• 제목/요약/키워드: Project benefits

검색결과 536건 처리시간 0.026초

하수관거 정비사업의 타당성 분석에 관한 연구 (A Study on Feasibility Analysis of Sewer Rehabilitation)

  • 한인섭;장대환;우병하;임철환
    • 상하수도학회지
    • /
    • 제23권1호
    • /
    • pp.89-96
    • /
    • 2009
  • Feasibility which is complimented before Social Overhead Capital Project and National Policy Project is analyzed by economic and political benefits. The projects will be performed if the benefits are bigger than the project cost. In this study, feasibility was examined at various viewpoints on sewer rehabilitation projects implemented with private capitals. To achieve the feasibility analysis, the B/C (Benefit/Cost Ratio), IRR (Internal Rate of Return) and the returns ratio of the Build Transfer Lease project implemented in 2007 at W city were estimated. At the same time, the correlation with B/C and benefit sensitivity of concessionary rate fluctuation were analyzed to evaluate the efficiency and feasibility of the seven sewer rehabilitation projects promoted by a local autonomous entity.

A COST-BENEFIT ANALYSIS OF INTEGRATING ERP SYSTEMS WITH PROJECT MANAGEMENT SYSTEMS IN CONSTRUCTION

  • BooYoung Chung;Miroslaw J. Skibniewski
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.575-586
    • /
    • 2005
  • This paper presents an approach to quantifying the costs and benefits of integrating ERP systems with project management systems, including potential time and cost savings. To properly identify the costs and the benefits, the paper shows the relevant construction information flows and the desired milestones in the integration process. The proposed benefit analysis model should allow construction firms considering the integration of their ERP systems with legacy systems or commercial project management software make informed decisions in regard to the existing alternatives in the early stages of decision making.

  • PDF

Assessing Awareness, Understanding, Construction Practices and Innovation towards Green Construction

  • Zaini, Afzan Ahmad;Endut, Intan Rohani
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.518-522
    • /
    • 2015
  • Green Construction is the construction activities that conserved energy, land, water and material to reduce the negative effect to the environment while assuring essential demand on quality and safety during project construction. This paper critically examine the contribution of awareness and understanding, green construction practices and green construction innovation with the green construction benefits. A measurement model based on the theoretical framework and exploratory factor analysis was developed and tested using structural equation modelling technique. This study employs a survey research methodology involving a total of 346 respondents among construction contractors, developers, clients and consultants in the construction industry. The findings indicate that the awareness and understanding, green construction practices and green construction innovation are significant predictors of the green construction benefits. From the practical perspective, the findings should alert the construction participants on the need of awareness and understanding, green construction practices and green construction innovation towards the green construction benefits. In addition, the findings can be used as diagnostic tool for continuous improvements in the Malaysian construction industry.

  • PDF

통영바다목장화사업의 경제적 타당성평가 (Assessing the Economic Feasibility of a Marine Ranching Project in Tongyoung)

  • 표희동
    • Ocean and Polar Research
    • /
    • 제31권4호
    • /
    • pp.305-318
    • /
    • 2009
  • A marine ranching project in Tongyoung was established in 1998, lasting 9 years to 2006. Project activities included the deployment of artificial reefs, the release of young fishes like jacopever and rockfish, and input/output control for specific marine ranching areas in Tongyoung. This report focuses on the economic feasibility of the project in hindsight. Analysis concentrates on three aspects; (a) direct economic benefits, such as increasing effects of fisheries income and savings in harvesting costs, (b) indirect benefits, including increasing effects of recreational fishing and saving R&D costs, and (c) costs, including releasing and purchasing costs of artificial reef and juvenile fish, R&D costs, maintenance costs and harvesting costs. Results show that NPV=4.7 billion won, IRR=8.55% and B/C ratio=1.286 under Scenario 1, which considers the saving effects of R&D costs, and NPV=0.9 billion won, IRR=6.03% and B/C ratio=1.11 under Scenario 2, which does not consider the saving effects of R&D costs, based on 5.5% of the social rate of discount. According to sensitivity analysis, the economic feasibility is very sensitive to the recapture rate.

주민서비스 [입체체험관] 프로젝트 - '중랑 한(HAN : Here And Now)마음 만들기' 마케팅을 위한 -

  • 김영희
    • 한국디지털정책학회:학술대회논문집
    • /
    • 한국디지털정책학회 2007년도 춘계학술대회
    • /
    • pp.117-126
    • /
    • 2007
  • The current participative government has started to carry out Residents Service Reform that transforms the transmission system of suppliers' oriented convenience to one-stop tai for made civil and governmental integral ion service for the purpose of realizing universal Social Benefits in responding to increasing desires of people according to the changes of social and economic conditions by overcoming the existing limit of transmission system. This study has analyzed the status and problems of local autonomous organizations according to the innovation of support for the life of residents and in order to solve these problems, I present the implementation strategy of transmission system of civil and government cooperation tailor-made integral ion service through the project of "30 experiencing hall for Social Benefits, " which is a joint project of civil and government dove loped by Jungrang-gu. In addition, it aims for the completed accomplishments of this project to settle as eight largest services market ing brand in 30 method and also as the best strategic brand for the "establishment of network of civil and governmental cooperation" with suppliers of public services, suppliers of civil service, and residents, who are suppliers as well as potential customers, for solving problems of local communities.

  • PDF

Valuation of Benefits from the Adoption of Project Information Management System

  • Kyong Ju Kim;Kyoungmin Kim;Ki Yong Kang;Geon Hee Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1548-1552
    • /
    • 2009
  • In the construction industry, IT has been an alternative for the enhancement of productivity and technical advances through a paradigm shift. While it has been recognized that the IT system will have a substantial influence on the industry, a quantitative valuation has been very limited. This paper has chosen EVMS (Earned Value Management System), which supports the integrated management of cost and schedule by utilizing IT tools, and which is the largest trend in the construction IT industry in Korea, in order to suggest an analysis model for the valuation of IT. The CVM (Contingent Valuation Method) is used to quantitatively measure intangible value of IT application. Then, a valuation and analysis model were suggested for the quantitative valuation of the effect of IT adoption. In terms of willingness to pay for EVMS, the expected benefits from the adoption of EVMS were US$ 584.52 per man annually. This research should be helpful for construction companies evaluating their investment to Project Management Information System.

  • PDF

정보시스템 프로잭트의 선택원리 (A Model for Project Selection of Information System)

  • 지원철
    • 한국경영과학회지
    • /
    • 제10권1호
    • /
    • pp.79-83
    • /
    • 1985
  • This purpose of this study is to suggest a tentative model for project selection of information system. In constructing a mathematical model, quantification of decision criteria is tried to lessen difficulties of measuring benefits of information system project. Suggested model enables us to select projects in the context of portfolio and information system policy.

  • PDF

ECONOMIC BENEFITS OF SUPPLEMENTING LAMBS WITH UREA MOLASSES BLOCKS ON RANGES OF PAKISTAN

  • Rafiq, M.;Jadoon, J.K.;Mahmood, K.;Naqvi, M.A.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • 제9권2호
    • /
    • pp.127-132
    • /
    • 1996
  • Effects on feed intake, liveweight gain and economic benefits of supplementing lambs with urea molasses blocks, were studied. Forty eight crossbred lambs were divided into 6 groups and assigned randomly to grazing on native pasture (CONT) or along with supplements of Commercial ration (COM) and urea molasses blocks (UMBs) containing two levels of cement and calcium oxide as a binding agent. Analysis of variance revealed highly significant (p<0.01) differences in dry matter (DMI, g/day), crude protein (CPI, g/day) and metabolizable energy (MEI, MJ/day) intakes. Differences in liveweight gain (LWG, g/day), feed conversion ratio (FCR) and net economic benefit of supplementation were also highly variable. The intake of DM, CP and ME varied from 974 to 1002, 66-70 and 7.6-8.4 in lambs supplemented with UMBs, significantly (p<0.01) greater than 848, 52.5 and 5.6 in lambs supplemented with COM or FCR and net economic benefits (54.3; 57.8; 17.1 and 1.96; 2.4) in lambs supplemented with COM and UMB-2, were CONT or supplemented with UMB-1, UMB-3 and UMB-4 respectively. Factors responsible for differences in feed intake, liveweight gain and economic benefits, are discussed.

경지정리사업의 확장편익-비용분석 - 충남서산시 지곡지구를 중심으로 - (An Extended Benefit-Cost Analysis of Land Consolidation and On-farm Development Project -With Respect to Jigok Land Consolidation and On-farm Development Project in Seosan, Chungnam Province, Korea-)

  • 임재환;이민수
    • 농업과학연구
    • /
    • 제29권1호
    • /
    • pp.66-83
    • /
    • 2002
  • The economic feasibility analysis including benefit-cost ratio and internal rate of return of a land consolidation and on-farm development project was mainly depended upon the direct benefits and costs arising during project life. Therefore the projects were neglected in allocating the government's financial funds and loans on account of the low economic rate of return of the project. Accordingly the extended benefit-cost analysis method should be introduced and adapted to cover not only the benefit s such as non-market values of environmental and food security fun ct ions of the project but also market values of the project outputs. The main purposes of this study are (1) to prepare a guide line for economic feasibility analysis based on the IBRD and ADB guidelines, (2) to estimate the benefits from productivity increase, labor saving, savings of O&M cost of farm mechanization and project facilities, savings of farmer's burden for their public health, increasing environmental and public functional value of paddy fields, improving food security condition and formation of peaceful and uncontroversial rural society by implementing the land consolidation and on-farm development, (3) to introduce the newly adapted analytical method as the extended benefit cost analysis which could make possible to be included the values of non-market goods such as the food security and the environmental public function of paddy fields. To carry out this study, the existing publications on the guidelines for economic agricultural projects were reviewed and consultation was made with a For the post evaluation study of the land consolidation and on-farm development project, field survey in Jigok and other comparative area were made to get available information. According to the project completion report, Jigok land consolidation and on-farm development project has 55ha of benefit area out of 69ha of gross area. The project was started in November 11th, 2000 and completed october 30th, 2001. The total project costs were amounted to 2,548 million won and the annual project benefits were estimated at 335million won evaluated by domestic market prices. The ERR(Economic Rate of Return) and SRR(Social Rate of Return) of the project based on the shadow pricing system were estimated at 4.4% and 16% respectively. On the other hand, the ERR and SRR based on the domestic market value system were amounted to 6.37% and 14.62%. In conclusion, Korean land consolidation and on-farm development projects have not carried out from the view point of economic rate of return under shadow pricing system but from the view point of domestic pricing system. For the future feasibility studies on land consolidation projects have to be carried out including the non-market values as environmental and food security function of the projects.

  • PDF

우리 나라 바다목장화 사업의 예비적 경제성 평가 (Preliminary Evaluation of a Proposed Marine Ranching Project in Korea)

  • 표희동
    • 수산경영론집
    • /
    • 제29권2호
    • /
    • pp.199-216
    • /
    • 1998
  • An economic appraisal of a proposed marine ranching project is analysed using capital budgeting model such as net present value(NPV) and internal rate of return( IRR) as well as sensitivity analysis and goal seeking model. Of the factors for economic appraisal, direct benefits are to be determined by estimated harvest, prices and costs incurred by catching fishes, and indirect benefits include the additional economic effect of recreational fishing. And judging the worth of these project options depends upon the choice of discount rate of which 8.5% is recommended here. On the basis of estimated production, prices and costs the project is expected to yield NPV=615 million won and IRR=8.8%, which is quite accepted for an economic feasibility, under the first scenario, and NPV= -127 million won and IRR=7.93%, which is rejected, under the second scenario. Sensitivity analysis has been performed by calculating the switching value and sensitivity indicator in respect of the main project parameters. The results suggest that the project NPV and IRR are especially sensitive to fishes(rock fish and other rock fish) prices and fixed costs. Finally goal seeking analysis is carried out in order to reach a desired level of performance like NPV=0 in respect of the amount of hatchery-reared juverniles, the prices and the discount rate.

  • PDF