Performance Measurement Method and Case Study for BIM based Construction Simulation System (BIM기반의 건축시공시뮬레이션 시스템 성능분석 방법 및 사례연구)

  • Jun, Ki-Hyun;Yun, Seok-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.15-23
    • /
    • 2013
  • Because that construction project is usually uncertain and the plan of it changes frequently, it is difficult to make a reliable and feasible plan for it. As the BIM technology is developed, we can simulate the future of the construction project visually and make more reliable plan. However, data production efficiency is not so high, it is used just for animation and presentation usage. Although, a lot of construction simulation systems are developed, it is difficult to measure performance of them. In this study, we defined the construction simulation work process and the scenarios to measure performance of them. The performance measurement method using simulation process scenario can make possible benchmark test of them.

Case Studies on Preparing a Business Plan for the Foundation of Food Service Business and Analysis of Investing Economy. (외식사업 신규창업을 위한 사업계획서 작성방법 사례와 투자경제성 분석에 관한 연구)

  • 홍기운
    • Culinary science and hospitality research
    • /
    • v.3
    • /
    • pp.385-421
    • /
    • 1997
  • This study was performed as placing stress on business plan preparation and investing economy analysis centered to cases upon presenting the premises of study for new foundation of food service business. The summarized results are as follows: 1. In the aspect of carrying out process of practical project, establishing the promotion strategy, the facility project program, the menu program, the facility and furniture program, organization & manning schedule, the business operation schedule, review of all laws & provisions and the allout promotion schedule in order were deployed. 2. Analysis of investing economy for review of profitability 1) In case of investment, excluding 600million for the real setate lease among the total investment of 1billion, it was required by 161, 235, 000 for interior project, 161, 110, 000 for facility & equipment, 19, 235, 000 for fittings, 27, 600, 000 for menu plate & uniform, 27, 600, 000 for furniture, 13, 800, 000 for sign article. 2) In case of loss & profit presumed the annual turnover is to be 1, 115, 856, 000 the contigent profit(before tax) is to be 148, 966, 000 which is 13.3% in comparson to the sales amount and the net profit(after tax) for this term s to be 104, 276, 000 which is 9.3% against the sales and the profitable ratio to the equity investment( 500 million) is 20.9% and it satisfies 20% of the premises of study. 3) In case of the payback period will be approximately two(2) years which indicated within three(3) years that is standard of new project evaluation term of ordinary enterprise. 4) In case of internal rate of return it will be 21.5% which is favorable profitability as taking into account of 15% that is standard of new project evaluation by ordinary enterprise based on general downtown money interest. That the investing value of Happy Day profitability is hinted as it is sufficient enough as the case under this study based upon such results and considered that securing supremacy is competitive power in case of commitment will be possible.

  • PDF

Working Design Management of the Design Build Projects Using CBR (CBR(Case-Based Reasoning)을 활용한 턴키 공사 실시설계관리 방안)

  • Park Se-Kun;Kim Young-Jae;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.432-437
    • /
    • 2002
  • As the working design process of Turn-Key projects is a basic process for the final contract, this process has lots of business decision to be made. Because such results of business decision can be the basis on contract documents, it is the step which needs a through management for Turn-key project. But in case of domestic construction companies, because those are not organized process of working design process, project manager has had lots of trouble at each process to make the business decision. As a means of settling the problems, this research is initiated. First, working decision management process is identified and generalized by interviews with project managers. Second, cases that actually happened in the project are investigated and categorized. Third, response plan to solve the problems and check lists to prevent the problems are suggested. Finally, the process, cases, response plan, and check list are integrated using CBR for future reuse.

  • PDF

A Study on the Current Status of an Archive Village Project and Its Improvement Plan: The Case of I County (기록사랑마을 운영현황 및 개선방안에 관한 연구 - I군 기록사랑마을을 중심으로 -)

  • Oh, Yu-Jin;Han, Hee-Jung;Yuk, Hye-In;Kim, Soojung
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.15 no.2
    • /
    • pp.7-30
    • /
    • 2015
  • In 2008, the National Archives of Korea initiated the Archive Village project for the purpose of protecting valuable private records and enhancing the awareness of archival culture. To justify the expense of the government-supported project and determine its future direction, it is necessary to analyze the current status of the project. To do that, the researchers visited an Archive Village in I county and examined its accessibility, exhibition contents, facilities, equipment, etc., through observation. Interviews were also conducted with the person in charge of the project in the National Archives of Korea, as well as eight residents and three persons who were involved in building and managing the Archive Village in I county. Based on the results of the observation and interviews, the study suggests recommendations to improve the operation of the Archive Village in I county. The findings of the study will help other villages plan acquisition and management, as well as how to make important private records in local areas available.

Development of Process Model and Software for Evaluation of Privately-funded Infrastructure Projects (민간투자사업의 사업평가관리 절차개선모델 및 프로그램 개발)

  • Jeng, Pyung-Ki;Baek, Hyeon-Gi;Seo, Jong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.140-149
    • /
    • 2011
  • The government introduced private infrastructure projects in order to reduce its financial burden by introducing private sectors efficiency and creativity and by utilizing their funds. Through revision, the act on the private investment of the infrastructure, many changes were made in the private investment system. The evaluation task to assess the project proposer's capability and to select a promoter is regarded as the most important process for fairness and transparency of the project. In this study, the improvement of project plan evaluation task of current private infrastructure projects is proposed based on the standard guideline for evaluation procedure of private infrastructure projects provided by Korea Development Institute. In addition, software program for evaluation procedure is made to improve the efficiency and enableconvenient evaluation task.

Deduction of Change Management Factors and Weight Estimation based on ANP in Urban Renewal Project (ANP 기반 도시환경정비사업의 변화관리 요인 도출 및 중요도 산정)

  • Shin, Seung-Yoon;Son, Myung-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.176-186
    • /
    • 2013
  • For urban renewal projects progressing in large scale, it carries a characteristic that frequently changes the environment, subject, law, plan and the like by a demand from various participants and internal/external factors. As such large-scale urban renewal projects have a lot of possibilities of change, it requires setting a plan to recognize the possible variable factors by each project operation stage and to manage it systematically by defining the variable factors on the basis of working process of the entire project. Therefore this research has produced a factor of main variable management based on working process for systematic variable management on the projects that inherent various possibilities of change as urban environment refurbishment projects. And it also suggests the status of main variable factors characterized by project operation stages quantitatively through reflecting external and internal features for variable factors produced from utilizing ANP methodology.

Influence Analysis of Determinants on Member's Payment in Urban Renewal Project (도시정비사업에서 조합원 입주부담금 결정요인의 영향력 분석)

  • Kim, Seong-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.11
    • /
    • pp.7690-7697
    • /
    • 2015
  • This study is to reveal structural causal relationship of individual factors influencing association member's substantive payment in the economic view which is a critical factor of project implementation and identify its influence through simulation and actual proof analysis. As the results of analysis, the first, association member's substantive payment is decided to allow for the difference between special price for association members and general price and the profit arising between the time of approval of disposal plan and moving in. The second, on analysis of sensitivity of individual factors influencing association member's substantive payment, floor area ratio applied to project has the biggest influence. Association member's payment is also greatly influenced by the subject of cost allocation for establishing infrastructure in project area. The third, this study set up a structure model based on causal relationship among the factors deciding association member's payment and empirically examined influence and path of influence which the individual factors exercise. The result indicates that control elements and regional characteristic elements influence association member's payment through the medium of plan elements.

The Policy Proposal for Selecting Facility-stems of Rural Living Environment Renewal Program (농촌생활환경정비 대상 시설항목의 선정: 정책적 제안)

  • 윤원근;이상문
    • Journal of Korean Society of Rural Planning
    • /
    • v.4 no.2
    • /
    • pp.8-19
    • /
    • 1998
  • The problem of outdated and surplus facility-items in existing Rural Living Environment Renewal Program(RLERP) makes this study focus on restricting the range of facility sorts for the purpose of coㅁins with the changing rural living environment. In the four aspects of plan establishment, project implementation, comprehensiveness and linkage between programs, this study made an analysis of the existing RLERP that has 4-stage hierarchy, namely, Gun(county), Myun(primary administrative district), village and project site level Firstly, Myun and upper level policy programs fulfill the comprehensiveness and planning aspects, but have defects in the implementation and linkage aspects. Secondly, the village level programs satisfies more or less the four condition, but give rise to the problems of equity between the project target village and the non-target, and of generalization of the planning method applying to a specific village. At last, project level programs, controlled by several ministries, have defects in comprehensiveness and linkage aspects, exposing the sectoralism of central government. Above all, the existing RLERP has so many facility items, which have led to inefficient investment till now. Therefore, it's necessary that the environmental facilities should be selected(simultaneously reduced ), referring to following 5 criteria. (1) Exception of facilities relating to agricultural production. (2) Confined to public facilities to be constructed by government support. (3) Common-use facilities located in small town and below level area. (4) Consideration of not only the present need but also the future need of rural residents. (5) Reflection of a regional difference of mountain, plane and suburban area. Just 13 kinds of living environmental facilities are finally selected as the result of the selecting work, which can be an new alternative for RLERP. Concludingly, the selected facility items should be integrated into a designated project site by the prepared plan in order to enhance the efficiency of RLERP, investment and also to satisfy the four analytic aspects mentioned above.

  • PDF

A Study on the Improvement of National R&D Project Performance Evaluation and Budgeting System

  • Kyunghwan, Park;Hyungwook, Sim;Seokki, Cha
    • Asian Journal of Innovation and Policy
    • /
    • v.11 no.3
    • /
    • pp.342-362
    • /
    • 2022
  • The national R&D project is a major strategy for the development of science and technology in the country. This is promoted for the purpose of improving the welfare of the people, such as creating jobs and fostering small and medium-sized enterprises, through the results of science and technology research conducted with support from the national budget. Therefore, analysis of the performance evaluation and budgeting system of the current national R&D project is one of the essential parts of preparing a system improvement plan. This study derived improvement plans through a comparative analysis of national R&D project performance evaluation and budget systems in Korea and leading countries such as the United States and Japan. As a result, it was confirmed that it may be difficult to derive innovative research results due to the lack of sustainability and a short period of time to require quantitative performance. To overcome these difficulties, the need for system improvement as follows was suggested. First, it is necessary to enlarge and prolong national R&D projects. Second, a plan for securing sustainability is needed in consideration of the main characteristics of each research field. Finally, it is necessary to strengthen the linkage between organizations in charge of national R&D projects. And also, there is a need for a system that can continuously identify problems and improve the system. In addition, the constitutional amendment will be necessary to separate science and technology from economic development, which states that Article 127, Paragraph 1, "Science and technology should be subordinated to economic development," which is the science and technology article of the current constitution.

Barriers to Success of Project Management (프로젝트 관리의 성공에 영향을 미치는 장애요인)

  • Lee, A-yeon;Moon, Kyung-mi;Kim, Seung-chul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.3
    • /
    • pp.179-190
    • /
    • 2020
  • As the business environment is rapidly changing with globalization and complexity of information flows, the uncertainty is also very increased for project environment. Although many studies have been conducted to find out the critical factors for project success, there still exist different views to define project success. Furthermore, implementing success formula for one project does not necessarily guarantee a success for another project since there are other elements that impede the success of project. In this regards, it is imperative to examine what are the barriers to project success. This study aims to examine the barriers that impede the success of project. Past literature was thoroughly reviewed to collect and develop a preliminary list of elements that affected project performance negatively. Experts were interviewed to refine the list and the final list of the measurement items were developed. A survey questionnaire was developed with the final list of measurement items, and a survey was conducted on the practitioners with project experience. After the survey, an exploratory factor analysis was conducted on the final list to extract the component dimensions which in turn formed the group of project barriers. The exploratory factor analysis provided ten factors, which are difficulty of process management, failure of project feasibility analysis, cost overruns and lack of cost benefits, unclarity project plan, strategic consistency error, stakeholder conflict, inaccuracy of requirement definition, disturbance of communication, technical environment change, negative attitude of top management.