Construction of metro transportation infra is a large-scale project requiring tremendous financial resources. This study suggests operation method to use for rapid transit line existing infra such as Gyeongbu line and spare line capacity following second phase KTX construction. Reviewing various constraints of metro rapid transit operation, we found that the conditions for metro rapid transit operation are already satisfied in Daegu area, just like the case of Gyeongbu line in Seoul Metro area. Also, the evaluation of the economic feasibility of metro rapid transit operation in Daegu area shows that B/C is about 2.4, which implies that there is sufficient economic feasibility. According to the result of sensitivity analysis, the project is economically feasible unless the passenger demand decreases 15% and construction costs increases more than 70%. B/C is evaluated large because the utilization of already exiting infra lowers the initial cost. As one of mass transportation system of large capacity, metro rapid transit can generate significant spillover effect: It will strengthen competitiveness of metro area by connecting cities within the area and by extending one-day life zone of the area, to say nothing of the benefit of improving traffic condition. The construction of metro rapid transit network is necessary for the mass transportation system of Yeongnam area as well as Daegu area, and it may work as a starting point for uniting Daegu and Gyeongbuk and strengthening regional competitiveness.
Kim, Hyeon-Seung;Moon, Hyoun-Seok;Choi, Gwang-Yeol;Kim, Chang-Hak;Kang, Leen-Seok
Korean Journal of Construction Engineering and Management
/
v.13
no.2
/
pp.11-24
/
2012
Recently, BIM (Building Information Modeling) technique is being considered as a critical delivery condition for the public projects according to the increase of best practices by practical application of BIM. However, since existing BIM studies are focused on the design and construction phases, those results are not considering the life cycle of a construction project. Therefore, this study suggests an integrated BIM operation process that enables an application of BIM for each phase of a construction project from planning to maintenance phases and develops an integrated BIM system based on the suggested methodologies. This study developed basic BIM functions and its application process by analyzing information systems in each project phase for a bridge construction project. Besides, this study performed case study and survey analysis for construction managers to verify a practical applicability of the developed system. Therefore, it is expected that the integrated BIM system is going to be utilized as a 3D-based integrated information management system considering life cycle of construction projects.
Journal of the Korea Academia-Industrial cooperation Society
/
v.10
no.10
/
pp.2803-2809
/
2009
For a successful construction project not only construction engineering and project management technology but also economic evaluation technique is required. Design and construction technologies are necessary to receive a project order. However, construction management technology which can be apply from the project initial phase to the project operation and management phase is required to create a benefit from the project. Construction management technology is one of the effective factors for project success. Economical and efficient cost management from the planning phase influences the project success. This study investigated cost flow and cost factors of domestic Sewage Treatment Plant project for systematic analysis of cost items following the entire project phase. Particularly, data modeling based on domestic Sewage Treatment Equipment maintenance cost DB was performed, and maintenance cost estimation trend line is suggested using Monte carlo Simulation Method to decrease uncertainty of actual results DB and for feasibility study. Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society.
PFI(Private Finance Initiative) for suppling SOC and public facilities instead of Government Infrastructure Project introduced from 1994. BTO(Build-Transfer-Operate) project had been major type of PFI system from 1994 to 2005. But after changed the Law of PFI on SOC, the BTL project newly introduced. In BTO system, the Government retrieves the investment through the operating income, but in BTL system, the government lease the facilities. As the BTO and BTL projects are widely adopted and implemented to ease the fiscal burden of government, but it has caused the tremendous fiscal burden each year over the period operation. Therefore this study attempted to analyze the question, that is, why government fiscal burden tipping? Hence, this paper, compares the difference of business structure between BTO and BTL project and explore the vicious and virtuous business structure, with the method of circular causal loop analysis. As a result, it has shown that there are some positive feedback and negative feedback loops cause the tipping and easing of government fiscal burden.
International conference on construction engineering and project management
/
2009.05a
/
pp.1388-1395
/
2009
In March 2007, Korea's Ministry of Construction & Transportation (MOCT) established "Guidelines on the Computerization and Use of Geotechnical Investigation Results," which took effect as official instructions. The 2007 Geotechnical Information DB Construction Project is underway as a model project for a stable geotechnical information distribution system based on the MOCT guidelines, accompanied by user education on the geotechnical data distribution system. This study introduces a geotechnical data entry system characterized by the standardization of the geotechnical investigation form, the standardization of metadata for creating the geotechnical data to be distributed, and the creation of borehole space data based on the world geodetic system according to the changes in the national coordinate system, to define a unified DB structure and the items for the geotechnical data entry system and to computerize the field geotechnical investigation results using the MOCT guidelines. In addition, the present operating status of the geotechnical data entry system and entry data processing statistics are introduced through an analysis of the model project, and the problems of the project are analyzed to suggest improvements. Education on, and the implementation of, the model project for the geotechnical data entry system, which was developed via the standardization of the geotechnical investigation results form and the metadata for institutions showed that most users can use the system easily. There were problems, however, including those related to the complexity of metadata creation, partial errors in moving to the borehole data window, partial recognition errors in the installation program for different computer operating systems, etc. Especially, the individual standard form usage and the specificity of the person who enters the geotechnical information for the Korea National Housing Corporation, among the institutions under MOCT, required partial improvement of the geotechnical data entry system. The problems surfaced from this study will be promptly addressed in the operation and management of the geotechnical data DB center in 2008.
Recently, researches on IT Service Management (ITSM) for improving information system operation service and information system outsourcing cost estimation model are proliferating. This study suggests a new cost model of IT operation service and optimizing method based upon the characteristics of operation service as a long-term and continuous business service for both user's and service provider's point of view. This study explains the cost optimization model of IT operation service by improving service request management process, such as adequate reception and control, proper valuation, process management using project management methodology, effective organization and time management of service personnel. Especially in this study, service ability improvement effect and fixed operation cost reduction effect are defined to prove the proposed new cost model.
Project evaluation is the process of evaluating the progress and results of a project. Smart city projects can be divided into system components (infrastructure, services, platforms), or projects can run simultaneously for multiple services. In addition, services are developed and expanded through additional projects. In order to ensure that the smart city, which is composed of various projects, proceeds in accordance with the goals and strategies, periodic project evaluation is required during the project implementation process. The smart city project evaluation system proposed in this paper is designed to provide comprehensive and objective indicators by reflecting various factors that must be considered for projects occurring in all stages of planning, design, construction, and operation of smart cities. The indicators derived from the evaluation system can be used by decision makers to determine the direction of smart city project development. In addition, it is designed so that the performance of the project can be evaluated interim before the end of the project and the feedback obtained from it can be reflected. To introduce the application method of the smart city project evaluation system proposed in this study, the evaluation system developed in this study was applied to the smart city project case of Incheon Free Economic Zone (IFEZ). Based on the evaluation results, items that can maximize the improvement effect of each smart city project item were presented, and the direction of smart city project implementation was suggested. By utilizing a smart city project evaluation system that reflects the characteristics of smart city projects that are composed of multiple projects, comprehensive planning and management of smart city projects will be possible, and this study will serve as a reference for identifying priority improvement factors for projects.
It is expected that domestic railway vehicle operation companies may be subjected to GHG emission reduction when GHG emission system is enforced. This study aimed that reviewing on GHG emission system such as CDM, VCS and KCER, and analysing availability of GHG emission credit acquisition for railroad transportation sector. In order to estimate GHG emission credit, a GHG emission estimation methodology should be developed, which includes GHG emission baseline estimation and GHG emission monitoring method, MRV method and etc. Modal shift project, high speed train technology, straight lining project, mass transportation technology, operation optimization tehcnology and etc. may produce GHG emission credit.
A study on Technical Specifications of the current collection system in G7 Korean High Speed Train Project is performed in this paper. First, an appropriate level of contact wire tension for 350km/h commercial operation is proposed based on the foreign high speed train operation experiences and a relevant technical criterion, Second, two optimized design specifications of the pantograph for G7 Korean High Speed Train are proposed based on current collection quality. In order to perform design optimization, a formulation on the follow-up characteristics of a pantograph with 3 levels of masse-spring-damper is derived in this paper. Dynamic design parameters of the pantograph are adjusted to maximize follow-up capability at the dropper and span passing frequencies.
This study finds out and suggests success factors for the application of RIMS project through the case study of Seoul Metro and literature survey. The successful application of RIMS needs expert knowledge and concept of BOM, standardization of maintenance planning, check lists of heavy maintenance inspection, organization structure of rolling stock maintenance offices, material management system of warehousing and the process of parts repairing between offices, connection of material ordering system, problem solving of circular spare parts administration among inspection, maintenance, and material organizational units, systemic serial number management of parts with RFID, daily closing diary connected with work process chart, and sufficient period of RIMS's test run. RIMS contributes to real time management of rolling stock maintenance, transparency of management, reliability of train operation, customer satisfaction, and management innovation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.