Case-Based Reasoning Support for ERP Pre-Planning

  • Kwon, Suhn-Beom;Shin, Kyung-shik
    • 지능정보연구
    • /
    • 제9권2호
    • /
    • pp.171-184
    • /
    • 2003
  • A project planning is one of the most important processes that determines success and failure of the project. A pre-project planning is also essential job for information system implementations at the early stage of project planning, especially for management information system like ERP. However, pre-project planning is very difficult, because lots of factors and their relationships should be considered. Pre-project planning of ERP implementation has been done by project manager's own knowledge and experiences. In this article, we propose a system that help project manager to make a pre-project plan of ERP project with case-based reasoning(CBR) framework. The proposed CBR system saves previous cases of ERP pre-project planning in the case base. Then, the system finds the most similar case with the current pre-project planning problem. Project manager can make a pre-project plan by adjusting the most similar case. From the interview with project managers, we collect some field cases of ERP implementation. We organized these cases by using XML(Extensible Markup Language), which is good for representing hierarchical information. XML gives us some flexibilities to correct and maintain cases. We make a prototype system, PPSS(Project Planning Support System) that help project manager to make a pre-project plan of ERP implementations. The object of the system is to support project manager to make a pre-project plan of ERP. We hope the result of the study can be applied to other information systems. Our research would be extended to cover other stages of project planning.

  • PDF

Case-Based Reasoning Support for ERP Pre-Planning

  • Kwon, Suhn-Beom;Shin, Kyung-shik
    • 한국산학기술학회:학술대회논문집
    • /
    • 한국산학기술학회 2003년도 Proceeding
    • /
    • pp.171-177
    • /
    • 2003
  • A project planning is one of the most important processes that determines success and failure of the project. A pre-project planning is also essential job for information system implementations at the early stage of project planning, especially for management information system like ERP. However, pre-project planning is very difficult, because lots of factors and their relationships should be considered. Pre-project planning of ERP implementation has been done by project manager's own knowledge and experiences. In this article, we propose a system that help project manager to make a pre-project plan of ERP project with case-based reasoning(CBR) framework. The proposed CBR system saves previous cases of ERP pre-project planning in the case base. Then, the system finds the best similar case with the current pre-project planning problem. Project manager can make a pre-project plan by adjusting the most similar case. From the interview with project managers, we collect some field cases of ERP implementation. We organized these cases by using XML(Extensible Markup Language), which is good for representing hierarchical information. XML gives us some flexibilities to correct and maintain cases. We make a prototype system, PPSS(Project Planning Support System) that help project manager to make a pre-project plan of ERP implementations. The object of the system is to support project manager to make a pre-project plan of ERP. We hope the result of the study can be applied to other information systems. Our research should be extended to cover other stages of project planning.

  • PDF

업무분할체계를 이용한 사업관리정보시스템 (Project Management Information System Using Work Breakdown Structure)

  • 이정구
    • 한국산업정보학회:학술대회논문집
    • /
    • 한국산업정보학회 1997년도 추계학술대회 발표논문집:21세기를 향한 정보통신 기술의 전망
    • /
    • pp.303-320
    • /
    • 1997
  • In A institute, project managers present quarterly project performance report according to institute's law. In quarterly project performance report, progress of project performance and budget expended should be written. Progress of project performance and progress of budget expended are key management factors in A institute. Because financial database system Is already constructed, progress of budget expended is got from information system. But the progress of project performance that project manager estimate subjectively can not be judged of its correctness because there is not project management information system that is able to calculate the progress of project performance systematically. In this study, we present the project management system assign all activities to every project participator according to their work share rate using WBS(Work Breakdown Structure) and calculate the progress of project performance systematically Also we construct project management information system for above project management system implementing.

  • PDF

중공업 일괄수주공사를 위한 프로젝트 관리 시스템 개발 사례 (Development of a Project Management System for the Turnkey-based Plant Project)

  • 고창성;노재정;현재명;김명관
    • 산업공학
    • /
    • 제11권3호
    • /
    • pp.167-180
    • /
    • 1998
  • This study is concerned with the development of a project management system for the turnkey-based plant project, which will help the site manager to plan, control, and report the project progress. This system has been developed as one of the modules of the integrated information system for the H Heavy Industry Co. and is composed of five subsystems; project information system, drawing-material management system, process management system, project progress report system. A/S management system. it also integrates commercial project management package in order to schedule the project activities and report the project progress to the owner. The main purpose of the system is to provide project information, including drawing, material, and progress, to the site manger in the real time and to accumulate site know-how for the turnkey-based plant project.

  • PDF

PMO의 관여도가 프로젝트성과에 미치는 영향에 관한 연구 (A Study on the Effect of PMO Involvement on Project Performance)

  • 원종호;박소현;이태원;김승철
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제32권2호
    • /
    • pp.109-135
    • /
    • 2023
  • Purpose This study is based on previous studies related to the function and operating system of the project management system for efficient project management. The purpose of the study is, first, to find out how the project performance is affected by the utilization of the project management system and the involvement of the PMO. Second, the mediating effect of implementing integrated management between the project management system and project performance is to be demonstrated. Design/methodology/approach Based on previous studies related to project management, this study designed a research model by integrating functional factors derived from project management system design studies, integrated management factors, and factors derived from PMO function studies. Findings As a result of the empirical analysis, this study first confirmed that high utilization of the project management system and high involvement of the PMO are factors that affect project performance. In addition, it was confirmed that the establishment of the system and the introduction of PMO do not guarantee project performance. Second, it was confirmed that the execution of integrated management has a mediating effect between the system and the project performance, and that the high utilization of the system has a positive effect on the mediating effect.

A Progress-based Expert System for Quantitative Assessments of Project Delay

  • Yoo, Wi Sung
    • Architectural research
    • /
    • 제10권1호
    • /
    • pp.41-48
    • /
    • 2008
  • Construction projects have frequently exceeded their schedule despite reliable estimates at the start of a project. This problem was attributed to unpredictable causes at the beginning and to shortage of proper tools to accurately predict project completion date. To supplement this difficulty, project managers need a comprehensive system that can be employed to monitor the progress of an ongoing project and to evaluate potential delay for achieving the goal on time. This paper proposed a progressive-based expert system for quantitative assessments of project delay at the early stages of the execution. Furthermore, the system is used to inspect the change of the uncertainty on completion date and its magnitude. The proposed expert system is helpful for furnishing project managers a warning signal as a project is going behind schedule and for tracking the changed uncertainty at a desired confidence level. The main objectives of this paper are to offer a new system to overcome the difficulties of conventional forecasting tools and to apply a construction project into the system to illustrate its effectiveness. This paper focuses on construction phase of project development and is intended for the use by project managers.

THE RESEARCH ON CONCEPTUAL MODEL OF LNG PLANT PROJECT PLANNING EXPERT SYSTEM

  • Moon-Sun Park;Young-Ai Kim;Seung-Wook Lee;Sung-Ryul Bae;Hyun-Wook Kang;Byoung-Jun Min;Yong-Su Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1570-1575
    • /
    • 2009
  • The purpose of this research is to propose the conceptual model of Scenario-based Project Planning Expert System which has not been used in domestic LNG plant industry. This research examines data on the plant project planning expert system of domestic and oversea, analyzes the components of project planning expert systems and benchmark excellent cases. The conceptual model of LNG plant project planning expert system is established through the procedure as has been noted above. The results of this research are as follows: First, this research draws out such components of LNG plant project planning expert system as feasibility, cost control, contract management and risk management. Second, this research proposes the conceptual model of LNG plant project planning expert system which core module is consist of feasibility evaluation, life cycle cost evaluation and decision making. Finally, each module of LNG plant project planning expert system would be integrated into the Scenario-based Project Planning Expert System.

  • PDF

소프트웨어 개발을 위한 통합 프로젝트 관리의 개념적 모형에 관한 연구 (A Study on the Integrated Conceptual Model of Software Development Project Management System)

  • 문용은;이재범
    • Asia pacific journal of information systems
    • /
    • 제6권1호
    • /
    • pp.241-267
    • /
    • 1996
  • The problems like exceeding estimated cost, late due-date, expensive maintenance, insuffiency of experts and low productivity are becoming emphasized related with the software development. In order to overcome these problems and to develop the highly qualified software within the limited resources, a project management tool is used. The purpose of this study is to develop a conceptual model of the project management system which can plan, analyze and control the software development projects effectively. The model is constructed with plan and track management system, cost management system and operation management system for the efficient project management. It is named by LSD-PMS : Large-scale Software Development Project Management System. We reviewed 5 cases of project management. LSD-PMS is evaluated and reviewed by the project managers in the field. It is proved that LSD-PMS is a tool which can help project managers develop software successfully given budget and time schedule. In the future, this system should be further developed as an integrated model with system implementation tools such as CASE products.

  • PDF

Evaluation System for Defense IT Project in Korea: Post-Implementation Stage

  • Lee, Sangho;Song, Chong-Hyun
    • Journal of Multimedia Information System
    • /
    • 제5권4호
    • /
    • pp.291-297
    • /
    • 2018
  • Performance measurement is not an easy task. However, it is necessary to measure the expected value of the informatization project to be invested, to help the successful progress of the informatization project, and to confirm the result of the informatization project. This study describes the evaluation systems of the defense informatization project in Korea used after the end of the informatization project (post-implementation evaluation stage). In the post-implementation evaluation stage of proposed system, the informatization project is evaluated in terms of performance achievement, project plan compliance, project management, and economic validity. For each element, this study suggests metrics and practical measurement method. With metrics and their method, it can be evaluated which project is better than others. Moreover, the lessons learned can be developed. Under scarce budget condition, defense organizations can make better performance from IT project with the evaluation system suggested in this study.