Computers and internet have the potential to radically development. But, computer is a just tool by itself. This study is control implement in a way that exploits the capacity of network of processors to execute many tasks concurrently in architectural desigv. The collaboration design system constituted integrated CAD (computer-aided design) system at the base of standardization database environment network and world wide web (WWW). Collaboration design management system is composed of Project Management, Part Management, Process Management , and Appraisement system. They can provide frameworks for effective coordination and management of design work in accordance with the Collaboration Design Support System operating rule accommodatingly. architectural data can be collaboration design environment accessible through a web browser and located at a server. whenever their work investigated each others. Throughout process, the database acted as an individual design and it made them available in realtime. And they can have quick overview of the work. That way a continuous evaluation of best design was distinctly and highly. In the future, New architectural design methods are collaboration environment could result in productivity and quality.
This paper presents the development and testing of a power conditioning system(PCS) for application to a 100kW Molten Carbonate Fuel Cell(MCFC) generation system. The MCFC generation system is a part of a four year government funded research project that began in 2001. This paper presents the results of various tests and performance verification of the 100kW PCS using a DC power system that simulates the DC output of the MCFC fuel cell. Performance of the DC/DC, DC/AC converters were verified, and basic control functions such as grid connection, protection and characteristics of each components were tested. The tests were performed under light load and rated load conditions to verify the operation efficiency, power quality effects, and stability of the PCS.
Journal of the Korean Society of Systems Engineering
/
v.16
no.2
/
pp.1-15
/
2020
Nuclear power plants in South Korea are operated to cover the baseload demand. Hence they are operated at 100% rated power and do not deploy power tracking control except for startup, shutdown, or during transients. However, as the contribution of renewable energy in the energy mix increases, load follow operation may be needed to cover the imbalance between consumption and production due to the intermittent nature of electricity produced from the conversion of wind or solar energy. Load follow operation may be quite challenging since the operators need to control the axial power distribution and core reactivity while simultaneously conducting the power maneuvering. In this paper, a systems engineering approach for multi-physics load follow simulation of APR1400 is performed. RELAP5/SCDAPSIM/MOD3.4/3DKIN multi-physics package is selected to simulate the Korean Advanced Power Reactor, APR1400, under load follow operation to reflect the impact of feedback signals on the system safety parameters. Furthermore, the systems engineering approach is adopted to identify the requirements, functions, and physical architecture to provide a set of verification and validation activities that guide this project development by linking each requirement to a validation or verification test with predefined success criteria.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.572-577
/
2008
In order to apply strategic advanced project management to the Korean construction industry, the study conducted a comparative analysis of the project management body of knowledge of the advanced countries such as the USA and Japan as well as Europe. As a result, it was found that the connection to 'execution' of 'strategy' was highlighted as a common main issue in the theoretical background of project management body of knowledge, and strategic planning, which aligns 'program management' based on the integration of multiple project management and operations in single project with 'portfolio management' for selection and concentration, has been emphasized. Accordingly, the study built up the framework for the application of strategic advanced project management for strategic action in the Korean construction industry and proposed the following applicable solutions for implementation into the current Korean construction industry: 1) Innovate global competitiveness by preparing an 'ideology and philosophy' for the strategic action of an organization, 2) Establish a strategic 'environment' in consideration of the culture and structure of an organization, 3) Propose a strategic 'vision' for attaining a realizable goal within an organization, 4) Create an 'investment' on the portfolio in line with the strategy, 5) 'Execute' the program through the portfolio and project management. Lastly, the study brought up strategies for sustainable growth by applying strategic advanced project management to the Korean construction industry with a view to acquiring 'Performance' through the implementation and operation of their integrated system.
Due to the characteristics of the railway system, a fleet consists of multiple railway vehicles, and a project contract is made by supplying multiple fleets to the customer. If the project fails to meet the due date, the manufacturer must compensate for the delay to the customer. In this paper, we analyze the operation strategies of the railway vehicle manufacturing factory using simulation, in which the layout adopts the concept of the flow lines, and when shortages of parts are considered. If there is a shortage of parts, the subsequent assembly process cannot proceed due to the nature of the assembly process. Thus, in order to overcome this problem, three strategies for performing assembly work are presented when the events of shortages are occurred. We also compare the strategies with respect to reduce the total cost which includes labor costs and compensation costs for delay.
Seo, In-Jin;Lee, Jeon-Seon;Kim, Han-Joong;Kim, Jong-Cheol;Kim, Jung-Yoon;Lee, Hyun-Sun
Proceedings of the KIEE Conference
/
2008.10a
/
pp.95-96
/
2008
We constructed an on-line PD monitoring system for the 380kV U/G Cable project at the Riyad 9012 substation in Saudi-arabia. The system will be monitoring the termination of the two 380kV XLPE Cables to prevent unexpected failure of the cable insulation. The system had been tested in the laboratory and on-site for detection of various PD signals and reliability of operation. The system distinguish the existence and nonexistence of the partial discharge and then judge the source of partial discharge using automatic PD pattern recognition software.
KEPCO is planning to operate 765kV Sin-Tao-Back and Sin-Ga-Pyong substations from 2004. A preventive diagnostic system to obtain the reliability of transformer and GIS is being adopted in 765kV substations. KEPRI has developed a preventive diagnostic system for 765kV substation since 1997. The preventive diagnostic system developed in that project was installed to the 345kV Eui-Ryung substation in June, 2000, and it is under circumstance durability test and operation capacity tests. In this paper, we analyze data of the preventive diagnostic system in 345kV Eui-Ryung substation.
As a part of school safety network construction project, a system of school marshal in Seoul-si and a project of academy safety guard in other regions are on the way of improvement. But, the crimes in and around the school, occurring frequently, are not solved easily, as this study points out. The effective improvement way of school safety network construction project is as followings. First, to enforce assistant-class school safety teacher system in order to nurture and educate experts in school safety, as a systematic support for strengthening occupational professionalism. Second, to enforce school safety network construction projects for construct circumstances through legal fix of school safety CPTED to make students free from crimes. This study looks into the real status and problem of school safety networks, and suggests system of school safety teacher and a legal enactment of CPTED, as systematic and a planed school safety countermeasure, not temporary.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
v.1
/
pp.211-216
/
2006
Within the frame of the MERCOSUR (South Common Market), one of the most important goals to achieve by its member states is a better cost effective international cargo transportation system. For this purpose the project of developing a commercial waterway linking the east region of Uruguay with the south of Brazil has been under study for a number of years now. Because of the high costs involved on the development of such waterway, the project has been indefinitely delayed. It is our intention to show an alternative way to reduce the present obstacles by using a budget oriented approach in order to determine the vessel best suited to use on the proposed waterway. So far, every study related to the project has been focused on the amount of work needed to modify the environment in order to accommodate the hardware already available in the region. The conclusions show that the cost of opening and maintaining the required navigation channel is high enough to discourage investment; the added responsibility to take care of any environmental damage incurred during the building and/or operation of the waterway makes searching for a less costly and hazardous option an interesting challenge. The proposed terminal on the Cebollat? River would be located at the heart of the Uruguayan rice growing region. Uruguay exports 90% of its rice production, being Brazil its biggest buyer. Wood chips and clinker are the other types of cargo considered to use the proposed waterway in route to either Brazil or to overseas destinations through the deep water port of Rio Grande. Through the analysis of local data by a Geographical Information System, international regulations regarding inland waterways and shallow draught vessel characteristics, we seek to propose a cost efficient alternative to apply on this particular scenario.
Korean Journal of Construction Engineering and Management
/
v.5
no.6
s.22
/
pp.191-202
/
2004
In this study, the project manager-oriented organization model has been verified by analysing it with forming a clear definition of detailed unitary duty entity to develop current non-efficient CM system constituted by functional organization with the decentralized responsibility and apply the model As a result from verification that the model provides valid solutions by comparing it with the existing, the model is better than the existing in cost savings, target profit sales rate, total rate of new on sales. Moreover, various activities in cost savings and cases where improvement is feasible are executed. However, the model caused some problems in organizational operation, project management and in division of duties so this study proposed improving management method
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.