• Title/Summary/Keyword: Project Plan

Search Result 2,087, Processing Time 0.03 seconds

A Plan of Project Information Management through Analysis of Drafting Process for Transportation Planning (양중계획입안 프로세스의 구조화를 통한 프로젝트 정보관리 방안)

  • Kim, Jin-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.3
    • /
    • pp.101-109
    • /
    • 2008
  • As the number of high-rise building construction projects grows up, the subject of the transportation planning has become one of the grave issue. however important decision making are made by the experience of the a planner without the rational plans for information sharing. therefore, the purpose of this study is to suggest a plan of prefect information management not only for describing drafting process for transportation planning but also for systematizing information used in the procurement, transportation and construction phase to achieve these objectives, this study 1)analyzes the prior theory about transportation planning, 2)performs a case study of actual project to embody the problems of site management by analyzing the results of interviewing experts. In conclusion, the following factors are systematized : 1)the structure of drafting process for transportation planning, 2)the contents of information used in the procurement, transportation and construction phase, 3)the actual condition of code breakdown structure in transportation Planning phase. It is anticipated that the proposed methodology would be able to improve information management among the related engineers and accumulated data that might be used in similar construction projects in Korea.

A Design and Implementation of the Web-based Project Learning System (웹 기반의 프로젝트 학습을 위한 시스템 설계 및 구현)

  • Kim, Eun-Jeong;Park, Phan-Woo
    • Journal of The Korean Association of Information Education
    • /
    • v.6 no.1
    • /
    • pp.53-63
    • /
    • 2002
  • The purpose of this thesis is to design and implement an efficient Web- based Project Learning System(WPLS) in particular for the interactive of an elementary school children. The WPLS in this paper has four main parts ; user interface, learner module, administrator module and database. This system was implemented in accordance with the project themes solving learning processes. So the learner module consists of five steps ; project theme proposal, project plan, project execution, web-publishing, and project test. WPLS can improve student`s ICT using ability and academic achievement.

  • PDF

A Study on the Inhabitant's Satisfaction of Community Facilities Demonstration Project for Rural Elderly (농촌 고령자 공동시설지원 시범사업 주민만족도 조사 연구)

  • Kim, Jin-Hwan;Park, Chung-Shin;Song, Seo-Ho
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.17 no.4
    • /
    • pp.9-16
    • /
    • 2015
  • This study examined the current conditions of the community facilities constructed by demonstration project for rural elderly that were promoted for the last two years by the ministry of agriculture, food and rural affairs. The type of community facilities are community living home, community food service facility and small bath house. And it was accomplished satisfaction survey for analyzing the effects of demonstration project focused on inhabitants and users of community facilities constructed by demonstration project. The results are as follows. First, The satisfaction index of community facilities was evaluated high level in generally. Second, Inhabitants and users of facilities were presented high level satisfaction in humanity sector, especially. Third, It should be to establish maintenance and management plan such as supporting of linkage program and operation cost for secure the sustainability. Consequently, the implementation of community facilities demonstration project to improve the living conditions of rural elderly is entirely appropriate. The results of this study were considered to promoting demonstration project for improving quality of the facilities and securing effectiveness of the project.

A Study on the Factors Affecting Utilization of Life SOC Facilities of Rural Center - In the Case of Base District of Seongjeon-myeon Rural Center Revitalization Project of Gangjin-gun - (농촌중심지 생활SOC시설 이용의 영향요인 연구 - 강진군 성전면 농촌중심지활성화사업 거점지구를 대상으로 -)

  • Kim, Tae Ryang;Kang, Hee Ju;Cho, Joong Hyun
    • Journal of Korean Society of Rural Planning
    • /
    • v.28 no.2
    • /
    • pp.51-59
    • /
    • 2022
  • The purpose of this study is to provide a plan to promote the use of life SOC facilities by analyzing the factors affecting utilization of life SOC facilities established as part of the rural center revitalization project. To this end, we selected Seongjeon-myeon, Gangjin-gun where the rural center revitalization project was implemented, conducted a survey on residents while analyzing the project details, and analyzed the results. This study revealed that the residents with a cognitive level for the rural center revitalization project and life SOC tended to more actively use the life SOC facilities. Therefore, to boost residents' use of the life SOC facilities, it is necessary to promote their understanding of and interest in the rural center revitalization project in the project implementation phase and have them be sufficiently aware of the facilities by operating pilot programs for residents in each facility and holding local events and festivals. This study will lay a steppingstone for active resident use of life SOC facilities established in rural centers and provide basic data for further research.

Assessing Critical Quality Metrics for Successful Baseline Construction Scheduling

  • Bivans, John;Choi, Jin Ouk
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1241-1241
    • /
    • 2022
  • In the current construction industry, difficulty arises in creating an adequate baseline schedule to establish a fundamental plan for construction. This presentation will present the research findings which investigated industry-recognized schedule metrics that aid in the successful implementation of said schedule. Industry organizations (Association for the Advancement of Cost Engineering, the Government Accountability Office, the Project Management Institute, and local city, state, and county government offices) provide standardized guidelines with specific metrics requirements to ensure successful implementation. However, most of those metrics are substantiated or validated in their effectiveness. The study examined the impact between these industry-recognized critical metrics and three distinct scheduling characteristics: Project Type, Project Duration, and Project Density (number of activities within a schedule). The research results showed that, among the 12 various schedules evaluated in parallel with 20 industry-recognized critical metrics, seven metrics substantially demonstrate a significant impact on a project schedule's success. Furthermore, six of the seven metrics directly correlate to at least one of the three scheduling characteristics outlined. As a result, this research has established more predictable outcomes based on impacts between three distinct project characteristics and 20 of the most discussed/researched critical scheduling metrics in the field. This allows management teams to have more confidence in establishing critical milestones and accurate turnover dates from the start of the project through its final completion.

  • PDF

A Study on the Plan of Central Area in Pienza Town (피엔짜 도시 중심지역의 계획에 관한 연구)

  • Kim, Seok-Man
    • Journal of architectural history
    • /
    • v.12 no.3
    • /
    • pp.7-18
    • /
    • 2003
  • The purpose of this study is to analyze the plan of central area in Pienza town. The nucleus of the plan was the principal square with the surrounding buildings - Cathedral, Piccolomini, Episcopal and Communal palace, focused attention on the first city plan of the Renaissance. The results of study are as follow: 1. The plan of central area in Pienza town is formed by relation with each other, in which theory including the "De re aedificatoria" of Alberti and practical plan of Pienza were united. 2. Though the plan of Pienza is not total city planning for new function and system, it has a many influence for city planning, square type and building disposition, through new project method as a result of prospective at central area in Pienza town 3. The square plan is formed of centripetal role to integrate with harmony the partial units of each other from diverse elements in scale, function, style and type of buildings, in which it can characteristics of the beginning of Renaissance. 4. Not only composition of plan, elevation and section of the Cathedral, Piccolomini and Episcopal palace, but composition of opennings are formed of proportional system of 1:1, 1:${\surd}$2, 1:2 etc.. And such proportional systems is composed of relation with each other in harmony, deciding width, length and height from among part and part, whole and part for spatial and formal composition.

  • PDF

A Study on the Congress Palace in new city(E42) of Rome - Focused on the Adalberto Libera's project(1937-1943) - (로마 신도시(E42) 국제회의장에 관한 연구 - 아달베르토 리베라의 당선작(1937-1943)을 중심으로-)

  • Lee, Dae-Jin
    • Journal of architectural history
    • /
    • v.18 no.4
    • /
    • pp.81-99
    • /
    • 2009
  • The study is on the analysis of Adalberto Libera's works, which are those of the competition works for international congress hall in 'E42'. I exerted a conclusion from analysis and studies of congress palace as well as informed data about architect Libera and uninformed original sketch of it. 1. Through analysis of original sketch data in possession of archives of paris Centre Pompidue and relevant sketch from the works, Libera adopts the modern architecture of Italy to the formalization process of concept as one of architectural methods. 2.In contrast to the way of elucidation of historicity of classicism architect, Libera's initial sketch is one of the traits from modernist's architectural concept process. Libera completes his architectural style to have developed new architecture vocabulary from 'Floating transparent box' which was result from intuition and imagination. 3 By comparing all the first plan, the second plan and constructed project, we can infer that Libera's plan was influenced by E42's classicism urban environment and masterplanner Piacentini. In addition, through historicity explanation method of modernist, it is adjudicated that the front side of facade with classism and the back side of facade with modern are partially accepted. 4. By analysing architectural concept's formalization process from original sketch of Congress palace, outstanding architect of Italian Fascism architecture, it provided new methods of architectural programming with the concrete examples.

  • PDF

A Study on Tourist Destination Remodeling: Gossi-Cave in Yeong Wol (동굴관광지 리모델링 개발사례 연구 - 고씨동굴 관광지를 대상으로 -)

  • Park, Yong-Soon;Park, Han-Sik
    • Journal of Korean Society of Rural Planning
    • /
    • v.14 no.3
    • /
    • pp.99-110
    • /
    • 2008
  • Tourist destination remodeling project is the tourist destination activation program to promote underdeveloped tourist destination that the Ministry of Culture and Sports has been implementing as a pilot program since 2005. Since previous tourist destination development programs focused on developing facilities, they could not quite cope with the changes in the tourism paradigm. Especially for caves, they could not escape from the simple sightseeing for the characteristics of the resource were fit to the caves. These results failed to meet tourist demands to experience and participate that the number of tourists is continuously decreasing. To cope with the circumstances, the government introduced a pilot program, a comprehensive tourist destination reorganization plan designed to comprehensively promote the tourism contents development (software) that can differentiate the region such as the tourism activation programs, tourist destination management and operation system reorganization (humanware) along with the repair of facilities (hardware project). This study emphasized the participation of residents who are the actual subject of management and operation of tourist facilities and programs in the course of establishing the master plan for remodeling for Gossi Cave that it can be used as the reference for establishing remodeling plan based on resident participation in the future.

Development of Fashion Product Entrepreneurship Education Process for Crowdfunding (Part I) -Focusing on Wadiz Rewards-based Crowdfunding- (크라우드펀딩을 위한 패션제품 창업교육과정 개발 (제I보) -와디즈(Wadiz) 보상형 크라우드펀딩을 중심으로-)

  • Lee, Jungho;Kwon, Hajin
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.44 no.1
    • /
    • pp.175-191
    • /
    • 2020
  • This study proposes an entrepreneurship education process for fashion product start-ups through rewards-based crowdfunding. It examines issues such as: the general concept of crowdfunding and the pros and cons of rewards-based crowdfunding, the detailed curriculum plans in a chronological order for the regular class development, and the presentation of a visual plan to show the whole process. An entrepreneurship education process is developed in 13 steps: research on crowdfunding market, prototype plan, prototype production, story development, visual contents development, rewards development, project evaluation, public schedule & service setting, period setting & start funding, community management (Q&A), funding ends & deposit, complete manufacturing & start delivering, and the final information disclosure & open the next project plan. This research is intended to investigate rewards-based crowdfunding as a new paradigm of entrepreneurship and apply entrepreneurship education in fashion product development. However, it is limited to studying the Wadiz crowdfunding platform in Korea. Therefore, we propose a case study on various crowdfunding platforms in Korea, a case study on entrepreneurial curriculum application, and a follow-up study on the possibility of entry into an overseas crowdfunding platform.

Performance Measurement Method and Case Study for BIM based Construction Simulation System (BIM기반의 건축시공시뮬레이션 시스템 성능분석 방법 및 사례연구)

  • Jun, Ki-Hyun;Yun, Seok-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.15-23
    • /
    • 2013
  • Because that construction project is usually uncertain and the plan of it changes frequently, it is difficult to make a reliable and feasible plan for it. As the BIM technology is developed, we can simulate the future of the construction project visually and make more reliable plan. However, data production efficiency is not so high, it is used just for animation and presentation usage. Although, a lot of construction simulation systems are developed, it is difficult to measure performance of them. In this study, we defined the construction simulation work process and the scenarios to measure performance of them. The performance measurement method using simulation process scenario can make possible benchmark test of them.