for deposit and down payment, asset sale and cost reduction. And Public organizations can buy the assets of construction companies with proper price and ease the regulation to activate transactions of real estate. In the case of Banking facilities, they can support arrangement and liquidation of insolvent projects and so on.

  • PDF

Financing Mechanisms of Social Prescribing Projects: A Systematic Review

  • Dronina, Yuliya;Ndombi, Grace Ossak;Kim, Ji Eon;Nam, Eun Woo
    • Health Policy and Management
    • /
    • v.30 no.4
    • /
    • pp.513-521
    • /
    • 2020
  • Aging populations and the increasing mental health issues among them have set a new challenge for the international community, governments, and people. Given this, society's role is very important, and involving the local community in resolving the problems can play a pivotal role. The current study presented the systematic review of the financing mechanism and cost-effectiveness of the "social prescribing" (SP) project in the United Kingdom and how SP can be adapted for other settings. The data showed comparatively low running costs and the overall effectiveness of SP projects. The running cost of SP projects varied between £54,525 and £1.1 million. The cost-effectiveness of the projects reported as 12% and the return of investment was about 50% depending on the type of analysis and the activities implemented. This type of intervention can be one of the options that support solving the issues of aging populations and their accompanying mental disorders.

A Comparative Study on a Supplier Credit and a Buyer Credit in International Transactions of Capital Goods - Focusing on Industrial Plant Exports, Shipbuilding Exports, and Overseas Constructions -

  • Kim, Sang-Man
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.48
    • /
    • pp.127-155
    • /
    • 2010
  • The international transactions of capital goods such as industrial plant exports, overseas constructions, and shipbuilding exports, are so huge that tremendous amount of funds are required, and that most of the loans are long-term credits of over five years. In the export of huge capital goods, financing is more crucial than technology itself. Some of the importing countries are developing ones that are politically and economically unstable. Therefore the financing mechanism for these transactions is conclusive in winning these projects. Global financial market instability caused by US sub-prime mortgage financial crisis expanded all over the world, and the international transactions have been decreased due to global credit crisis. This indicates how much influential the financing market is in international transactions. The financing schemes are classified into supplier credit and buyer credit by who provides the financing. A supplier credit is a credit extended by an exporter(seller) to an importer(buyer) as part of an export contract. Cover for this transaction may be extended by an export credit agency('ECA') to the exporter. In a sales contract a seller shall provide fund required to manufacture goods, and in a construction contract a contractor shall provide fund required to complete a construction. A buyer credit is an arrangement in which an exporter enters into a contract with an importer, which is financed by means of a loan agreement A Comparative Study on a Supplier Credit and a Buyer Credit in International Transactions of Capital Goods 155 where the borrower is the importer. In a sales contract a buyer shall provide fund required to manufacture and procure the goods, and in a construction contract an owner shall provide fund required to complete a construction. Therefore an exporter is paid on progressive payment method. A supplier credit and a buyer credit have their own advantages and disadvantages in the respect of the parties respectively. These two financing methods are selectively used considering financing conditions such as funding cost, importer's and/or exporter's financial conditions, importing country's political risk.

  • PDF

A Study on Tax Increment Financing Based on the Analysis of PILOT Financing in the United States -Focusing on Hudson Yards Development in NYC- (미국 PILOT 재원조달방식의 분석을 통한 세입담보금융의 연구 -뉴욕시 허드슨 야드 개발의 적용사례를 중심으로-)

  • Lee, Woo-Hyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.9
    • /
    • pp.4524-4531
    • /
    • 2013
  • Recently, there are increased importance on introducing Tax Incremental Financing as a means of project financing for urban regeneration. Values of implementing this financing method based on future revenue has to be considered not just as self-financing methods but as possibilities building virtuous circular structure in urban developments. In respond to domestic problems in developments led by private sector, it reinforces public sector's roles by providing finance from the beginning of development. This provides concomitant structural & institutional supports for increasing not only social values for the public but also revenues for private developers. Therefore, this study starts with theoretical background study on TIF as well-known example, then analyzes PILOT used on Hudson Yard Development in NYC as an unique example sharing identical structural & conceptual characteristics. With these process, the study deducts suggestive implications on Tax Incremental Financing possibly reflected on domestic situation.

The Current State and Application of project Financing followed by Sale after Building System of the Apartment (공동주택 후분양 전환에 따른 프로젝트 금융의 현황 및 활용방안)

  • Lee Sung-Rock;Moon Hwi-Young;Lee Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.218-225
    • /
    • 2004
  • The supply for the apartment complex in Korea has been accomplished by the sale before building system as a way of institutional means to support massive housing supply in the past. Although this sale before building system has helped the provision of the housing, the necessity of that has been weakened in the current housing market. As this market is changed to emphasize on consumer, the necessity of conversion to sale after building system was raised and finally enforced partially. However, the sale after building system has difficulty in ensuring construction fund and the safety of housing business. So, the diversification in the style of business structure we and the strategy for the activation of construction fund will solve these problems. Consequently, this essay examine the change and influence in the construction fund after adopting sale after building system and suggest the appropriate strategy in project financing for providing fund and reducing the risk in construction business.

Business Growth Strategy with Asset Backed Short Term Bond for Overseas IPP Opportunities (자산담보부 단기사채를 활용한 해외발전사업 수주확대방안)

  • Kim, Joon-Ho;Moon, Yoon-Jae;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.11 no.1
    • /
    • pp.30-38
    • /
    • 2015
  • This study is about whether the new Project Finance scheme called "Asset Backed Short Term Bond(ABSTB)" with Project Finance Guarantee Cover provided by Korean Exim Bank(KEXIM) is an appropriate and valid financing structure, through close examinations on domestic and overseas IPP case studies. This study clearly indicates that (i) the interest rate of ABSTB with KEXIM's Project Finance Guarantee is relatively more competitive than the interest rate of other ABSTB guaranteed by EPC Companies (ii) the lower credit rated EPC companies make higher ROE(Return on Equity) through this financing structure. Lastly, Korean EPC Companies can secure profitability through this innovative financing scheme which will also lead to winning more power plant Contracts and become globally competitive.

  • PDF

Predicting Project Performance by Analyzing Key Success Factors on Project Fiancing(PF) Development (건설 프로젝트 파이낸스(PF) 사업의 성공영향요인(KSF) 분석을 통한 사업성과 예측 모델)

  • Lee, Dong-Gun;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.127-137
    • /
    • 2014
  • Project Financing (PF) development project is the type which influences national economy and building industry largely because it is exerted by using borrowed money from many kinds of investors and huge amount of financial raising. Many domestic PF projects are focused mainly on the profit maximization lacking in a sufficient feasibility study. Nowadays many projects are suspending due to the global finance debacle and stagnation of real estate industry. Therefore, in this paper, risk factors of PF project are deducted and Key Success Factors (KSFs) are derived through Factor-Analysis and qualified using Fuzzy-AHP method. And through the evaluation of the derived success factors in real projects, a strong correlationship has been identified between the score of each PF success factor and the level of success and/or expected rate of return (ROR). So, the result of this paper can help decision makers of the PF projects make a better decision and give a meaningful guidance in achieving successful PF projects.

The Study on the Project Delivery System for Vitalizing the Green Remodeling (그린리모델링 사업 활성화를 위한 발주방식 제안)

  • Nam, Sunghoon;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.3-11
    • /
    • 2017
  • Aging buildings over 15 years reaches about 74% of 177 thousand buildings in Domestic public buildings. Due to the aging building, the energy loss is a serious problem. In order to reduce the energy usage through improving the energy efficiency on the existing buildings, the government & the local autonomous entity conduct the energy efficiency projects through the remodeling, repairing & equipment replacement on the existing buildings. The green remodeling is applied to the existing public buildings in recently revised the act on the creation and support of green building. However, the standard is not obvious that the work scope of green remodeling, financing and project delivery method. This paper propose is to suggest project delivery system for vitalizing the green remodeling. Green remodeling is defined on basis of the occurring work under project life cycle based on the existing building process and the financing method for owners and companies and the project delivery system according to work scope of green remodeling are proposed in this paper

A Study on the Risk Management of Projects to which the Real Estate Project Finance (부동산 PF사업의 리스크 관리에 관한 연구)

  • Kim, Sung-Chul;Lee, Jeong-Cheol;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.491-496
    • /
    • 2008
  • In spite of economic slump, the Real Estate PF(project financing) market competes for receiving large project orders. While the project is successful, the Real Estate PF still guarantees a high benefit ratio. But the initial stage of the project involves many risks. There are many financial, constructional, legal, and other risks. After searching for possible risks, we must consider a management plan. This study executed a question investigating risk factors and management plans. Those who have studied for 3 or more years have concluded that the question objects are developer, construction company, and financial institution staff. The main management plans take actions for proper benefit rate security and loan repayment. This study has also been verified through the actual case. The study results will help solve the Real Estate PF project's risks.

  • PDF

A MULTI-OBJECTIVE OPTIMIZATION FOR CAPITAL STRUCTURE IN PRIVATELY-FINANCED INFRASTRUCTURE PROJECTS

  • S.M. Yun;S.H. Han;H. Kim
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.509-519
    • /
    • 2007
  • Private financing is playing an increasing role in public infrastructure construction projects worldwide. However, private investors/operators are exposed to the financial risk of low profitability due to the inaccurate estimation of facility demand, operation income, maintenance costs, etc. From the operator's perspective, a sound and thorough financial feasibility study is required to establish the appropriate capital structure of a project. Operators tend to reduce the equity amount to minimize the level of risk exposure, while creditors persist to raise it, in an attempt to secure a sufficient level of financial involvement from the operators. Therefore, it is important for creditors and operators to reach an agreement for a balanced capital structure that synthetically considers both profitability and repayment capacity. This paper presents an optimal capital structure model for successful private infrastructure investment. This model finds the optimized point where the profitability is balanced with the repayment capacity, with the use of the concept of utility function and multi-objective GA (Generic Algorithm)-based optimization. A case study is presented to show the validity of the model and its verification. The research conclusions provide a proper capital structure for privately-financed infrastructure projects through a proposed multi-objective model.

  • PDF