• Title/Summary/Keyword: Project Plan

Search Result 2,087, Processing Time 0.042 seconds

A Study of Game Project Curriculum for Integrated Subject (통합교과로서의 게임 프로젝트 교육과정 운영방안 탐구)

  • Choi, Seung-Kwan
    • Journal of Korea Game Society
    • /
    • v.16 no.5
    • /
    • pp.111-122
    • /
    • 2016
  • The purpose of this study is to suggest an curriculum model of teaching scheme which performs team project learning based on Integrated project with different fields. To address this goal, the present study suggests a practical game project model under the same game-making circumstances as game industry by consisting of real case of convergence parts(game graphic, game design, game program). This project-based learning case has been conducting Integrated project education since 2008 in A educational Institute in Korea. The results of study suggest a standard of Integrated-based curriculum model and it is constructed with two parts. The first part is what students learned during project processing, such as responsibility, communication. The other part is how to construct the educational environment for integrated project. It explains how to organize and build teams, plan of integrated project, rule the role of team task, perform collaborative task, present interim/final presentation, evaluate grade. This study is expected to be utilized as a framework for the instructional design and the guideline for improving learner competency in team project learning.

Analyzing the Influence Relationship between Barriers to Success of Project Management Using DEMATEL Method (DEMATEL 기법을 활용한 프로젝트 관리 성공을 저해하는 장애요인 간의 영향 관계 분석)

  • Lee, A-Yeon;Chang, Mi-Kyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.3
    • /
    • pp.214-229
    • /
    • 2021
  • There is an increasing need for complex and large projects to be carried out quickly. As the duration, size, and cost of the project increase, concerns about project failure are also rising. Finding factors that hinder the performance of an effective project and eliminating them in advance or controlling and managing them more effectively can be a more direct way to secure the success of the project. Previous studies have identified compositional dimensions that are classified according to attributes, covering the various obstacles that affect the success of the project through existing literature. It is a follow-up to previous research. Using DEMATEL techniques, we would like to propose to explore the appropriate measures that an entity and organization can take by identifying the causality between factors through cross-impact analysis of project disabilities and even presenting factors that may arise when they are identified. As a result of the analysis, according to the indicators to evaluate the importance, 8 factors were found to be relatively important factors, excluding the factors that Failure of project feasibility analysis and Technical environment change. In addition, 5 factors were found to be causative factors; Technical environment change, Unclarity project plan, Strategic consistency error, Inaccuracy of requirement definition, and Failure of project feasibility analysis. In contrast, the remaining 5 factors were found to be the result factors; Lack of benefits realization, Negative attitude of top management, Stakeholder conflict, Difficulty of process management, and Disturbance of communication.

Classification and consideration for the risk management in the planning phase of NPP decommissioning project

  • Gi-Lim Kim;Hyein Kim;Hyung-Woo Seo;Ji-Hwan Yu;Jin-Won Son
    • Nuclear Engineering and Technology
    • /
    • v.54 no.12
    • /
    • pp.4809-4818
    • /
    • 2022
  • The decommissioning project of a nuclear facility is a large-scale process that is expected to take about 15 years or longer. The range of risks to be considered is large and complex, then, it is expected that various risks will arise in decision-making by area during the project. Therefore, in this study, the risk family derived from the Decommissioning Risk Management (DRiMa) project was reconstructed into a decommissioning project risk profile suitable for the Kori Unit 1. Two criteria of uncertainty and importance are considered in order to prioritize the selected 26 risks of decommissioning project. The uncertainty is scored according to the relevant laws and decommissioning plan preparation guidelines, and the project importance is scored according to the degree to which it primarily affects the triple constraints of the project. The results of risks are divided into high, medium, and low. Among them, 10 risks are identified as medium level and 16 risks are identified as low level. 10 risks, which are medium levels, are classified in five categories: End state of decommissioning project, Management of waste and materials, Decommissioning strategy and technology, Legal and regulatory framework, and Safety. This study is a preliminary assessment of the risk of the decommissioning project that could be considered in the preparation stage. Therefore, we expect that the project risks considered in this study can be used as an initial data for reevaluation by reflecting the detail project progress in future studies.

A Study on the Planning for Geochang-gun High Technology Industrial Complex (거창군 첨단사업단지 계획방향에 관한 연구)

  • Kim, Kang Sub;Kim, Young Kyou;Lee, Sang Jung
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.7 no.1
    • /
    • pp.11-18
    • /
    • 2005
  • This study analyzes the feasibility of constructing Geochang high technology industrial complex and present s the site, plan and development strategies. As a result, first, the Wallpyung area, superior form others in site characteristics, accessibility, surrounding facilities, was decided to the plan site. Second, the plan tries to adapt in the environment and maximizes the spatial link and user conveniences. Third, a transportation plan includes a circulation street network that adapt in topography, and considered future traffic situation and accessibility, hierarchy of road etc. Fourth, it also plans to locate a environment-friendly central park in the middle of site and buffer areas along at the outer sites and both sides of the roads. Fifth, for the development, it is advised to construct a public institution which manages the whole project and it is necessary to build a cooperate system.

  • PDF

A Study on the Systematic Housing Plan Presentation Using Visual Perception Theories -Focused on the Composition of Presentation Panel- (시지각이론을 이용한 주택설계 프리젠테이션 체계화에 관한 연구 -프리젠테이션 판넬 구성을 중심으로-)

  • 이화숙
    • Journal of the Korean housing association
    • /
    • v.12 no.2
    • /
    • pp.77-85
    • /
    • 2001
  • Along with the development of creative design ideas, how to effectively present design concepts is also an important consideration on housing plan process. This could consequently make it possible to automate presentations. In spite of such needs of presentations any significant efforts for the systematic design presentation have not been made yet. The research goals established in order to solve these problems are to develop structures of presentation and analyze the cases of it. This paper explains structures of housing plan presentations in two ways: the compositional elements of panel presentations and the relationships among the elements. The elements include a project title, a synopsis, design concepts, building layouts, floor plan1 and 2, longitudinal and latitudinal elevations, sections, projection and perspective views, and model photographs. Among various relationships among panel compositional elements this study uses relationships based on the Gestalt theory, the balance theory by Rudolf Arnheim and the optical array theory by Gibson. The relationships investigated on the basis of the visual perception theories include the relationships between compositional elements and background space, visual weight balance, horizontal and vertical balances, grouping, and visual layout patterns.

  • PDF

A Study on the Activation of 4-H Farming Organization for development of Environmental-Friendly Agriculture (친환경농업육성을 위한 영농 4-H조직의 활성화 방안)

  • Yoo, Duck-Ki
    • Korean Journal of Organic Agriculture
    • /
    • v.13 no.1
    • /
    • pp.23-51
    • /
    • 2005
  • In this article the author provided a brief introduction to the function and activation of 4-H fanning organization. The strategies developed to improve the environmental-friendly Agriculture are as following : the efficiency cooperatives of 4-H fanning organization, invitation of the upbringing plan of organization leader for promotion of the pilot region project of environmental-friendly Agriculture connected with green tourism, the establishment of reasonable management plan and strategies. In conclusion, there must be strategic measures to increase the income of environmental-friendly farmers. All of this information could be useful for the further development of the strategy for environmental-friendly Agriculture in organization and management.

  • PDF

A Study on Rail Transport Method by the Construction Plan of Samcheok Electric Power Complex (삼척발전단지 건설계획에 따른 철도수송력 강화 방안 연구)

  • Cho, Chi-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1327-1334
    • /
    • 2009
  • According to the construction plan of Samcheok electric power complex from year 2009 to year 2020, many people are interested in this area. This national project which invests about 8.6 trillion won will have great influence to rail transport considering current depression days. Samcheok electric power complex will be the largest plan in Korea, and it is necessary to have railroad construction plan as soon as possible considering the route change of domestic coal transport and the possibility of coal transport by rail from North Korea, Russia and China after reunification of Korean peninsula. Also, Samcheok electric power complex will be located in the east area railroad route and it is important to study about this area. This study will mention about the railroad route of east sea north line and Pohang $\sim$ Samcheok line, and review the prospect and strengthening method of coal transport by railroad according to the construction of Samcheok electric power complex.

  • PDF

Development of Certification Plan for the Type Certification of KPP Aircraft (KPP 형식증명 인증계획 수립)

  • Kim, Youngtae;Kim, Deahee;Hwang, Sungmin;Kim, Sungjin;Yoon, Heekeon
    • Journal of Aerospace System Engineering
    • /
    • v.3 no.1
    • /
    • pp.30-35
    • /
    • 2009
  • This study is on the establishment process of Certification Plan of KPP small aircraft development, domestic BASA(Bilateral Aviation Safety Agreement) shadow certification project. For the development of certification plan incorporations process understanding applicable regulations, selection of certification basis, definition of means of compliance and establishment of compliance checklist. On the basis of this process, we develop type certification procedure suitable for domestic small aircraft.

  • PDF

A Study on the Implementation of the Safety Management Plan in the Construction Technology Promotion Act (건설기술진흥법 안전관리계획서의 실행방안에 관한 연구)

  • Shin, Sung-Su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.104-105
    • /
    • 2018
  • The purpose of the safety management plan under the Construction Technology Promotion Act is to improve the quality and safety of construction engineers during construction work. To prevent a collapse accident of a facility after completion by preventing a collapse accident of gravel, an earthwork, a river structure or the like. In order to prevent collapses, the purpose of the project is to study measures to improve the ability of construction technology promotion law to ensure the quality of construction materials at the time of construction work.

  • PDF

Interior Project of IN-CHEON 'S' Elementary School Library (인천 'S' 초등학교 학교 도서관 구축 프로젝트)

  • Lee, Hyok-Jun;Lee, Jong-Sun
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2005.10a
    • /
    • pp.219-220
    • /
    • 2005
  • This present study purposed to propose a plan of building a future oriented school library that supports teachers' teaching with various multimedia and Internet materials applicable in class immediately, helps students' self directed learning activities, and plays its role as a cultural center of the local community. As for research methods, this study examines the basic directions and characteristics of school libraries defined by the Ministry of Education and Human Resources Development, and investigates the current state of school libraries. In addition, we survey cases of library plans in Incheon, and suggest standards for planning and propose a plan. Ultimately, we establish a library plan for S Elementary School in Incheon and execute the plan and, in the course, derive ideas for satisfying students' demands with regard to their sentiment, stable and flexible layout and flow lines, facilities and space within the library, etc. What is more, we create indexes for library planning so that school libraries can contribute to various cultural activities and the development of local community beyond their functions as school library facilities.

  • PDF