• Title/Summary/Keyword: Project Plan

Search Result 2,087, Processing Time 0.024 seconds

A Study on the Business Plan Changes of Housing Complex evaluated by the "Housing Performance Grading Indication System" (주택성능등급표시제도의 개선을 위한 인정 단지의 사업계획변경 현황에 대한 실태조사 연구)

  • Lee, Sung-Ok;Bae, Cheol-Hak
    • KIEAE Journal
    • /
    • v.11 no.6
    • /
    • pp.43-51
    • /
    • 2011
  • This study aims to analyze on the change status in the project plan of the housing complex as evaluated through the Housing Performance Grading Indication System. This a a system for assessing quantitatively the comprehensive, unified performance of housing by an objective standard from the design stage since January 9, 2006. As housing is a composite with various performances, it is required necessary to objectively assess the various performances from the design stage for building better housing. Thus, this study analyzed the change status and objectively described objectively it centering on the construction and structure drawings for 12 items posted in the Facility Management System_(FMS) out of examples recognized by 2011 since the implementation of the system. The changes were analyzed though observing each performance item-specific characteristics and confirming the books approved for use. In various parts, such as the site area, landscape plan, plane plan for unit, supplementary welfare facility plan, finishing materials, window size and location, the project plan was changed. These changes may result in a grading change in of the performance items of the system. This study purpose is for it to be used as a basic resource required for future system development by supplementing the limitation of the design phase and then through playing a basic role for the assessment after completion.

Risk based Value Index Evaluation Model for Modular Design Alternatives in Plant Construction Projects (플랜트 건설사업의 모듈러 설계대안별 RVI 평가 모델)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.98-107
    • /
    • 2022
  • The purpose of this study is to suggest a model for evaluation of a risk based value index for modular design alternatives in plant construction projects. Accordingly, 1) Setting the basic project cost and the scope to apply the module, 2) Evaluating the importance, easiness, and effectiveness index for Engineering, Procurement, Fabrication, transportation, and construction work, 3) Estimating the total project cost by analyzing the risk reserve Step, 4) Comparing the effectiveness index and total project cost for each modular design alternative, it was composed of the steps of deriving RVI. To verify such a model, Plan-A, which applied a module to one process, and Plan-B, which applied a module to three processes, were composed to evaluate RVI.

A Study on Construction of Management System for Efficient Management and Application of Regional Development Project (지역개발사업의 효율적 관리 및 활용을 위한 관리체계 구축에 관한 연구)

  • Kim, Nam-Jung
    • Land and Housing Review
    • /
    • v.7 no.1
    • /
    • pp.1-8
    • /
    • 2016
  • This research has its objective in searching for a management plan that is stronger than existing plan for the regional development project in time for the execution of "Regulations on Regional Development and Support". Accordingly, the following plans for improvement are suggested to make improvements in lack of regional development projects management awareness; absence of integrated management system; and lack of reliability in project management information. Firstly, the management of regional development project needs to be operated as a system for project evaluation management based on related legislations. Secondly, various information of regional development project should construct a database, which becomes an information system that can be utilized by the central government and regional governing organizations. Third, to promote efficiency in regional development project management and expertise, it is necessary to prepare a project management system utilizing professional outsourcing organizations and such. Lastly, it is necessary to improve the work environment to enhance the expertise and the responsibilities of those government officials in charge of the project.

Maturity model considering the interrelation between software project management areas (소프트웨어 프로젝트 관리영역의 상호영향을 고려한성숙도 모델)

  • Jeon, Soon-Cheon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.5
    • /
    • pp.823-832
    • /
    • 2011
  • Recently, as the project becomes larger and the number of project increases by the information system integration in the public and financial sectors, it is necessary to have a proper plan to manage the information system project. There have been many researches about the project management, success elements and failure elements, but the research on the interrelation between project management areas leaves much to be desired. This research deduces the scope, schedule, quality, work force and risk as the project management areas from the preceding research and the questionnaire and interview with PM developers, information system builders and data processing experts. And, it analyzes the interrelation and the relative importance between management areas, classifies the progress of the management areas under plan, implementation and completion stage and presents the frame to evaluate the accomplishment of each progress.

A study on Urban Lighting Plan methodology with Space Syntax Theory (공간구문론을 활용한 도시조명계획 방법론 연구)

  • 오은숙;최안섭;김영욱
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2002.11a
    • /
    • pp.233-237
    • /
    • 2002
  • In consideration for evaluating urban lighting plan as culture of a society, preparing lighting plan while designing urban plan is a fundamental process. This study proposes a methodology, maintaining and embossing urban throughout preparing a long-term urban lighting plan considering overall urban space as well as improving competitive power for lighting to take an important role in total environmental design project.

  • PDF

Development of a Project Management System for the Turnkey-based Plant Project (중공업 일괄수주공사를 위한 프로젝트 관리 시스템 개발 사례)

  • Ko, Chang-Seong;Rho, Jae-Jeung;Hyun, Jae-Myung;Kim, Myoung-Gwan
    • IE interfaces
    • /
    • v.11 no.3
    • /
    • pp.167-180
    • /
    • 1998
  • This study is concerned with the development of a project management system for the turnkey-based plant project, which will help the site manager to plan, control, and report the project progress. This system has been developed as one of the modules of the integrated information system for the H Heavy Industry Co. and is composed of five subsystems; project information system, drawing-material management system, process management system, project progress report system. A/S management system. it also integrates commercial project management package in order to schedule the project activities and report the project progress to the owner. The main purpose of the system is to provide project information, including drawing, material, and progress, to the site manger in the real time and to accumulate site know-how for the turnkey-based plant project.

  • PDF

Evaluation System for Defense IT Project in Korea: Post-Implementation Stage

  • Lee, Sangho;Song, Chong-Hyun
    • Journal of Multimedia Information System
    • /
    • v.5 no.4
    • /
    • pp.291-297
    • /
    • 2018
  • Performance measurement is not an easy task. However, it is necessary to measure the expected value of the informatization project to be invested, to help the successful progress of the informatization project, and to confirm the result of the informatization project. This study describes the evaluation systems of the defense informatization project in Korea used after the end of the informatization project (post-implementation evaluation stage). In the post-implementation evaluation stage of proposed system, the informatization project is evaluated in terms of performance achievement, project plan compliance, project management, and economic validity. For each element, this study suggests metrics and practical measurement method. With metrics and their method, it can be evaluated which project is better than others. Moreover, the lessons learned can be developed. Under scarce budget condition, defense organizations can make better performance from IT project with the evaluation system suggested in this study.

U-City Service Classification Standard & Cost Sharing Plan through the Case Studies of U-City Construction

  • Yun, Jeong-Ran;Lee, Sang-Hun;Yang, Dong-Suk
    • Land and Housing Review
    • /
    • v.2 no.2
    • /
    • pp.101-109
    • /
    • 2011
  • Recently, the construction of U-City or of U-City service (U-service) in many kinds of urban development projects becomes the general trend. However, as the construction of U-city comes into the spotlight like the trend of the times, various service constructions are being indiscreetly implemented since it's processed focusing on local specialized projects or local landmark project by a local autonomous entity or an institute in charge being off the original purpose of the improvement of living quality of residents and the efficiency of urban management, which causes a number of problems on the process, maintenance, operation and management of those projects. Therefore, this study is to derive the standard pattern of U-service construction through the analysis of patterns and numbers of U-service and problems during the process of construction in domestic U-City construction case district, and is aimed to suggest the reasonable direction of service construction based on this. 11 projects areas in which data related to U-service are available among U-City construction project areas were selected for the subjects of this study, and it's standardized with 228 detailed unit services that were suggested by U-Eco City R&D and with 11 service domains that are regulated in "the Act of ubiquitous city construction etc.", and it is limited to services that were suggested in U-City case area of which design was completed by July, 2010 based on this. The actual state of various U-service construction is analyzed through case studies as well as reviews on the legal and theoretical concept and the method of pattern classification of U-service, the plan for the standardization (pattern classification) of U-service and the plan for the construction body of service and to share the costs are suggested as the plan to construct reasonable U-service based on this for the method and the procedure of this study For the method to construct U-service, the plan to classify the pattern of U-service into the basic service and additional service is suggested, and whether it has the publicity, whether urban infrastructure is included, whether utilities are included, the body of realization, the recipients, the urgency, the importance and the spreading, etc. are suggested for the index to determine the pattern of service. The method to get the executor of a project to construct the basic service, the method to get the executor of a project to construct the most basic service among the group classification of service and to get a private entity and a local autonomous entity to perform additional service in the future, and the method to construct the whole service and to distribute the construction costs were suggested, and the first one that determines the body of construction after dividing U-service into the basic service and the additional service was evaluated to be the most reasonable one. And the plan to solve the problem that the excessive construction costs of U-service are shifted onto the executor of a project through benefit principle, balanced distribution principle and consultation and mediation between the interested parties was suggested for the criteria to share the costs.

A Study about BIM Execution Plan for Specialty Contractors at Construction Phase - focused on Specialty Contractors in Reinforced Concrete Works - (시공단계에 참여하는 전문건설업체를 위한 시공 BIM 수행계획 구축 - 철근콘크리트 업체를 중심으로 -)

  • Lee, Joo-Sung;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.5 no.3
    • /
    • pp.19-32
    • /
    • 2015
  • For decades, the productivity issue has been a primary concern for the all stake-holders who participate in domestic construction industry. Especially, between a whole life cycle of building, the construction phase's productivity problem makes or break the entire project. In this respect, the general construction company, who accept the order and construct the building(so called General Contractor), should consider various strategies, such as schedule management, cost management, quality management, inner-crew management, etc., for the productivity improvement., and almost of these management methods have been studied for a long time. But, the researches and studies about the specialty contractor, who construct the building directly in construction site were not sufficiently complete yet. This research begins as an idea which tries to apply the BIM(Building Information Modeling) into the tasks of Specialty contractors for their productivity improvement. And for the effective application of construction BIM to specialty contractors, establish of the BIM project execution plan for them, not the fragmentary adoption of BIM. Therefore, in this paper, we develop the BIM project execution plan for the reinforced concrete companies who conduct the framework construction which located on CP(Critical Path) Especially, we model the "Construction BIM Use List for the RC Work", "BIM Application Master Process" and "BIM Application Detailed Process", and general contractor who use these BIM uses list and process models can manage various specialty contractors about schedule, cost, earned value, quality, safety and environment management systematically.