• Title/Summary/Keyword: Project Operation System

Search Result 745, Processing Time 0.045 seconds

Comparative Evaluation of Multipurpose Reservoir Operating Rules Using Multicriterion Decision Analysis Techniques (다기준 의사 분석 기법에 의한 다목적 저수지의 운영율 평가)

  • Go, Seok-Gu;Lee, Gwang-Man;Go, Ik-Hwan
    • Water for future
    • /
    • v.25 no.1
    • /
    • pp.83-92
    • /
    • 1992
  • Selection of the best operation rule among a set of alternatives for a multipurpose reservoir system operation requires to evaluate many minor criteria I n addition to the major objectives assessed to the system, These problems are sufficiently complex and difficult that they are beyond heuristic decision rules and experiences in case several noncommensurable multiple criteria are included in the evaluation. With the assistance of multicriterion decision analysis techniques, it is possible to select the best one among various alternatives by systematically comparing and ranking the alternatives with respect to the criteria of choice. Evaluation criteria for multipurpose reservoir system operating rules were identified and defined, and the multicriterion decision analysis techniques were applied to evaluate the fore developed operating rules of the existing Chungju multipurpose project according to the identified nine multiple criteria. The application result shows that the methodology is very efficient to select the best operation alternative among a finite number of operating rules with many evaluation criteria for a large scale reservoir system operation.

  • PDF

Demonstration Project on Utilization of Telephone Consulting and Telemedicine System for Home Health Care of the Elderly (노인건강상담전화 운용과 가정간호사업 활성화를 위한 원격의료 시범사업)

  • 김정은;박현애
    • Journal of Korean Academy of Nursing
    • /
    • v.26 no.3
    • /
    • pp.576-590
    • /
    • 1996
  • Advanced countries such as the USA and Japan are eagerly seeking ways to improve health and welfare of the elderly. One of the services is home health care service using the telephone. Various types of services using the telephone have been developed, improved and are being utilized ranging from the basic consulting to emergency response systems in the area of health care for the elderly. A demonstration project was launched to study the feasibility of a consulting system and telemedicine for the elderly using the public phone system in Korea. For this project, a gathering site for the elderly was selected and those who visited this place were interviewed to find out what kinds of services they wanted and what kind of system they needed to provide the required services. Based on the users' requests and the surrounding environment, a telephone consulting facility was established at the Research Institute of Nursing Science at Seoul National University and consulting personnel was recruited, trained and posted at the center. An Application program for home health care nurses to use when they visited the patients at their homes was developed. This system operates on a notebook Computer and allows nurses to communicate with a doctor at a local hospital through a modem and telecommunication line. These systems were implemented for three months and problems which developed during operation of the systems were identified and progressively modified. Through system evaluation, it was found that a consulting system using phone service will be an invaluable system for the welfare of the elderly in the future. But in order to meet the elderly's need, more services than mere consultation are needed. That is, communication with physicians and hospitals are needed. Thus, when there is any need for physicians' attention, physicians or hospitals should be contacted directly. Similarly for telemedicine, when the home health care nurse visits elderly patients she can assess the patient's problem and provide nursing care, access a physician or hospital to refer her patient to or consult directly using the telecommunication the system. The above mentioned system is a basic form of futuristic telemedicine for the elderly and those who have chronic disease problems. This kind of system will be of great value when it is used on the national information super-highways in the future. In order to get to that stage, of course, this project needs great improvement in the technical, academic, and legal aspects.

  • PDF

Design of Ground Station System for CubeSat STEP Cube Lab. (큐브위성 STEP Cube Lab.의 지상국 시스템 개발)

  • Jeon, Younghyeon;Chae, Bonggeon;Jeong, Hyeonmo;Jeon, Seongyong;Oh, Hyunung
    • Journal of Aerospace System Engineering
    • /
    • v.9 no.4
    • /
    • pp.37-42
    • /
    • 2015
  • The CubeSats is classified as a pico-class satellite which requires a ground station to track the satellite, transmit commands, and receive an on-orbit data such as SOH (State-of-Health) and mission data according to the operation plan. In order to this, the ground station system has to be properly designed to perform a communication to with the satellite with enough up- and down-link budgets. In this study, a conceptual design of the ground station has been performed for the CubeSat named as STEP Cube Lab. (Cube Laboratory for Space Technology Experimental Project). The paper includes a ground station hardware interface design, a link budget analysis and a ground station software realization. In addition, the operation plan of the ground station has been established considering the STEP Cube Lab. mission requirements.

A Study on Grounding Technology for the Reduction of Electric Surge in IBS Building (IBS 빌딩에서의 서어지 저감을 위한 접지방안 연구)

  • 박중양;김학련;최규형
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2003.11a
    • /
    • pp.87-92
    • /
    • 2003
  • According to the realization of highly information dependent society, the recent building system is developed into the concept of suitable for management of intellegent work, which is demanded to unify of IBS(Intelligent Building System), IC(information communication), OA(office automation), BA(building automation) system and computer technology. However inspite of the presence arrester, cable shielding, insulated TR, filter, earth etc., in the IBS building for the cope with several surge and noise has several problems from the wrong operation of the equipment which caused from several surge, damage of equipment, and noise etc. And the miss operation caused by wrong earth works, which must be considered at first during the building construction. In order to minimize these problems, it's necessary that various earth project are performed effectively, and bonding methods between the mutual wiring of earth system and the equipments in the building should be improved sucessively. So in this paper, we analyze present domestic conditions of the earth technology in IBS building, and propose minimization method for the various surge and noise problem, and examine and analyze through the applied works.

  • PDF

Lifting Load Recording and Management Method of the Lift for Construction Based Sensing Information

  • Taekyu Ko;Joonghwan Shin;Kyuhyup Lee;Soonwook Kwon;Chung-Suk Cho;Suwan Chung;Goeun ,Choi
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.125-135
    • /
    • 2022
  • While buildings in recent days become taller and larger, many problems occur during the management of construction. Particularly, as the vertical movement of manpower and materials during construction has become longer while the lifting frequency and load increase, the need for a good lifting management practice is also increasing. Therefore, this study presents a real-time lifting performance monitoring system that can store and manage lifting records for construction management. Through review of literature and preceding studies related to construction lift, the concept of lift planning and operation management was understood, leading to the development of a system to monitor lifting operation and performance information. This system enabled quick measurement of the lifting performance during construction phase while responding to changes in the project schedule. To verify this system, a case study was conducted in which the current status and characteristics of the sensing-based lifting performance were derived.

Performance Analysis of W-CDMA Systems Using 3GPP Physical-Layer Simulator design (3GPP 물리계층 시뮬레이터 설계를 이용한 W-CDMA 시스템 성능 분석)

  • 나인학;윤성재;김병기;우연식;김철성
    • Proceedings of the IEEK Conference
    • /
    • 2001.09a
    • /
    • pp.963-966
    • /
    • 2001
  • The wideband DS-CDMA (W-CDMA) system is one of the candidates for the next generation mobile communication system known as IMT-2000. The important concept of W-CDMA is the introduction of intercell asynchronous operation. In this paper, we design and analyze the system level simulator for the International Mobile Tele communication - 2000 (IMT-2000) 3-rd generation partnership project (3GPP) system. We confirm how the simulator works by BER over different Eb/NO. This study will be expected to use as reference data in the development of asynchronous IMT-2000. In this paper, we analyze a physical layer of W-CDMA system and design a transmitter and receiver by using ADS (Advanced Design System). Also, we simulated a link level performance in Rayleigh fading channel environment. This study will be useful in the analysis and design of W-CDMA system.

  • PDF

Technology development on automatic changeover system in neutral section with energized condition of electric railway catenary system (절연구간 무접점 자동 전원절체 통과시스템 기술개발)

  • Hong, Hyun-Pyo;Han, Moon-Seob;Seo, Myung-Seok;Shin, Myong-Cheol;Yoon, Yong-Han;Kim, Jae-Chul
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.498-506
    • /
    • 2010
  • The neutral section was installed in order to prevent conflict with different phase angle source in electric railway catenary system. The speed of electric train reduced due to coasting operation by notch off when it passed the neutral section. And, the catenary wire was damaged and the accident might be happened because of the arc generation when the electric train passed the neutral section with notch on condition. This project has a goal to develop the automatic changeover system using by noncontactless semiconductor device in neutral section of catenary system so that the train pass as notch-on condition. In this first year, we obtain as following results such as domestic and international systems applications and completion requirements, development and analysis of stability for automatic changeover system, design of static switching device on automatic changeover system in neutral section and drawing up interface design and specifications according to equipment.

  • PDF

Study on Regenerative Energy Storage System in K-AGT Test Track (경량전철 시험선에서의 에너지저장시스템 연구)

  • Cho, Hong-Shik;Ryu, Sang-Hwan;Hwang, Hyeon-Chyeol;Lee, An-Ho;Kim, Gil-Dong;Lee, Han-Min
    • Proceedings of the KIEE Conference
    • /
    • 2008.10c
    • /
    • pp.208-210
    • /
    • 2008
  • LRT System Application Project is performed for the purpose of technical advancement and stabilization of K-AGT system from the viewpoint of practical use and commercialization. For those purpose, the performance test and evaluation procedure for K-AGT signaling system are developed, and the scheme of verifying the performance and function of signaling system under multi-train and driverless control environment is being conducted. For the multi-train operation in K-AGT test track, we applied the regenerative energy storage system in addition to the existing electric facilities. This paper present the design, manufacturing, and testing results of regenerative energy storage system.

  • PDF

An Engineering Design of On-Board Computer System (차상제어시스템 엔지니어링 설계)

  • Lee, Joo-Hoon;Lee, Jae-Duck;Cho, Chang-Hee;Park, Doh-Young;Kim, Kook-Hun;Kim, Yong-Joo
    • Proceedings of the KIEE Conference
    • /
    • 2000.07b
    • /
    • pp.1433-1435
    • /
    • 2000
  • Currently KERI is participating a project whose goal is to develop the Korean High-Speed Train(KHST) with maximum speed of 350kph. KERI's responsibility is the electrical system engineering that includes engineering design of an on-board computer system for diagnosis and control of train set and electrical/mechanical devices. A system engineering approach of the design is performed in order to guarantee the passenger safety and economically viable train for on-board control system construction, operation and maintenance. This paper presents the draft engineering des on-board computer system that ensures the s and reliability of KHST. The draft is focuse network interfaced distributed processing system.

  • PDF

Application of Regenerative Energy Storage System to K-AGT Test Track (회생에너지저장시스템의 경량전철 시험선 적용)

  • Cho, Hong-Shik;Lee, Ho-Yong;Cho, Bong-Kwan;Hong, Jai-Sung;Lee, Eun-Kyu;Kim, Hyung-Chul
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.325-330
    • /
    • 2008
  • LRT System Application Project is performed for the purpose of technical advancement and stabilization of K-AGT system from the viewpoint of practical use and commercialization. For those purpose, the performance test and evaluation procedure for K-AGT signaling system are developed, and the scheme of verifying the performance and function of signaling system under multi-train and driverless control environment is being conducted. For the multi-train operation in K-AGT test track, we applied the regenerative energy storage system in addition to the existing electric facilities. This paper present the design, manufacturing, and testing results of regenerative energy storage system.

  • PDF