• Title/Summary/Keyword: Project Plan

Search Result 2,080, Processing Time 0.028 seconds

A Study on the Master Plan of New Rural Community Development Project of Sam-Sin Village in Hadong (하동 삼신마을 신농촌개발사업 기본계획에 관한 연구)

  • Kim, Kang-Sub;Kim, Seok-Kyu;Lee, Sang-Jung
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.4 no.2
    • /
    • pp.79-92
    • /
    • 2002
  • Internationally Present-day, the paradigm in rural community is changing to continually prospering rural community. So, it's time to provide the vision of new rural life. The purpose of this study is to provide the basic plan which can revitalize the rural area and improve the living standards of the inhabitants. The range of this study is restricted to Sam-Sin village in Hadong and from Feb. 2002 to May 2002. We arranged the outline of 'new rural community development project' and investigated the present state of the village by spot survey. Through the study, we suggest green-tea which can increase the life quality of inhabitants and achieve the prosperity of the village at the same time. We expect the results of this study can realize the Green Tourism and establish the identity of village caused by green-tea cultural festival.

  • PDF

Master Plan for Long-term Transmission System in Myanmar (미얀마 장기 계통계획 수립 결과 및 전망)

  • Hur, Y.;Kim, J.H.;Han, K.N.;Choi, Y.S.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.9-11
    • /
    • 2005
  • kEPCO is now conducting a project called the "Feasibility Study & Basic Designs for the 500kV Transmission System in Myanmar" as its second overseas project following the "Development Study on the rover System Network Analysis in Myanmar" performed from 2001 to 2002. As a part of this project, this paper deals with the analysis process and results of the demand forecasts, master plan for transmission system expansion, and the major factors for the new 500kV transmission facilities.

  • PDF

Rural Development Projects and their Impacts on Built Environment; Case of Ucheon Myon-center Village (면소마을 개발사업의 건조환경에의 영향과 개선 시사점 횡성군 우천면 우항1리의 경우)

  • Jang, Seong-Jun
    • Journal of Korean Society of Rural Planning
    • /
    • v.5 no.1 s.9
    • /
    • pp.66-75
    • /
    • 1999
  • The study intends to find out contents and impacts of rural development projects implemented by government in Ucheon myon-center village (Hoingseong-county) between 1989-1995. The projects in concern are Rural Industrial Estate Project(1989-90) and Rural Collective Village Project(1992-93), The restructuring of village plan introduced new construction and renewal of buildings that are required for a myon-center in general has to be. The study reveals some morphological patterns the village has and needs to be adjusted. As a conclusion, it proposes a conception of self-containment for a myon-center development. It is necessary that a project plan strategy should be based upon harmonious exploitation between old and new, flexible planning, and sense of technological alternatives.

  • PDF

Study on the ENC Sea Trial Plan (전자해도 실선시험에 관한 연구)

  • 서상현;이희용
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1998.10a
    • /
    • pp.85-95
    • /
    • 1998
  • ECDIS, highlihgted as a new technology for the navigation safety, could replace the paper charts in the bridge and make the more safe navigation possible. For the marines to use the ECDIS, the infrastructrue of the ENC production and distribution, the development of IMO compliant ECDIS, the training program for the ECDIS usage and related matters are thought as the key points to be solved. Also it is necessary for the ECDIS usage and related maters are thought as the key point to be solved. Also it is necessary for the related groups, such as ECDIS manufactures, users, ENC producers, the to be involved in developing the national infrastructure altogether to promote the ECDIS usage. Upon these background, the Korean ENC pilot project was introduced and the comparison study of the SHARED project coordinated by MPA(Maritime Port Authority, Singapore) and the Canadan Pilot project has been done. With such a analysis, the Korean ENC sea trial test plan is presented.

  • PDF

Preparation of Application Plan for 3-d Noise Prediction Model in Road Noise (도로소음의 3차원 소음예측모델 적용방안 마련)

  • Sun, Hyosung
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.10a
    • /
    • pp.842-843
    • /
    • 2014
  • When the environmental impact assessment (EIA) of an development project is performed, the noise prediction model is used to evaluate the noise impact and prepare the noise reduction measures according to the implementation of an development project. Especially, the application of a 3-d noise prediction model is increased to describe the complex noise environment including high-rise living accommodations. Therefore, this paper suggests the application plan of a 3-d noise predicton model for the road noise impact assessment of a development project.

  • PDF

A study on the Plan for Organization Activation use analysis of Success factor Integration Information System (통합정보시스템 구축 프로젝트 성공 요인 분석을 통한 조직 활성화 방안에 대한 연구)

  • Park, Jong-Ki;Kang, Kyong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2006.11a
    • /
    • pp.367-372
    • /
    • 2006
  • Since 1990's, many enterprises have constructed Integration Information System. Especially, they want to become an advanced company use ERP package. Already, ERP system come to high level which is stabilized and support independent business process of many industry sectors. Therefore, important success factors for ERP project are change management and organization activation. Although most companies had previous good plans, but those are not satisfied. Because of failed to change management and discontinued next activity for promotion. This paper studied success factors of project team and plan for organization activation. Also, it proposed next study subject about investigate the role of the member of task force team as a factor that makes the ERP system a success. The results of this study can be used for a successful construction of the ERP system as a solution about internal problems of Project team.

  • PDF

A study on the Plan for Organization Activation use analysis of Success factor Integration Information System (통합정보시스템 구축 프로젝트 성공 요인 분석을 통한 조직 활성화 방안에 대한 연구)

  • Park, Jong-Ki;Kang, Kyong-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.5
    • /
    • pp.231-242
    • /
    • 2006
  • Since 1990's, many enterprises have constructed Integration Information System. Especially, they want to become an advanced company use ERP package. Already, ERP system come to high level which is stabilized and support independent business process of many industry sectors. Therefore, important success factors for ERP project are change management and organization activation. Although most companies had previous good plans, but those are not satisfied. Because of failed to change management and discontinued next activity for promotion. This paper studied success factors of project team and plan for organization activation. Also, it proposed next study subject about investigate the role of the member of task force team as a factor that makes the ERP system a success. The results of this study can be used for a successful construction of the ERP system as a solution about Internal problems of Project team.

Case Study : BIM for Planning, Simulating, and Implementing Complex Site Logistics

  • Kim, JongHoon;Cohen, Fernando Castillo
    • Journal of KIBIM
    • /
    • v.5 no.4
    • /
    • pp.47-52
    • /
    • 2015
  • This paper presents a case study using Building Information Modeling (BIM) for planning, simulating, and implementing complex site logistics in a headquarter office building construction project in Silver Spring, MD. As part of the project a prefabricated 92ft structural tube steel pedestrian connector bridge was installed between two adjacent buildings in the city of Silver Spring, MD. There were multiple significant challenges to deliver, offload, prepare, and install the connector bridge safely, on time, and with the minimum disturbances to the neighbors. BIM was of the foremost importance to visualize, simulate, analyze, improve, and communicate the site logistics plan from delivery to installation of the connector bridge. As a result of the effort, GC of the project was able to prepare a highly detailed plan, communicate it effectively to all stakeholders, and flawlessly execute the work as planned. This case study would provide a useful reference for contractors who are seeking a better planning method that enables generation of more accurate, implementable, optimized plans for complex site logistics.

A Study on Water Supply Plans for Horticulture and Livestock Complexes within the Saemangeum Area (새만금 원예·축산단지 용수공급 방안 연구)

  • Choi, Kyung-Sook;Kim, Hae-Do
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.54 no.3
    • /
    • pp.125-132
    • /
    • 2012
  • Saemangeum development project is the world's largest tidal flat reclamation project. It is currently under construction, and proceeding with phased developments. The construction of agricultural areas within the Saemangeum reclamed lands is also a part of this project. These areas will have multi-functional complexes aiming to produce mainly eco-friendly horticultural crops and livestock products for the purpose of export. The major concern is to obtain sufficient water with appropriate quality to supply to those areas. The objective of this study is therefore to provide available water supply plans for agricultural purpose, especially for horticulture and livestock complexes. Alternative methods for water supply are purifying water from the Saemangenm lake or using water supply services providing by K-water or local governments. This study investigates to find an economical water supply plan through comparisons of these methods. As a result, the water purification method with Saemangeum lake water could be advantageous for given water supply conditions to horticulture and livestock complexes.

A STUDY ON SPACE ZONING BY COMPUTING IDLE-TIMES IN CONSTRUCTION PROCESSES

  • Sang-Min Park;Won-Suk Jang;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.509-512
    • /
    • 2013
  • An inappropriate space zoning plan causes the unnecessary transportation of construction material and equipment among work areas and increases the disorder of work space. Space zoning is an essential operation management technique which contributes to reduce the process and/or operation idle-time. This paper introduces a method that computes the idle-times between construction operations (or processes) by using Web-CYCLONE. It allows computing with idle-times that affect the construction productivity. Using the idle time between operations and between processes, it computes the optimal number of zones and finds the optimal combination of zones that minimize the idle times. The method contributes to minimize the idle times relative to the operation schedule using complete enumeration. This paper presents the system prototype in detail. A case study is presented to demonstrate the system and verifies the validity of the model. It allows a project manager to establish space zoning plan that effectively segregates a project into optimal number of construction zones and to assign the constrained resources (e.g., laborer, equipment).

  • PDF