• Title/Summary/Keyword: Project Phase

Search Result 1,152, Processing Time 0.07 seconds

Examining ways to support engineering students for choosing a project topic in interdisciplinary collaboration (공대 학생들의 프로젝트 주제 선정을 위한 초기 교수학습 지원 방안 탐구)

  • Byun, Moon-Kyoung;Cho, Moon-Heum
    • Journal of Engineering Education Research
    • /
    • v.19 no.1
    • /
    • pp.37-46
    • /
    • 2016
  • The purposes of the study were to examine engineering students' concerns and problems while they were choosing a project topic in interdisciplinary collaboration and to suggest ways to support them in an early stage of collaboration phase. To answer the research questions, we conducted a case study with engineering participants in GCTI 2015, an interdisciplinary collaborative and creative group project. Multiple data sources including focus group interviews, online survey and researchers' observation notes were used to triangulate research findings. We found four main concerns of engineering students. These concerns include (1) lack of self-efficacy, (2) limited resources, (3) lack of shared, meaningful, and common goals, and (4) lack of content knowledge. Based on these concerns we proposed four supports in an early stage of the collaborative project. These supports includes (1) implementing an orientation program, (2) providing opportunities for social interactions, (3) providing expert feedback, and (4) providing consultation for team building.

SPACE VLBI PROJECT

  • MURATA YASUHIRO
    • Journal of The Korean Astronomical Society
    • /
    • v.38 no.2
    • /
    • pp.97-100
    • /
    • 2005
  • The first Space-VLBI project, VSOP, started successfully with the launch of the dedicated space-VLBI satellite HALCA in 1997. The project has been in scientific operation in the 1.6 GHz and 5 GHz bands, and studies have been done mainly of the jet phenomena related to active galactic nuclei. A second generation space- VLBI project, VSOP-2, has been planned by the working group formed at ISAS/JAXA with many collaborators. The spacecraft is planned to observe in the 8, 22 and 43 GHz bands with cooled receivers for the two higher bands, and with a maximum angular resolution at 43 GHz (7 mm) of about 40 micro-arcseconds. The VSOP-2 satellite will also have the capability of the phase-reference and full polarization observations, which will produce more powerful results than those of the VSOP project. Far-future space-VLBI projects following VSOP and VSOP-2, have a large potential to achieve enough resolution and sensitivity to satisfy astronomers in future.

Technical Parameter Selection Method of the System Development - Focusing on the Military R&D Project - (시스템개발에서의 기술적성과측정 파라미터 선정 방법 - 국방 R&D 사업 중심으로 -)

  • You, Yi-Ju;Kim, Jin-Hoon;Park, Young-Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.5 no.1
    • /
    • pp.49-56
    • /
    • 2009
  • This research attempts to acquire technical performance measure information based on identifying the Critical To Quality(CTQ) parameters of user requirement by using Quality Function Deployment(QFD) methodology in the initial phase of a defense R&D project. This results will contribute to the integration of technical progress to the Work Breakdown Structure(WBS) based project performance tracking. It also improve the bridging of systems engineering activities to the project management and the project decision making process.

  • PDF

Assessment of BIM-Based Government Funded Projects at the Design Phase (BIM 적용 공공 프로젝트 설계단계의 평가 방안에 관한 연구)

  • Shin, Seung-Hyup;Ham, Nam-Hyuk;Kim, Jea-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.213-216
    • /
    • 2010
  • Nowadays BIM(Building Information System) is applied to the public construction delivery system. BIM can help communications between project applicants through the extraction of the exact and prompt information. It also increases the efficiency of planning, construction, economic feasibility and maintenance in the whole project. Due to increasing demands of BIM, project evaluation and its process on the final deliverables have been in major interests. Thus, through the analysis of the current BIM project, characteristics, types and applications have been researched. We have discussed completeness, relationship and planning of BIM data, which are the standards of evaluation.

  • PDF

Critical Environmental Management Factor by Project Participants for Considering Work Importance and Difficulty (업무 중요도-난이도를 고려한 프로젝트 참여주체별 핵심 환경관리 항목 도출)

  • Hong, Suk-Kyoo;Kim, Chang-Won;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.214-215
    • /
    • 2013
  • Recently, Construction industry has been trying to reduce environmental impacts reflecting the global trend 'Green Growth'. However most of previous studies focused on operation & maintenance phases and do not have been approached construction phases. In addition, environmental management factors by project participants are assessed with only weight of factors, overlooking these work difficulty. Therefore This study aims to deducted the critical environmental management factors by project participants considering work difficulty in plan, design and construction phase. The basis data is collected through literature reviews and interview targeting each project participant and analyze these data using importance-difficulty analysis(IDA).

  • PDF

Inchon International Airport's Role in the 21st Century as Northeast Asia's Hub Airport (인천국제공항의 21세기 동북아 중추공항으로서의 역할)

  • Lee, Sun
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.1
    • /
    • pp.14-22
    • /
    • 2001
  • Kimpo International Airport, located within the Seoul metropolitan district, experienced a sudden surge of passengers and cargo in recent years. In 1990, MOCT sponsored feasibility studios and Youngjong Island location was selected as the most suitable choice among four proposed sites to build a new airport. The construction work was then commenced in November 1992. Phase I project facilities are scheduled to start its operation in March 2001 with an annual capacity of 27 million passengers and 1.7 million tons of cargo for both enplaning and deplaning from International liners. Kimpo International Airport will remain in operation primarily for domestic passengers and cargo only. Phase II project construction work will add two more runways with its related facilities by 2005. Inchon International Airport will then conveniently serve 100 million passengers for enplaning and deplaning, and 7 million tons of inbound and outbound cargo annually in its full capacity. All the airport facilities In phase I and phase II periods are constructed to meet international standards. A fully integrated transportation network and logistics function systems should be accomplished prior to the full operation of the airport. With these sccomplishments, the state-of-the-art airport is poised to meet the needs of a rapidly growing worldwide air transport industry, and will more than adequately fulfill its role as a hub airport for the Northeast Asia region.

  • PDF

Learning Phase and Capacity Building in the Rural Community Development - Focusing on the Independent Rural Community Creation Project - (농촌 지역사회개발의 학습단계와 주민역량강화 -자립형 농촌공동체 만들기 사업을 중심으로-)

  • Kim, Kyung-Hee;Oh, Deamin;Joung, Choungsop
    • Journal of Agricultural Extension & Community Development
    • /
    • v.24 no.1
    • /
    • pp.49-61
    • /
    • 2017
  • The community development program is a project to design to develop rural areas and to enhance the situation of rural community. Participation in community development is the key to promoting efficiency for community development. The purpose of this study was to discuss the result of application of learning phase for capacity building of community development. This study examined cases from rural area, using examples from eight communities that have been able to get people's participation. These examples suggest that the learning phases for rural communities include five important factors: sharing the perception, setting a goal, goal refinement, empowerment, vision setting. After completing the rural community development program, the result of each steps were analyzed. The result of this study contributes to knowledge about phase for capacity building in the community development and suggests ways to increase of effectiveness of rural development program and promote participation based on an understanding of a rural community development context.

AN ASSESSMENT SYSTEM OF ECO-FRIENDLINESS OF CONSTRUCTED FACILITY IN THE DESIGN PHASE USING VALUE ENGINEERING

  • Byung-Soo, Kim;Dong-Eun, Lee;Suk-Hyun, Kwon;Min-Kwon, Choe
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1625-1629
    • /
    • 2009
  • The new paradigm called 'Low Carbon Green Growth' involved in reducing greenhouse gas is on the rise as a critical issue worldwide. The essential of Kyoto protocol issued in 1997 is to achieve the sustainable economic growth environments by converting existing production system to eco-friendly one. The protocol imposes the liability to reduce greenhouse gas to the countries joined to it. The paradigm is directly involved in the energy consumption and environmental pollution caused by construction activities. Value Engineering which are mainly applied in the design phase in practice is a measure to improve the value of a constructed facility by analyzing and/or appraising the functions and costs of it. However, an appropriate method which assesses eco-friendliness of constructed facility has not been propose by researchers. This paper proposes a method which assesses the performance involved in eco-friendliness of constructed facility using Value Engineering (VE) in the design phase. The method estimates the environmental cost relative to the amounts of energy consumption and environmental pollution occurred over the entire project life cycle. The database called "Life Cycle Inventory DB", which stores information about the amounts of environmental pollution, is used. The algorithm which retrieves the amounts of environmental pollutions from the DB and converts them into environmental costs is developed. The algorithm is implemented into a system which quantifies the eco-friendliness of constructed facility in the design phase using VE.

  • PDF

The Case of CM as Applied to the Pre Design Phase - Focused on the Case of YongJu New Tobacco Manufacturing Plant - (설계 전 단계에서의 CM 적용 사례 - 영주 신 제조창 CM 사례를 중심으로 -)

  • Park Yong-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.19-26
    • /
    • 2003
  • In the face of the deterioration of tobacco manufacturing plant, we've got the plan for now manufacturing factory for the competitiveness, modernization, rationalization and environment. To achieve the goals, it was necessary to plan and investigate in the early stage of project. Consequently. We determined to introduce the CM in the early stage. We Performed the whole phase of CM services front the pre design phase services like feasibility analysis of site and building, plant master plan, selection of manufacturing facilities and drawing up the RFP, to maintenance management phase after the completion of a construction work. Contrary to the another CM projects, YongJu New Tobacco Manufacturing Plant CM organized the CM team with expert in field before the design development. This study analyze and evaluate the CM services of YongJu project which performed on the pre design phase. The purpose of this study is to emphasize the importance of pre design phase CM and support that CM services will start from the pre design phase.

  • PDF

A Software Manpower Profile for Software Development Life Cycle (소프트웨어 개발 라이프사이클 인력 프로파일)

  • Lee, Sang-Un
    • The KIPS Transactions:PartD
    • /
    • v.11D no.5
    • /
    • pp.1123-1132
    • /
    • 2004
  • Successful project planning relies on a good estimation of the manpower required to complete a project. The good estimation can be derived from Rutnam's Rayleigh Model or Phillai et al.'s Gamma Model. These models only can be applied for the projects which the need of manpower is increased exponentially and the highest of manpower is required at the end of development phase. However, in a practical project, most manpower is required during development phase and a small amount of manpower is assigned during maintenance phase. In addition, the Waterfall Model and Unified Process only can be adopted for development phase. So the current development environments cannot be adopted into the existing manpower distribution models which the highest manpower is required at the end of development phase. This paper suggests an appropriate model for development phase to solve this problem. First, the appropriate manpower distribution for development phase of the Waterfall model was derived from Putnam's manpower distribution and then manpower distribution of development phase was derived for Unified Process. After comparing the required manpower of two Processes, total manpower distribution is similar each other even though the required manpower and task is different for each point of development phase. From this result, a unified model is derived and it can be applied for both development processes.