IDENTIFICATION OF SOME FAILURE COSTS AND THEIR PERCEIVED ROOT CAUSES IN CONSTRUCTION

  • Saad Al-Jibouri;Martijn Oude Vrielink
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.184-189
    • /
    • 2009
  • In 2008 the total estimated failure costs in the Netherlands was estimated to be 11.4% of the industry's turnover compared to 7.7% seven years earlier. Failure costs can be the consequence of rework as a result of failure to conform to the product requirements and specifications or due to inefficient processes and bad management practices. Many construction companies however are unaware of the exact nature of these costs, their root causes or how to control them. This paper describes work carried out in the Netherlands to identify the different types of failure costs in construction and their root causes. The research described builds on previous findings by another research institution and expands it to include information collected from project cases and a survey of a number of project managers in the construction industry. The paper describes the analysis of the results from cases and the survey to identify the root causes of failure costs. Research shows, for example, that many failure costs are related to the client taking late decisions and making changes to the project requirements.

  • PDF

MEASURING AND COMPARING PROFIT PATTERNS OF TRADITIONAL CONSTRUCTION COMPANIES EXTENDING TO HIGH-TECH CONSTRUCTION

  • Jieh-Haur Chen;Chung-Fah Huang;S. C. Hsu
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.360-365
    • /
    • 2005
  • The need of constructing high-tech facilities is one of the important issues concerning the competitiveness by the high-tech companies. It, simultaneously, offers a magnificent opportunity for construction participants. Nevertheless, the high-tech construction is experience-based, resulting in little related construction knowledge that has been statistically analyzed and documented. This study measures and confers with the profit patterns causing the disparity between the traditional and high-tech construction. The database was the result of collecting detailed information of 65 construction projects from eight construction companies, including detailed records of over 20 main construction operations in each project. All of these were performed during the recent 10 years and encompassed in the project types of the high-tech construction, residential building, and commercial building. Rendering suggestions regarding profit management and expecting to economize cost of learning from inexperience while extending to the high-tech construction were both presented.

  • PDF

머신러닝 회귀분석 유형에 따른 총 공사기간 예측 모델에 관한 연구 (A Study on the Prediction Model of Total Construction Period according to the Type of Machine Learning Regression )

  • 강윤호;윤석헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.361-362
    • /
    • 2023
  • In construction work, there is often a difference between the estimated construction period and the actual construction period. Accordingly, the project may be delayed from the scheduled date, leading to huge losses due to problems such as increased costs during construction. In this way, it is important to calculate the appropriate construction period at the project planning stage in construction work. To solve this problem, we would like to study a model that will increase the accuracy of the scheduled construction period at the project planning stage. This study compared and analyzed linear regression, Lasso regression, Ridge regression among the types of regression analysis to select an appropriate construction period prediction model to secure an appropriate construction period at the project planning stage to reduce problems during construction.

  • PDF

Creating an e-Benchmarking Model for Authentic Learning: Reflections on the Challenges of an International Virtual Project

  • LEPPISAARI, Irja;HERRINGTON, Jan;IM, Yeonwook;VAINIO, Leena
    • Educational Technology International
    • /
    • 제12권1호
    • /
    • pp.21-46
    • /
    • 2011
  • International virtual teamwork offers new opportunities for the professional development of teachers. In this paper, we examine the initial experiences in an ongoing international virtual benchmarking project coordinated by the Finnish Online University of Applied Sciences. What challenges does an international context present for project construction and collaboration? Data from five countries, in the form of participant reflections and researchers' observations, were analysed according to four types of barriers: language, time, technical and mental barriers. Initial data indicates that trust is an essential starting point, as there is neither time nor possibilities to build mutual trust by traditional means. Organisational confidentiality issues, however, can complicate the situation. The project introduces 'collision' as a method of professional development, in which physical and organisational borders are crossed and the skills and competencies needed in global learning environments are acquired.

INCIDENT FREQUENCY AND SEVERITY FOR CONSTRUCTION FACILITIES

  • Jong-Hyun Park;Jae-Su Jeong;Chan-Sik Lee
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.234-240
    • /
    • 2011
  • Preventing incidents occurred in construction process is important for safe implementation of construction projects. Due to the complexity and magnitude of the project and moreover, poor safe planning and management, construction incidents in Korea have been increasing. Reducing construction incidents effectively, appropriate safety management program in consideration of the incident rate of each facility is to be adapted. This study analyzes incident frequency and severity rate of each facility based on the data of construction sites(about 1,560 thousand cases) recorded by Korea Occupational Safety & Health Agency for 3 years from 2007 to 2009, and the incident related data (about 40 thousand cases) of Korea Workers' Compensation & Welfare Service. The results of this study revealed that construction incident rates of 'cold refrigeration storage facilities' are the highest among building types, followed by traditional building religious building, arcade department store and shopping center. In case of other facilities, the incident rate and the rate of intensity of 'pipelining project' are the highest, followed by 'tunneling project'. These results would be used in providing safety programs beneficial for preventing construction incidents.

  • PDF

도시생태계 구조를 고려한 비오톱 유형 구분 (Biotope-Type Classification Considering Urban Ecosystem Structure)

  • 김정호;한봉호
    • 한국조경학회지
    • /
    • 제34권2호
    • /
    • pp.1-17
    • /
    • 2006
  • The purpose of this study was to analyze biotope types of urban land-use patterns. Forest areas were considered according to vegetation type and potential for succession. Urban ecosystem structure was analyzed according to land use, land coverage, vegetation structure (actual vegetation, diameter at breast height, layer structure, and revetment). As a results of the classification, the biotopes were divided into 71 types according to the urban ecosystem structure. In the case of the Hanam province, the biotopes were divided into 51 types: 26 forest types; 5 swampy and grass land types; 3 farm land types; 3 types of planted land, and 8 types of urbanization.

AHP를 이용한 소프트웨어 개발비 보정계수 산정 (Estimating Cost Adjustment Factors of Software Development Projects using Analytic Hierarchy Process)

  • 김우제;박찬규;신수정
    • 산업공학
    • /
    • 제17권spc호
    • /
    • pp.1-10
    • /
    • 2004
  • The purpose of this paper is to reorganize cost adjustment factors of software development projects in estimating software development cost, and derive adjustment coefficients of application types and language types by analytical hierarchy process. We constructed a decision-making hierarchy of various criteria which determine the complexity of application types and language types, and conducted a survey on the pairwise comparison among alternatives. Finally, the cost adjustment coefficients of application types and language types were derived by analytic hierarchy process. This paper is the first study in which the analytic hierarchy process was applied to the field of estimating cost adjustment factors of software development projects.

연구개발과제의 직후평가항목에 대한 인식도 조사: 기업부설 연구소를 대상으로 (Perceived fitness of the ex-post evaluation items of R&D projects: In the case of private R&D centers)

  • 이무신;손병호;엄기용;신원준;전현곤
    • 기술혁신연구
    • /
    • 제3권1호
    • /
    • pp.55-83
    • /
    • 1995
  • This paper addresses three central decision-making problems frequently encountered in developing evaluation checklists for ex-post evaluation of R&D projects at private R&D centers: 1) what kind of evaluation elements and factors should be included in the evaluation forms\ulcorner 2) how much weight should be assigned to each evaluation factor and element\ulcorner and 3) could the same evaluation elements and factors with weights be applied all the project type(research, development, and engineering)\ulcorner To answer these questions, we identified the evaluation elements/factors based on the review of relevant literature and measured the perceptions of researchers, R&D managers, and top managements of the three private R&D centers to get the information about the importance levels of the elements and the weights of the factors for each of the three project types. The findings include that 1) all the evaluation elements derived from the literature exhibited high importance levels, and 2) the importance levels of the elements and the weights of the factors were quite varied along the project types. Theoretical and practical implications of the findings for ex-post evaluation of R&D projects are discussed.

  • PDF

Ontology for estimating excavation duration for smart construction of hard rock tunnel projects under resource constraint

  • Yang, Shuhan;Ren, Zhihao;Kim, Jung In
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.222-229
    • /
    • 2022
  • Although stochastic programming and feedback control approaches could efficiently mitigate the overdue risks caused by inherent uncertainties in ground conditions, the lack of formal representations of planners' rationales for resource allocation still prevents planners from applying these approaches due to the inability to consider comprehensive resource allocation policies for hard rock tunnel projects. To overcome the limitations, the authors developed an ontology that represents the project duration estimation rationales, considering the impacts of ground conditions, excavation methods, project states, resources (i.e., given equipment fleet), and resource allocation policies (RAPs). This ontology consists of 5 main classes with 22 subclasses. It enables planners to explicitly and comprehensively represent the necessary information to rapidly and consistently estimate the excavation durations during construction. 10 rule sets (i.e., policies) are considered and categorized into two types: non-progress-related and progress-related policies. In order to provide simplified information about the remaining durations of phases for progress-related policies, the ontology also represents encoding principles. The estimation of excavation schedules is carried out based on a hypothetical example considering two types of policies. The estimation results reveal the feasibility, potential for flexibility, and comprehensiveness of the developed ontology. Further research to improve the duration estimation methodology is warranted.

  • PDF

건설 프로젝트 효율적 성과관리를 위한 핵심 지표 체계 구축 (Developing Measurement System for Key Performance Indicators on Building Construction Projects)

  • 차희성;김태경
    • 한국건설관리학회논문집
    • /
    • 제9권4호
    • /
    • pp.120-130
    • /
    • 2008
  • 건설산업의 핵심성과는 프로젝트가 추구하는 목표, 즉, 비용, 시간, 품질, 안전, 환경 등의 기준을 어느 정도 달성했는지로 평가할수 있다. 그러나, 프로젝트 기반산업이라고 할 수 있는 건설산업의 경우, 성과에 대한 명확한 정의체계가 부재하고, 성과측정에 대한 표준화된 절차와 관리 방식이 구축되어 있지 않아서 프로젝트의 성과를 객관적이고 합리적으로 평가하기가 매우 어려운 것이 현실이다. 본 연구에서는 프로젝트 차원의 성과에 대한 정의 및 기준을 설정하고, 각 성과기준 댈 지표 산출 방식을 개발한 후, 이들 지표를 통해 정량적으로 프로젝트의 성과를 산출할 수 있는 방법론을 제안하고자 한다. 제안된 성과측정 방법론에 입각하여, 실제 사례 프로젝트를 수집하고, 이들을 비교 분석해 봄으로써, 향후 건설 프로젝트에 적용가능 한지에 대한 평가를 실시하였다. 이를 통해 특정한 건설 프로젝트는 상호 비교가능한 지표의 형태로 변환될 수 있으며, 개별프로젝트의 성과를 종합적으로 분석하는 것이 가능해진다. 또한, 건설 프로젝트 관련자로 하여금 성과에 입각한 관리를 가능하도록 유도하여 건설 프로젝트의 효율성을 진작시키는데 큰 역할을 담당할 수 있을 것으로 기대한다.