• Title/Summary/Keyword: Project Plan

Search Result 2,103, Processing Time 0.028 seconds

Analysis of Cost Estimate Method Based on Engineering 3D Model for Nuclear Power Plant Construction Project (엔지니어링 3D모델 기반 원전 건설사업비 산정방안 분석)

  • Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.294-295
    • /
    • 2018
  • Nowadays, the construction industry utilizes 3D models in the designing process, on which research is being conducted to establish an automated system for project cost estimation in connection with information related to construction such as material unit costs and wages, beyond the level of design interference review and construction quantity estimation. In this process, the project cost is estimated in connection with unit price data after takeoff the quantity based on the 3D model attributes and data types. A way to reduce cost and risk would be first developing prototypes of some of essential buildings and works, comparing and validating the outcomes, and then extending to the whole scope, because estimates differ on the basis of the scope and level of 3D design models as well as the data accuracy. This study analyzes case studies of project cost estimation by computing the quantity on the basis of 3D model in the construction industry and explores methodologies and management measures applicable for estimating nuclear power plant construction project costs.

  • PDF

Theme Trail District Planning for the Regional Activation -Case study on project of Trail construction each of the government agencies- (지역 활성화를 위한 테마길 조성 방안 -부처별 길 만들기 사업을 중심으로-)

  • Kim, Sang-Bum;Choi, Ja-Un;Jeong, Dae-Young;Kim, Eun-Ja
    • Journal of Agricultural Extension & Community Development
    • /
    • v.17 no.3
    • /
    • pp.587-606
    • /
    • 2010
  • Theme trail construction should be changed from existing form which connects line to line, or point to line. It should be developed into area form. The project of Trail construction must be converted in area form. The aggregate of the points which is a base element of walk is a line, and the harmonious connection of various line is the area. The close relationship with points and lines is important to operate the project of trail construction in area form effectively. Subject of the project of Theme trail construction of area form must become the village residents which are being contiguous in trail. They must operate management and about trail. The project of Trail construction of area form the plan making is established and if the subjects which, will operate and manage that place are decided upon according to theme must construct the trail of the wide area concept which connects the trail of that trail and neighborhood. If becomes like that local resident and the citizen will be able to coexist with mediation of Trail. If the project of Trail construction of village resident leading is propelled applying rural amenity resources in a way, the trail model which one phases advances could be presented for ecological, economical and cultural.

An Integrated Expert Model for Delay Management in Construction Projects

  • jalal, Majid Parchami;Yousefi, Elham
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.3
    • /
    • pp.1-14
    • /
    • 2017
  • Delay claim should actually be supported by a set of proper information so that the contractors could prove their validity. The so-called information should be able to clarify the relationship between delay events and how they impact on the whole project. Therefore, exploiting an integrated system by people who are involved in construction business would certainly prove helpful. In the present study, delay analysis methods have been investigated along with selecting a relatively comprehensive method which has been modified, and eventually, a novel model and its required modules have been proposed for evaluating delay claims. The suggested integrated model is formed to identify delayed events, to classify delays, to measure the impacts of delays on the project scheduling, and finally to estimate the damages which were caused by those so-called delays. A decision support system (DSS) model which is related to the integrated system is actually extracted from Iran's general contract conditions, that is, 4311 magazine (equivalent to red FIDIC book). It is then programmed and coded by C# program. This DSS model can be used as an input of Easy Plan program. In addition, at the end of this research, the coded DSS has been used along with the so-called program so that a modified and developed model could be generated.

A Study on the Planning for Rural Village Development Projects in Korea - Focused on Gamgok Chungbuk - (농촌마을 종합개발사업의 계획방향에 관한 연구 - 충북 감곡을 중심으로 -)

  • Kim, Seong-Keun
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.7 no.3
    • /
    • pp.19-26
    • /
    • 2005
  • In this study treats 'Rural Village Development Project'. The ministry of Agriculture and Forestry and Korea Agricultural & Rural Infrastructure Corporation are enforcing this from 2004. A purpose of 'Rural Village Development Project' is as follows. Repairs a function of production farms-residing rest tourism generally after connecting a neighborhood village having the same nature in a small scale unit. Too local human resources and material resources is utilized, and develops various types with specialization. As a result, it is to improve with the quality of life of a farmer. This study finds problems to have broken out in Rural Village Development Project. Therefore, recognize whether it is on to be devoted to rural village and rural community inhabitants to solve the problem how. And analyze a policy characteristic of Rural Village Development Project and basic course. Therefore, provide with materials when decides on plan course of Rural Village Development Project through this. As a result, it is a purpose to give help to Rural Village Development Project. The results of study are follows; First, A state inhabitants, professional group, administration understand an agricultural village, and to be able to learn must be prepared first. Second, the enough time that can carry out study is necessary. Third, must present the guidebook which expresses a local characteristic well. Fourth, it is specialist database construction and network formation.

  • PDF

The Economic Comparision through LCC Analysis on each Graded Alternatives for Green Remodeling of Public Building (공공건축물의 그린리모델링 수준별 LCC (Life Cycle Cost) 분석을 통한 경제성 비교)

  • Kim, Jaemoon;Lee, Junghyuk;Lee, Duhwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.38-49
    • /
    • 2018
  • Since the ratification of the Paris Agreement (COP21), the government is continuously strengthening policies for the reduction of greenhouse gas of the construction industry in accordance with the growing importance of reducing greenhouse gas and obligation of the government. Especially, the government emphasizes the need to improve the energy performance of old public buildings. Since 2014, the government is running a pilot project in which the government supports the construction cost of the green remodeling project of old public buildings and it is intended to develop the best practice of green remodeling and activate the green remodeling in the private sector. In this study, we analyzed the economical efficiency of the old public buildings by each level through green remodeling and conducted building related investigation and equipment measurement to plan the alternatives of the corresponding buildings. The improvement plan is a green remodeling plan that integrates alternatives. Five improvement plans were developed for each level to analyze the economic feasibility of each plan. As for the analysis method, the first energy demand amount calculation and the LCC analysis were performed through ECO2. In the LCC aspect, the improved 3/4 plan (middle level plan) was the most excellent and results were obtained in the order of the highest cost plan followed by the lowest cost plan. As a result, it is expected that it can be utilized as a basic data for future green remodeling performance plan and economic feasibility analysis in the future.

Diagnosis of Scoping and Type of Review on the Marine Environmental Impact Assessment for Ocean Energy Development Project (해양에너지개발사업 환경영향평가 검토유형 및 중점평가사항 진단)

  • Lee, Dae In;Kim, Gui Young;Tac, Dae Ho;Yi, Yong Min;Choi, Jin Hyu;Kim, Hye Jin;Lee, Ji Hye;Yoon, Sung Soon
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.18 no.3
    • /
    • pp.179-188
    • /
    • 2015
  • This study reviewed the type of the project and developmental plan related to ocean energy development in the coastal land boundaries and the ocean, and suggested the efficient scoping method through the diagnosis of the key items of environmental impact assessment (EIA) in the coastal area. The major projects are the construction of tidal power plant, tidal current power plant, and offshore wind power plant in the public water, and also those are the construction of solar power plants in the coastal land boundaries. While the project plans on a large scale such as the construction of tidal power plant, it is important to consider both property of usefulness of the designated areas and harmony analysis with marine space availability based on the adequacy of the site selection and relevance of plan with the master plan for reclamation and strategic environmental assessment (SEA). And also it needs to be considered the careful checkup on the EIA checklist referring to the type of project, effective post-monitoring, and suggestion of mitigating methods to minimize the environmental impacts during the stage of actual environmental impact assessment. Introduction of a system of integrated marine environmental impact assessment should be considered for reasonable and effective manage to developmental projects on the marine spatial area.

Establishment of governance through development of LH cooperation project with local government: Focusing on Jeju Area (지방자치단체·LH 협력사업 도출을 통한 거버넌스 구축방안 : 제주특별자치도를 대상으로)

  • Lee, Mi-hong;Seong, Jang-Hwan;Song, Youngil
    • Land and Housing Review
    • /
    • v.8 no.4
    • /
    • pp.285-294
    • /
    • 2017
  • Recently, as the paradigm of regional development has been transformed into characterization, decentralization and cooperation, small and medium scale development is in the spotlight. In particular, as the transfer of planning authority to local governments accelerates, LH is in the process of seeking to transform itself into a system that is in line with local government demand. The purpose of this study is to elaborate the regional pending projects that meet the demand of the region. The Jeju Special Self-Governing Province is the area where land and housing prices have increased more than three times recently, which is the area of interest in recent years due to the various demand for development projects. Another objective is to establish a local government based on LH's system, it is aimed to derive a collaboration method with local government, province corporation and local researchers. The criteria for deriving the cooperation projects between the local government and LH are basically the ones that can be carried out by LH and future-oriented projects. The process of deriving has undergone the process of statutory planning, unscrupulous plan analysis, and consultation of experts' advisory committees. In order to derive the regional cooperation project, four criteria such as local uniqueness, future possibility, business promotion efficiency, and local cooperation project were set. Major projects of the Jeju Special Self-Governing Province are improvement of the surrounding traffic system, construction of the hinterland due to the construction of the second airport, and establishment of Cruise Port(Jeju Port, Seogwipo Port). The role of each entity in the implementation of regional cooperation projects is as follows. Local government should request subsidies for the projects in case of lack of budget support and secure them through competition with other regions. In addition, it should be responsible for the operation and management of the facility once it has been supported and completed smoothly. The Ministry of Land, Infrastructure and Transport affects each region through approval and subsidy of the development plan. After the development project is completed, it evaluates the development project through monitoring and plays a role of continuously improving the system. As a business operator, the provincial corporation will carry out small-scale projects including non-physical projects such as community participation. In the case of LH regional headquarters, the general manager of the region will establish a comprehensive business plan, secure development availability, and carry out large-scale growth promotion projects.

A Comparative Diagnosing Plan for Old Industrial Complex Competitiveness and Regeneration Districts based on Competitiveness Index (경쟁력 지표를 통한 노후산업단지 진단과 공모사업으로 선정된 재생사업지구 비교분석에 관한 연구)

  • Chang, Cheol-Soon;Kim, Joo-hoon
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.20 no.2
    • /
    • pp.245-258
    • /
    • 2017
  • Ministry of Land, Infrastructure and Transport established a comprehensive plan for 83 old industrial complexes over 20-year. They implemented the competitiveness of industrial complex in September 2013, and revitalizing and remodelling comprehensive plan in December 2014. With significant influences of old industrial complex in September 2009, Ministry of Land, Infrastructure and Transport chose the 4 districts for the first pilot project. In December 2014, the second pilot project districts were established. In addition, there were 10 districts in April 2016 and 5 districts in April 2016 as the third pilot project and 5 distiricts in March 2017 as the fourth piolt project. Ministry of Land, Infrastructure and Transport currently suggests 23 districts to regenerate among 83 old industrial complex districts over 20 years. Even though the government suggests the certain 23 districts, this research selects the bottom 23 districts (30%) represented through the Focus Group Interview and compare them with the list government-suggested. As a result, there were some unlisted industrial complex districts. This research suggests the unlisted industrial complex districts which need to be regenerated and their problems, therefore this could be used as a guide for feasibility of old industrial complex regeneration implement.

Development of Project-Based Teaching-Learning Instruction for Living Environment Education in Home Economics Education (가정교과에서의 생활환경교육을 위한 프로젝트 중심 교수·학습 과정안 개발)

  • Kim, Nam-Eun;Heo, Young-Sun
    • Journal of Korean Home Economics Education Association
    • /
    • v.33 no.1
    • /
    • pp.37-62
    • /
    • 2021
  • The purpose of this study is to develop a project-based teaching-learning instruction to solve the problems in family life. The developed process can be a practical plan to activate environmental education centered on living environment problems curriculum of Home Economic Education[HEE]. In order to achieve the purpose of this study, the curriculum of HEE and environmental education categories were compared and analyzed. The study selected 10 themes and developed a project-based HEE teaching-learning instruction with 8 sessions. The characteristics of the developed teaching-learning instruction are as follows. First, HEE curriculum included environmental knowledge, values and attitudes, competence, and practice and participation in environmental education and related categories in achievement standards and learning elements. Second, since HEE curriculum has a teaching-learning instruction plan based on project-based learning that allows learners to recognize and solve problems themselves was developed based on the real life-centered learning themes related to environmental education. It was also proposed that the subject of HEE has a high correlation with environmental competence and environmental practice, and thus environmental contents that can raise students' interests in society and environment should be added to the HEE curriculum. The teaching-learning instruction developed in this study can be used for classes such as HEE classes or free semeste. A follow up study would need to test the educational effects of this teaching and learning plan by implementing it to the actual class.

Factors Affecting the Work Motivation of the Construction Project Manager

  • PHAN, Phuong Thanh;PHAM, Cuong Phu;TRAN, Nhu Thi Quynh;LE, Hang Thi Thu;NGUYEN, Hanh Thi Hong;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.12
    • /
    • pp.1035-1043
    • /
    • 2020
  • Project manager plays a very important role in the success of any project. The primary duty of the project manager is to combine the outcomes or results of the various processes and activities of project management into a systematic project management strategy or plan for the project. In the construction industry, a lack of motivation is an urgent problem for many project managers in construction and engineering projects. Lack of motivation affects the quality and productivity of jobs, reducing profits and growth for companies, businesses, contractors or organizations that rely on human resources. The reasons for this lack of motivation are diverse ranging from salary to culture to life and working environment, among others. Through surveys and data analysis using Cronbach's Alpha reliability and EFA (Exploratory Factor Analysis), our research scaled the factors affecting work motivation of project managers in the construction industry in Vietnam. The research results identified six major groups of relevant factors including (i) salary and benefits, (ii) work environment, (iii) promotion opportunities, (iv) organizational culture, (v) interest in the job, and (vi) relationship with the organization. From there, this paper contributed useful information as well as measures for businesses, companies, contractors or organizations in the construction industry.