• Title/Summary/Keyword: Project Manager

Search Result 376, Processing Time 0.035 seconds

Development of Building Monitoring Techniques Using Augmented Reality (증강현실을 이용한 건물 모니터링 기법 개발)

  • Jeong, Seong-Su;Heo, Joon;Woo, Sun-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.3-12
    • /
    • 2009
  • In order to effectively distribute the resources, it is very critical to understand the status or progress of construction site quickly and accurately. Augmented Reality (AR) can provide this situation with information which is convenient and intuitive. Conventional implementation of AR in outdoor or construction site condition requires additional sensors or markers to track the position and direction of camera. This research is aimed to develop the technologies which can be utilized in gathering the information of constructing or constructed buildings and structures. The AR technique that does not require additional devices except for the camera was implemented to simplify the system and improve utility in inaccessible area. In order to do so, the position of camera's perspective center and direction of camera was estimated using exterior orientation techniques. And 3D drawing model of building was projected and overlapped using this information. The result shows that by using this technique, the virtual drawing image was registered on real image with few pixels of error. The technique and procedure introduced in this paper simplifies the hardware organization of AR system that makes it easier for the AR technology to be utilized with ease in construction site. Moreover, this technique will help the AR to be utilized even in inaccessible areas. In addition to this, it is expected that combining this technique and 4D CAD technology can provide the project manager with more intuitive and comprehensive information that simplifies the monitoring work of construction progress and planning.

Real-Time Construction Resource Monitoring using RFID/USN Inter-working System (RFID/USN 연동 시스템을 활용한 건설자원 실시간 모니터링 시스템)

  • Ryu, Jeoung-Pil;Kim, Hyoung-Kwan;Kim, Chang-Yoon;Kim, Chang-Wan;Han, Seung-Heon;Kim, Moon-Kyum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.90-94
    • /
    • 2007
  • Location tracking automation of resources in construction industry is one of the most important procedures to improve construction project performance and reduce the period of construction. Recently, location tracking technologies have proven to be effective in tracking construction materials and equipment in real time through the instrumentality of RFID (Radio Frequency Identification). By using wireless communication and inter-working system between RFID and USN, it is possible that construction engineers receive the location information of construction resources without additional efforts that move the RFID reader to read tags periodically. In the inter-working system, RFID reader delivers the acquired materials information to sensor node which is connected by serial interface. Then sensor node transmits the received data to the data aggregation terminal that is a sink node. The data aggregation terminal can transmit collected data to construction manager who is out of construction site using infrastructure such as CDMA(Code Division Multiple Access) network. The combination model of the two system and field test scenarios are presented in this paper.

  • PDF

Automated Construction Progress Management Using Computer Vision-based CNN Model and BIM (이미지 기반 기계 학습과 BIM을 활용한 자동화된 시공 진도 관리 - 합성곱 신경망 모델(CNN)과 실내측위기술, 4D BIM을 기반으로 -)

  • Rho, Juhee;Park, Moonseo;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.11-19
    • /
    • 2020
  • A daily progress monitoring and further schedule management of a construction project have a significant impact on the construction manager's decision making in schedule change and controlling field operation. However, a current site monitoring method highly relies on the manually recorded daily-log book by the person in charge of the work. For this reason, it is difficult to take a detached view and sometimes human error such as omission of contents may occur. In order to resolve these problems, previous researches have developed automated site monitoring method with the object recognition-based visualization or BIM data creation. Despite of the research results along with the related technology development, there are limitations in application targeting the practical construction projects due to the constraints in the experimental methods that assume the fixed equipment at a specific location. To overcome these limitations, some smart devices carried by the field workers can be employed as a medium for data creation. Specifically, the extracted information from the site picture by object recognition technology of CNN model, and positional information by GIPS are applied to update 4D BIM data. A standard CNN model is developed and BIM data modification experiments are conducted with the collected data to validate the research suggestion. Based on the experimental results, it is confirmed that the methods and performance are applicable to the construction site management and further it is expected to contribute speedy and precise data creation with the application of automated progress monitoring methods.

Stakeholder Perception on the Transplanting Damaged Trees (훼손 수목 이식에 대한 이해관계자 인식 연구)

  • Moon, Yoonjung;Park, Hongjun;Cha, Jaegyu;Na, Jinjoo;Lee, Seonmi
    • Journal of Environmental Impact Assessment
    • /
    • v.30 no.6
    • /
    • pp.361-379
    • /
    • 2021
  • About 10% of trees damaged by the development projects are to be transplanted when conducting the Environmental Impact Assessment. However, various problems have been raised during transplantation. In this study, we confirm the stakeholder's perceptions of the problems that occur during transplantation. The survey was conducted from October 9 to 25, 2020. Among the stakeholder groups, 36 respondents participated in the consulting institute group, 44 from the review institute group, and 83 from the developer·agency group (total of 163). All three groups responded that it was necessary to transplant some of the damaged trees even if the development charge increased because the damage caused by the development project was serious. The most serious problem was 'high mortality'. The response rate was high that all three groups should plant the same species with the same quantity as an alternative method in case of withering. In order to reduce the mortality rate, small-sized trees were transplanted and transplanted trees were expanded to include planted species and landscape trees. In addition, the number of transplanted trees was high in response to calculating the transplantratio to the number of native tree damaged. The percentage of respondents who said that it was necessary to allocate a separate manager was also high. The results will be used as basic data to improve problems that occur during transplantation of damaged trees.

Possibility of Risk Accidents and Response Strategies for Participants in Agencies in Charge of Employment for the Elderly: Focusing on occupational risk accidents and COVID-19 risk accidents (노인일자리 전담기관 참여자의 위험사고 발생가능성과 대응 전략: 업무상 위험사고와 코로나-19 위험사고를 중심으로)

  • Park, Jae-Young;Youn, Ki-Hyok;Lee, Jin-Yeol
    • Journal of Internet of Things and Convergence
    • /
    • v.8 no.6
    • /
    • pp.65-73
    • /
    • 2022
  • This study identified the level of awareness of dangerous accidents by empirically analyzing the possibility of hazardous accidents at work and the possibility of dangerous accidents due to COVID-19 targeting the participating seniors who are active in the Senior Club, an organization dedicated to job placement for the elderly. The purpose of this study is to provide basic data for preparing measures to improve risk accidents that may occur in organizations in charge of job placement for the elderly and to suggest countermeasures to prevent dangerous accidents. For this purpose, data were collected from the elderly participating in 16 senior clubs in Busan, and 425 of the collected 430 were ultimately used. As a result of this study, first, it was found that the elderly who participated in a job-dedicated institution for the elderly generally perceived the possibility of occupational risk accidents and risk factors due to COVID-19 to be low. Second, it was found that there was a statistically significant difference in the probability of occurrence of hazardous accidents at work according to demographic characteristics during the participation period, and the probability of occurrence of dangerous accidents with COVID-19 was found to have statistically significant differences in the classification and age of the participating elderly. Based on the results of this study, the project manager suggested creating a safety accident management record sheet, preparing a risk management manual, and establishing a risk management system reflecting the individual characteristics of the participants.

A Study on the Legal Liabilities of Contractor as a Delay in the Product Delivery on the Offshore Plant Construction Contract (해양플랜트공사계약상 제조물인도지연에 따른 당사자의 법적 책임에 관한 고찰)

  • Jin, Ho-Hyun
    • MARITIME LAW REVIEW
    • /
    • v.29 no.2
    • /
    • pp.115-144
    • /
    • 2017
  • The impact of the global financial crisis, which began in the United States in 2007, had a major impact on the domestic shipping and shipbuilding industries. In this regard, the domestic shipyard has established an order-taking strategy in several ways as an alternative to lowering the amount of construction of commercial vessels due to deterioration of the shipping industry, and selected industrial sector was the offshore plant sector. However, the domestic shipyard has under performed the offshore plant in order to just increase sales and secure work without any risk analysis for EPC contracts. As a result, the shipyard has been charged more than the initial contract price with the offshore plant contractor, or the shipyard has become a legal issue requiring payment of liquidated damages due to delays in delivery of the product. The main legal disputes are caused by the thorough risk analysis and the inexperience of process control that can occur during offshore plant construction. and In particular, there is no sufficient review of the unequivocal provisions in the contract as an element of risk management. There is no human resource to review these contractual clauses. Therefore, this study identifies the existence of specific risks that could lead to delays in offshore plant construction, and examined the existence of any unequivocal clauses in contracts for offshore plant construction. and also discussed how the toxic clause applies to the actual parties and how the concrete risk factors in the construction contracts are transferred and expressed by referring to the interviews with the project manager of the domestic shipyard and the previous research. As a result, This paper examined the legal liability of the contracting parties regarding delayed delivery of the products due to the offshore plant construction contract. And to improve the domestic shipbuilding industry.

Research on Innovation in the Way of Working of Local Governments (지방자치단체의 일하는 방식 혁신에 관한 연구)

  • Lee, Hyangsoo;Lee, Seong-Hoon;Jung, Yonghun
    • Journal of Digital Convergence
    • /
    • v.18 no.12
    • /
    • pp.21-28
    • /
    • 2020
  • In this study, we reviewed the main strategies and contents of the work style innovation promoted by the Moon Jae-in government, and analyzed the contents and success factors of the work innovation based on the case of a specific local government. In particular, this study analyzes the case of innovation in the way of working through simplification of work, and the local governments, which were the subject of the study, received excellent evaluation in the government innovation evaluation of the Ministry of Public Administration and Security in 2019. In this study, we conducted in-depth interviews with employees of local governments to examine the problems, achievements, and success factors related to business simplification. First, it was found that it is very important to form consensus so that the members of the organization can participate in the change in order to simplify the task. Second, incentives, such as HR, were needed to induce active participation of members in the innovation project called Simplification of Work. Third, in order to induce and support organizational change, it was found that the interest and support of middle managers and directors were the most important factors. The results of this study will help to prepare the policy for innovation in the public sector's working style.

Problems and Solutions of Matrix Organization Structure: Focusing on the Case of H-Corp. Research Institute (매트릭스 조직구조의 문제점과 해결 방안: H사 연구소 사례를 중심으로)

  • Bok, Cheol-Kyu;Lee, Joo-Heon
    • Journal of Industrial Convergence
    • /
    • v.19 no.3
    • /
    • pp.1-12
    • /
    • 2021
  • Even though there have been so much practical interests in industry, the relevant empirical researches are not sufficient. In this study, we try to identify the problems of matrix organization structure in the semiconductor industry and make suggestions for improvements. Also, we try to find out whether there are differences in the perceptions of the problems among ranks and teams. This study was conducted to the researchers in the matrix organization structure of the H-corp. research institute. The problems we found are as follows. The researchers agreed that the matrix organization structure is appropriate when highly professional members for the development of next-generation semiconductors are participated in the projects. They showed strong wills to participate and succeed in projects. However, the researchers felt that the equipments and manpowers were not enough and too much tasks and workloads were assigned to both the managers and members Also, in an open ended question, the researchers pointed out the problems of the matrix organization structure such as 'weak project manager's authority', 'communication and teamwork issues', 'non-obvious work priorities', 'compensation and benefit system', 'lack of research manpower and equipment'. From the strengths and weaknesses of the matrix organization structure of the semiconductor industry, we provide some suggestions for improvements.

A Planning Framework of BIM-based Work-Type Packaging for Educational Facility Maintenance (교육시설 유지관리 BIM 기반 공종 패키지 플래닝 프레임워크)

  • Bae, Chang-Joon;Park, Sang-Hun;Yoon, Sun-Jae;Lee, Mi-Young;Koo, Kyo-jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.12
    • /
    • pp.200-210
    • /
    • 2020
  • The maintenance of educational facilities was assembled in 12 project classifications of the Educational Improvement Program. The priorities were decided by the evaluation scores derived from the condition investigation, and maintenance works were budgeted in the order of priorities. These priorities were a schedule for conducting maintenance and an important criterion for obtaining a construction order. Several restrictions in the condition investigation exist, which derives budgets and conducts maintenance separately based on the priorities. An educational facility manager has a restriction in quantity take-off, which results in an incorrect budget. Discomfort would occur in an educational environment, and a period of infringing safety would increase. This study proposes applying a BIM in the condition investigation and the planning framework for work-type packaging. A BIM supports a budget calculation and derives evaluation scores by linking a repair and an inspection result. The work-type packaging algorithm divides a budget allocation range and derives the result of a grouped work-types applied in an equivalent space and element. As a result of applying cases, it could shorten the duration by approximately 37.4%. Its usability in selecting a grouped work-type was evaluated through an assessment with workers.

A Study on Displacement Measurement Hardware of Retaining Walls based on Laser Sensor for Small and Medium-sized Urban Construction Sites

  • Kim, Jun-Sang;Kim, Jung-Yeol;Kim, Young-Suk
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1250-1251
    • /
    • 2022
  • Measuring management is an important part of preventing the collapse of retaining walls in advance by evaluating their stability with a variety of measuring instruments. The current work of measuring management requires considerable human and material resources since measurement companies need to install measuring instruments at various places on the retaining wall and visit the construction site to collect measurement data and evaluate the stability of the retaining wall. It was investigated that the applicability of the current work of measuring management is poor at small and medium-sized urban construction sites(excavation depth<10m) where measuring management is not essential. Therefore, the purpose of this study is to develop a laser sensor-based hardware to support the wall displacement measurements and their control software applicable to small and medium-sized urban construction sites. The 2D lidar sensor, which is more economical than a 3D laser scanner, is applied as element technology. Additionally, the hardware is mounted on the corner strut of the retaining wall, and it collects point cloud data of the retaining wall by rotating the 2D lidar sensor 360° through a servo motor. Point cloud data collected from the hardware can be transmitted through Wi-Fi to a displacement analysis device (notebook). The hardware control software is designed to control the 2D lidar sensor and servo motor in the displacement analysis device by remote access. The process of analyzing the displacement of a retaining wall using the developed hardware and software is as follows: the construction site manager uses the displacement analysis device to 1)collect the initial point cloud data, and after a certain period 2)comparative point cloud data is collected, and 3)the distance between the initial point and comparison point cloud data is calculated in order. As a result of performing an indoor experiment, the analyses show that a displacement of approximately 15 mm can be identified. In the future, the integrated system of the hardware designed here, and the displacement analysis software to be developed can be applied to small and medium-sized urban construction sites through several field experiments. Therefore, effective management of the displacement of the retaining wall is possible in comparison with the current measuring management work in terms of ease of installation, dismantlement, displacement measurement, and economic feasibility.

  • PDF