A Study on the Process Improvement of Budgeted Cost of Earned Value Management in Multiple Apartment Project (공정-공사비 통합 프로세스 개선을 통한 대단지 아파트 건설공사의 계획기성 산출 및 관리)

  • Yang Yong-Cheol;Kim Sang-Hee;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.123-136
    • /
    • 2003
  • In multiple apartment construction project, BCWS is a critical management factor and has a great influence on the success of the project. Due to the many apartment buildings & facilities which produce numerous activities, there are several problems in making out a time schedule of work as well as production and management of precise BCWS from the allocation of resources. In this study, actual condition survey was executed in terms of the calculation and the management of BCWS. This study propose better solutions for efficient calculation of BCWS through the analysis of the problems and standard schedule & progress curves.

A Study of the Identify about Scheduling Process at Owner's Position (IDEF 방법론을 이용한 발주자 공정관리 프로세스 규명에 관한 연구)

  • Lee Tai Sik;Kim Young Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.454-457
    • /
    • 2001
  • All of the partner must manage continually scheduling for the successful project in construction. Besides, that is not a important only contracter's managing but also owner's managing which is a very important about project finishing in time. Especially, in the case of mega project, the owner has to manage progress of scheduling to control contractor. And the case of progress to delay or to change, owner, contractor, and inspector must make a plan of recovery scheduling. This study proposes a construction process model from IDEF Methodology.

  • PDF

Development of Project Management System for Geothermal Well Construction (지열발전 시추공 구축 프로젝트관리시스템 개발)

  • Kim, Kwang-Yeom;Lee, Seung-Soo
    • New & Renewable Energy
    • /
    • v.8 no.3
    • /
    • pp.38-46
    • /
    • 2012
  • Enhanced Geothermal System (EGS) among geothermal system types enables to produce sustainable energy even in non-volcanic region while conventional geothermal energy has been restricted to obtain only from hot and permeable formation such as in volcanic regions. Successful EGS project in terms of economy, however, can be expected only when the project is managed effectively considering most of influencing factors (e.g., tangible and intangible resources, cost, time, risks, etc.). In particular, well construction is of the utmost importance in geothermal project as it dominantly influences on time and cost in the whole project. Therefore, when it comes to viable geothermal project without abundant experience, managing drilling economically and efficiently is inevitable. In this study, a project management system for well construction in geothermal project based on project control system including work breakdown structure and cost account was developed to predict and assess the performance of drilling and to visualize the progress.

Process Progress Pattern Analysis based on Daily Work Report Analysis (작업일보 데이터 분석 기반 공정 진척 패턴 분석)

  • Ko, Yong-Ho;Shin, Young-Keun;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.156-157
    • /
    • 2016
  • Construction projects have shown a dramatic increase in size and complexity during the recent years that precise management has been recognized as one of key factors leading the project to success. It has been investigated that management in construction sites is generally done based on the experience of site engineers. Such experience based decision making lacks reliability that could bring disastrous results such as delay and cost overruns. The purpose of this study is to suggest a process progress pattern analysis method that is expected to be used as an objective reference for site managers to aid the decision making done regarding process progress management.

  • PDF

Automatic indoor progress monitoring using BIM and computer vision

  • Deng, Yichuan;Hong, Hao;Luo, Han;Deng, Hui
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.252-259
    • /
    • 2017
  • Nowadays, the existing manual method for recording actual progress of the construction site has some drawbacks, such as great reliance on the experience of professional engineers, work-intensive, time consuming and error prone. A method integrating computer vision and BIM(Building Information Modeling) is presented for indoor automatic progress monitoring. The developed method can accurately calculate the engineering quantity of target component in the time-lapse images. Firstly, sample images of on-site target are collected for training the classifier. After the construction images are identified by edge detection and classifier, a voting algorithm based on mathematical geometry and vector operation will divide the target contour. Then, according to the camera calibration principle, the image pixel coordinates are conversed into the real world Coordinate and the real coordinates would be corrected with the help of the geometric information in BIM model. Finally, the actual engineering quantity is calculated.

  • PDF

Cooperation Case between Railway Specialized Authorities and Local Government in LRT Project (경전철사업에서의 철도전문기관과 지자체 간의 협력사례)

  • Song, Jae-Il
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2217-2224
    • /
    • 2011
  • The railway industry has well developed with Korea's economic growth as follows - Industrial railway's electrification in 1973, Seoul subway opening in 1974, Busan subway opening in 1985, High speed railway opening in 2004. But LRT as city transportation means has been faced with many difficulties. Looking at the LRT projects implemented until now, there are some issues like the transportation demand, the quality & safety of RS and facilities, the poor management of inhabitant complaints and the failure to maintain policy coherence. They have caused not only the project schedule to extend but also the project costs to increase, even to obstruct the project progress itself in some cases. These risk factors become the obstacle of LRT project's success, but it is said that more basic problem is the lack of risk management capability of competent authorities in railway business. Under these circumstance, Railway specialized Authorities and Local government have cooperated to identify various risk factors and to prepare the measures in advance, so we try to introduce this cooperation case, which will help other local government as an useful reference.

  • PDF

Technical Parameter Selection Method of the System Development - Focusing on the Military R&D Project - (시스템개발에서의 기술적성과측정 파라미터 선정 방법 - 국방 R&D 사업 중심으로 -)

  • You, Yi-Ju;Kim, Jin-Hoon;Park, Young-Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.5 no.1
    • /
    • pp.49-56
    • /
    • 2009
  • This research attempts to acquire technical performance measure information based on identifying the Critical To Quality(CTQ) parameters of user requirement by using Quality Function Deployment(QFD) methodology in the initial phase of a defense R&D project. This results will contribute to the integration of technical progress to the Work Breakdown Structure(WBS) based project performance tracking. It also improve the bridging of systems engineering activities to the project management and the project decision making process.

  • PDF

The Status and Plan of Galileo Project (GALILEO PROJECT 추진현황 및 대응방안 연구(2))

  • Kong, Hyun-Dong
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2009.06a
    • /
    • pp.368-371
    • /
    • 2009
  • The GALILEO Project is to be the one and only European Global Navigation Satellite System(GNSS). The GIVE-B satellite, a second experimental GALILEO satellite was launched and started the transmission of ranging signals. GIOVE-B satellite is intended as a trueprototype of future GALILEO satellite. So I introduce the standard deviation of code multi path, signal power, antennas performance and L1-E5 group delay etc. Therefore I comprehend the current progress and tend of GALILEO Project and try to propose the national countremeasures.

  • PDF

Development of Synchro-EVM System Integrating TOC-CPM and EVM (TOC-CCPM과 EVM을 통합한 Synchro-EVM 시스템 개발 연구)

  • Lee, Do-Hern;Jang, Gil-Sang
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.4
    • /
    • pp.291-299
    • /
    • 2017
  • Recently, many business and government organizations have benefitted by executing projects using TOC-CCPM(Theory of Constraints-Critical Chain Project Management). In parallel, Earned Value Management(EVM) metrics have also become popular. Many organizations like US government requires that all large projects measure and report project progress status using EVM. Thus, project management in business fields such as plant construction, IT development, ship building need to integrate TOC-CCPM and EVM in oder to keep and reduce the delivery date of projects for improvement of customer satisfaction and enlargement of business opportunity. This paper proposes the scheme and case of developing the Synchro-EVM system which TOC-CCPM and EVM are connected.