• Title/Summary/Keyword: Project Progress

Search Result 693, Processing Time 0.028 seconds

Structural Equation Model for Information Technologization Success Index(ITSI) of Small and Medium Enterprise (구조방정식 모델을 이용한 중소기업의 IT화 성공지수(ITSI) 개발 연구)

  • Kim, Jung-Geon;Moon, Tae-Hee;Sohn, So-Young
    • IE interfaces
    • /
    • v.17 no.3
    • /
    • pp.338-348
    • /
    • 2004
  • OECD countries including Korea positively adopt performance-based budget systems which convert an input-centered system to an output-centered system to solve two baffling problems: public expense retrenchment and efficiency recovery of government management. Output management of IT project propelled in public sector becomes a prominent figure influenced by these keynote of policy. However, it is placed in difficult circumstances to develop a performance index and the methodology to cover characteristics of IT project, measuring the goal achievement of business and the customer contentment according to the phases of business progress. Existing studies of IT project accomplishment measurement have been fulfilled on the subject of business targeting on IT technology application, administrative information network business and national base of information network construction. Most of the studies have been executed using BSC or AHP to reflect synthetically business specifics of IT project from a methodological point of view. In this study, we propose a structural equation model (SEM) to develop a performance index which measures the outcome of IT project according to the phases of business progress, avoiding a simple presentation of project outcome or conceptual frame. The proposed SEM is applied to the survey results of "IT support project for Small and medium business". Based on the fitted model, we apply ACSI concept to develop an Information Technologization Success Index (ITSI). This index allows us comparison of several IT vendors as well as feedback information for further improvement.

VRML based Realtime RFID+4D Progress Management System Development (VRML기반 실시간 RFID+4D 진도관리 시스템 개발)

  • Park, Jae-Hyun;Yoon, Su-Won;Choi, Cheol-Ho;Chin, Sang-Yoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05b
    • /
    • pp.99-102
    • /
    • 2010
  • Today's construction is higher and more complex. So types and amounts of needed materials for construction project are increasing and those are occurred problems in construction site such as insufficient working space, confusion of materials handling order and working circulation. Because of those problems, research of progress management system using RFID+4D has been studied, but it is impossible to manage progress and material statement in real-time. So this study analyzed problems of current research and suggested VRML based RFID+4D Progress Management System. This Study focused on system basic concept and interface is designed for system development. This research is still progressing, so it has to do more development and research. However, it could be expected construction management efficiency and automation of management tasks.

  • PDF

A Case Study on Turkey Eurasia Tunnel Project (터키 유라시아 터널 프로젝트에 대한 사례연구)

  • Kim, Do-Hyung;Bang, Gyu-Min;Jun, Gy-Chan;Kim, Dong-Hyun;Kim, Taek-Kon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.58-69
    • /
    • 2010
  • Turkey Eurasia Tunnel Project is large scale road construction project of which the total length is 14.6km. The subsea shield TBM tunnel will be constructed under Bosphorus strait and the project site is in poor condition as composite ground, high water pressure and earthquake. The design procedure of subsea tunnel was introduced with tender design materials. That procedure contains tunnel type, TBM type and the principal design items considering geological condition such as high water pressure, composite ground and seismic area. This paper states the progress for geotechnical investigation, seismic analysis and TBM tunnel design. Analysis for geotechnical investigation is in progress, aseismatic design is going on stability study for liquefaction and structure. In addition, the performance of shield TBM to be considered such as advance rate and improvement of TBM was reviewed. The plan of fire safety was also reviewed with respect to fire protection.

  • PDF

Work Condition Analysis Process for Improving Reliability of Work Plan (작업계획의 신뢰도 향상을 위한 작업여건분석 체계)

  • Song, Ji-Won;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.36-44
    • /
    • 2009
  • The sum of each work duration are entire period in construction project. Each work occurs to be late, the total period of construction project will delays. Therefore, the total period of construction project will not be delayed if probability of work progress makes higher. Finding each work constraints performs constraints analysis in process of construction for checking probability of work progress. Grasp work constraints through the constraints analysis and removes. This research will show preventing delay of construction project, through work condition analysis process.

Cause of Schedule delay-based Constraints Analysis Process (작업지연원인 기반 작업여건분석 체계)

  • Song, Ji-Won;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.637-642
    • /
    • 2007
  • The sum of each work duration are entire period in construction project. Each work occurs to be late, the total period of construction project will delays. Therefore, the total period of construction project will not be delayed if probability of working progress makes higher. Finding each work's constraints performs constraints analysis in process of construction for checking probability of working progress. Grasp work's constraints through the constraints analysis and removes. This research will show preventing delay of consruction project, through constraints analysis process.

  • PDF

Introduction of The First Demonstration Project for the Application of HTS Cable and SFCL to Real Smart Grid in South Korea (22.9kV 고온 초전도 케이블.초전도 한류기 스마트 그리드 적용을 위한 초전도 시범사업)

  • Yang, B.;Park, J.;Lee, S.
    • Progress in Superconductivity and Cryogenics
    • /
    • v.12 no.3
    • /
    • pp.34-38
    • /
    • 2010
  • Until now some countries including South Korea have made big progress and many efforts in the development of high temperature superconductor (HTS) power equipments. Especially, HTS Cable and superconducting fault current limiter (SFCL) are the strongest candidates among them from the viewpoint of applying to real grid. In South Korea, HTS cable and SFCL have been installed in test fields and tested successfully at Gochang PT Center of KEPCO. In order to meet practical requirements and be feasible in real grid, a demonstration project for HTS cable and SFCL systems, called GENI(green superconducting electric power network at Icheon substation) project, has been initiated to install 23kV HTS cable and SFCL systems in a utility network in South Korea since 2008. Namely, it says the first demonstration project for the application HTS system to real smart grid in South Korea. This paper presents the design and the application plan of the 22.9kV HTS cable and SFCL in 154kV Icheon substation in South Korea with the viewpoint of applying in Smat Grid.

A Decision Making Support Model of Work Item-based Adaptation Strategy for RFID-based Construction Logistics and Progress Management (RFID 기반의 건설 물류 및 진도관리 통합체계를 위한 공종별 적용전략 의사결정모델)

  • Koo, Do-Hyung;Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.3-15
    • /
    • 2009
  • As building construction projects have been more higher and bigger in scale, the needs for cost reduction, productivity improvement, and reducing of work terms have rapidly increased in recent years. There has been, accordingly, a great emphasis on the necessity of logistics and progress management by well-organized system developed based on the appliance of different management theories. Although highly developed IT technology has contributed to the efficiency and effectiveness in information research and project management, RFID has been merely applied to a single progress or a few types of materials in current management studies, not to the overall process of the projects. This research proposes a consistent and systemized approach for decision making in adopting RFID technology in a construction project to support construction logistics and progress management. With a decision making model that consists of process model and template developed in this research, risks in cost, time, and error in building RFID-based construction logistics and progress management could be minimized.

Data Acquisition Technology (DAT) Selection Algorithm for Automated Progress Measurement and Management (진도관리 자동화를 위한 자료수집기술(DAT) 선정 방법)

  • Kang, Seung-Hee;Jung, Young-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.77-86
    • /
    • 2012
  • Progress measurement provides project participants with valuable information in terms of 'current status', 'corrective countermeasure', and 'forecast of future risks'. However, the managerial effort (or workload) required to acquire and maintain detailed progress data has been the major barrier to practical implementation. Even though recent efforts in utilizing data acquisition technologies (DATs) have actively attempted to automate the progress measurement process, previous DAT research has only been focused on limited construction tasks or selected technologies. This paper proposes a DAT selection algorithm that automatically assign an appropriate DAT for every commodity item for an entire constriction project. Five different criteria were identified and developed in order to comprehend specific requirements for automating the progress measurement of each commodity group. A case-study and also a survey from practitioners were conducted in order to validate the proposed methodology.

An Evaluation Method for Scientists and Engineers in Project - oriented R&D Organizations (Project를 위주로 하는 연구개발(硏究開發) 기관에 있어서 과학자(科學者), 기술자(技術者)의 평가방법(評價方法))

  • Park, Sun-Dal
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.1 no.1
    • /
    • pp.57-65
    • /
    • 1975
  • A perfect evaluation for scientists and engineers is impossible unless the R&D process is fully explored. But the study in this area is being intencified, and consequently progress is being made. In this paper an evaluation method for scientists and engineers in project-oriented R&D organizations is developed. That is, a method that the evaluation for the job performance directly influences personnel management such as promotion, and the evaluation for their potential, characteristics influences indirectly. Further systematization of evaluation process, which is no less importatant than evaluation itself, is attempted.

  • PDF