• Title/Summary/Keyword: Project Manager

Search Result 378, Processing Time 0.02 seconds

A Reservation based Network Resource Provisioning Testbed Using the Integrated Resource Management System (통합자원관리시스템을 이용한 예약 기반의 네트워크 자원 할당 테스트베드 망)

  • Lim, Huhn-Kuk;Moon, Jeong-Hoon;Kong, Jong-Uk;Han, Jang-Soo;Cha, Young-Wook
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.36 no.12B
    • /
    • pp.1450-1458
    • /
    • 2011
  • The HPcN (Hybrid & high Performance Convergence Network) in research networks means environment which can provide both computing resource such as supercomputer, cluster and network resource to application researchers in the field of medical, bio, aerospace and e-science. The most representative research network in Korea, KREONET has been developing following technologies through the HERO (Hybrid Networking project for research oriented infrastructure) from 200S. First, we have constructed and deployed a control plane technology which can provide a connection oriented network dynamically. Second, the integrated resource management system technology has been developing for reservation and allocation of both computing and network resources, whenever users want to utilize them. In this paper, a testbed network is presented, which is possible to reserve and allocate network resource using the integrated resource management system. We reserve network resource through GNSI (Grid Network Service Interface) messages between GRS (Global Resource Scheduler) and NRM (Network Resource Manager) and allocate network resource through GUNI (Grid User Network Interface) messages between the NRM (network resource manager) and routers, based on reservation information provided from a user on the web portal. It is confirmed that GUNI interface messages are delivered from the NRM to each router at the starting of reservation time and traffic is transmitted through LSP allocated by the NRM.

A Study for Implementing of National GIS Training Program : Analysis of the Results for the First Year (국가 GIS 전문인력양성 활성화 연구 : 1차년도 결과를 중심으로 고찰)

  • Lee, Ho-Geun;Lee, Ki-Won;Lee, Jong-Hun;Yang, Young-Kyu
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.5 no.1 s.9
    • /
    • pp.147-157
    • /
    • 1997
  • A national program for GIS Training had been established by a feasibility study which was performed during the period of from July, 1995 through April, 1996 initiated by Ministry of Science and Technology (MOST). Systems Engineering Research Institute (SERI), one of government-supported institutes in the fields of software development, have taken in charge of Korean GIS training program with emphases on short courses since July, 1996. To distinguish these national programs from those of major commercial GIS software vendor, GIS training programs by executing staffs within SERE have been established with the basis of its own educational paradigm; therefore, they was composed of several specific training curricular developed by executing staffs. In this paper, the practical aspects during execution and progress of these programs are described, and all courses named after decision maker course, GIS manager course, and user course in the first year of GIS training program are evaluated with questionnaire result riven to the trainees. As results, the satisfaction-rate after the decision maker, the GIS manager, and the user course is 84.8%, 81.2%, and 66.7% respectively These whole results are shown as more affirmative ones than expected, and each result, as a kind of feedback of this executing program, plays an important role to flourish Korean GIS training project in future.

  • PDF

INTEGRATED WATER RESOURCES AND QUALITY MANAGEMENT SYSTEM USING GIS/RS TECHNOLOGIES

  • Shim, Kyu-Cheoul;Shim, Soon-Bo;Lee, Yo-Sang
    • Water Engineering Research
    • /
    • v.3 no.2
    • /
    • pp.85-92
    • /
    • 2002
  • There has been continuous efforts to manage water resources for the required water quality criterion at river channel in Korea. However, we could obtain the partial improvement only for the point sources such as, waste waters from urban and factory site through the water quality management. Therefore, it is strongly needed that the best management practice throughout the river basin fur water quality management including non-point sources pollutant loads. This problem should be resolved by recognizing the non-point sources pollutant loads from the upstream river basin to the outlet of the basin depends on the landuse and soil type characteristics of the river basin using the computer simulation by a distributed model based on the detailed investigation and application of Geographic Information System (GIS). The purpose of this study is consisted of the three major distributions, which are the investigation of spread non-point sources pollutants throughout the river basin, development of the base maps to represent and interpret the input and outputs of the distributed simulation model, and prediction of non-point sources pollutant loads at the outlet of a up-stream river basin using Agricultural Non-Point Sources Model (AGNPS). For the validation purpose, the Seom-Jin River basin was selected with two flood events in 1998. The results of this application showed that the use of combined a distributed model and an application of GIS was very effective fur the best water resources and quality management practice throughout the river basin

  • PDF

Applying Lean, Green, and Six-Sigma Framework to Improve Exterior Construction Process in Saudi Arabia

  • Banawi, Abdul-Aziz;Bilec, Melissa
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.2
    • /
    • pp.12-22
    • /
    • 2014
  • Over the last decade, Saudi Arabia has experienced significant economic increases as evidenced by the 30% growth in its gross domestic product; furthermore, the construction industry has increased 10% in the same time period. Due to this significant growth, the construction industry is encountering issues related to construction quality resulting in significant waste and associated environmental impacts. In this research, we applied our previously developed framework that integrates three different methods-Lean, Green, and Six-sigma - to a residential construction complex in Saudi Arabia. Our aim of this case study was to explore the application of the framework in practice to glean quantitative results and further validate the framework. In the case study, we used the developed framework to identify a significant issue related to quality and delays - final completion of 53 residential units was delayed because of failed exterior buildings surfaces. We then used the framework to define the causes behind the defects via a field investigation of the 53 units. Of the defect, construction execution was responsible for 43% of the defect, 31% untrained workers, 19% unfavorable construction weather condition, with 7% accounting for other issues. A procedure was developed in concert with the construction manager and overall developer reducing the amount of rework and waste causes revealed by the field examination and the framework. Although two steps were added to the original construction process to overcome waste causes, still save a lot of resources and reduces environmental impact. In summary, we found that the Lean, Green, Six-sigma framework increased productivity, quality, and reduced waste.

Development of Time-Cost Trade-Off model Based on Emergency Construction Work Scenario (돌관공사 시나리오 기반 공기-비용 최적화 모델 개발)

  • Lee, Sihyun;Lee, Seounghyun;Son, Jaeho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.43-51
    • /
    • 2016
  • Recently, the cost of construction projects has escalated due to a significant increase in size and complexity. Many construction projects have failed to meet their originally intended project deadline due to various factors such as weather, labor supply, equipment, procurement, accidents, etc. Consequently, emergency construction work scenario has to be implemented in order to shorten the duration and satisfy the original estimated schedule. However, many critical decisions in emergency scenario rely solely on the experience of a construction manager. Thus, this paper proposes TCTO optimization model to decide the most effective alternative out of various working scenarios which are generated by the combination of work group and work time. The developed TCTO model provides the optimum schedule that satisfies the practical constraints. Future research could involve the integration of resource leveling with the proposed model. This would make the model more versatile.

Design Planning of Group-Home for the elderly in Rural Area (농촌형 고령자 그룹홈의 사례와 제안)

  • Nam, Yun-Cheol
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.17 no.4
    • /
    • pp.75-82
    • /
    • 2015
  • The elderly rate in South Korea in 2015 is over 13.1%. Especially, the elderly rate in rural area is high. Senior community project in rural that is being promoted by the government. This study's purpose is to provide the reserch group-home for the elderly in Japan rural area. And this paper provided planning of group-home for the elderly in Korea rural area. For this study, respective 5senior housing of Korea and Japan were chosen as respresenting two nations, and every manager was interviewed on housing pattern. This study suggests the planning material as following. First, the effectiveness of the group-home are big. Especially, the elderly was far healthier. Design point is public space(living room, small living room, etc). Maybe, healthy group-home concept is that would be design by Korean traditional housing. Also important public space design is that would be inner courtyard-house, wood floor, Deachong, etc. Two group-homes will construct elderly welfare facilities in between. Otherwise that is need layout of a big public space. In the case of vacant house can used by considering of scale, structure, site condition. Closed school can used through so easy remodeling too. More often than not complex type(hospital, community heath center) was appeared in Japan rural area. In the case of Korea, recommend complex type in community health center and public building. In this case, considering communication, access, contact, group-home keeps on ground floor. In this paper, we hope to take a lesson from group-home planning source for the elderly in Korea rural area.

Analysis of Cognition Characteristic for Operators' Roles in Mountain Eco Villages - focused on an improvement of empowerment training - (산촌생태마을 운영매니저의 역할에 대한 인식 특성 분석 - 역량강화교육 개선을 중심으로 -)

  • Kim, Seong-Hak;Seo, Jeong-Weon
    • Journal of Korean Society of Rural Planning
    • /
    • v.19 no.2
    • /
    • pp.173-181
    • /
    • 2013
  • The importance of human resources empowerment for operation and management is increasing for sustainable effects and improvement in mountain eco village development projects. This study aimed to understand the cognition characteristics of operator who works for mountain eco villages as part of the mountain village development and to suggest improvement methods in empowerment training aspects. The survey contained operator's empowerment and operator systems in mountain eco villages and the results were analyzed for the study. Operators who joined the mountain eco village operator training course by Korea Forest Service were conducted the survey on March 12th~13th in 2012 and March 13th~15th in 2013. 69 and 58 of questionnaires were collected respectively and analyzed for the study. T-test was applied to Intergroup cognition difference and regression analysis was used for influential factors in necessity of operator's role. Collected data was analyzed by statistical package programme SPSS 18.0 version. According to the comparison of empowerment cognition with contingent upon training experience, 'harmony with residents' showed significantly difference at p<0.05 level. In the recognition comparison for prospect of future mountain eco village development, 'various training experiences' was significantly difference at p<0.01 level between positive and negative prospect group. Regression analysis revealed that 'communication with village leader', 'harmony with residents', and 'idea related to the project' have an effect on necessity of operator's empowerment significantly. Based on the results, the study suggests improved directions for operator's empowerment training as a horizontal leader who conduces a mountain village.

The Task and Role of the Quality Improvement Facilitator (QI전담자의 주요 업무 및 역할 규명)

  • Kim, Moon-sook;Kim, Hyun-ah;Kim, Yoon-sook
    • Quality Improvement in Health Care
    • /
    • v.21 no.2
    • /
    • pp.40-56
    • /
    • 2015
  • Objectives: To outline overall duties of quality improvement (QI) performers within a health care organization, thus describing their key tasks, including task element-related frequency, importance and difficulty in enough detail. Methods: A DACUM (Developing A CurriculUM) workshop took place to outline overall job activities of QI performers. To examine the scope of their duty and task, we performed a questionnaire survey of 338 QI performers from 111 hospitals. Results: The results of our survey showed that for the task assigned to each QI performer, there were 10 duties, 31 tasks and 119 task elements. Respondents cited a project planning as the most frequent/important duty, and a research was the highest level of difficulty in their duty. They also said that the most frequent task was index management, the most important task was a business plan, and the highest level of difficulty was a practical application of QI research. QI performers added that the most frequent task element was receipt of patient safety reporting in patient safety system, the most important task element was an analysis for patient safety and its improvement, and the highest level of difficulty was a regional influence analysis related to the patient safety and its improvement. Conclusion: To ensure that QI performers play a pivotal role as a manager to better improve patient safety and the quality of health care services, proper training program for them should be developed by reflecting the results of our study.

A Study on Safety Inspection Model for Small Scale Construction Field (중.소규모 건설현장 안전점검 모질 연구)

  • 안병수;양광모;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.3 no.3
    • /
    • pp.11-21
    • /
    • 2001
  • Domestic construction industry has considerable level of construction performance and technology thanks to the economic development and as the result of performing diverse oversea construction project. However, construction disasters have been steadily increasing, and do severe disasters at faster pace. Most of such disasters happen at small and small medium-sized construction fields, which contract size is less than 10 billion won. small and medium-sized construction fields are not obliged to designate a safety manager, and have limitations in engaging self-regulating disaster prevention activities due to reduced budget for safety facilities. For the small and medium-sized construction sites with less than 10 billion won, the Ministry of Labor has been carrying out mobile inspections of construction safety. However, the effect so far is insignificant and an improvement plan is required. Therefore, in the present thesis, we derive problems appearing in the current construction safety mobile inspection system, investigate and study systems in foreign countries, and suggest an efficient and effective plan to operate safety technology inspections. First of all, we establish a standard to select sites to be inspected that are high in construction risk and disaster occurrence probability In addition, we suggest a plan to take administrative and judiciary measures based on the total score for disaster factors considering the disaster occurrence probability and the illegal practices. Furthermore, a scheme to maximize the effect of disaster prevention is sought by building an organic cooperative system between the Ministry of Labor, Korea Occupational Safety & Health Agency and other organizations specialized in instruction of construction disaster prevention. Finally, we induce a research conclusion that leads to self-regulating safety management through checking and instructing systematic management on mobile inspections.

  • PDF

Positional Accuracy of Road and Underground Utility Information (도로기반시설물정보의 위치정확도에 관한 연구)

  • Park, Hong-Gi;Shin, Dong-Bin
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.10 no.4 s.22
    • /
    • pp.51-60
    • /
    • 2002
  • As the use of GIS becomes more widespread, the quality and source of data is becoming more of a concern among users. But accuracy is a component of quality, and the positional accuracy is a component of total accuracy. If only we consider the positional accuracy, simultaneously collecting technology of location and attribute information, whether it be manually, using conventional surveying method, GPS, or remote sensing, is a practical way of insuring that location and attribute information are correctly correlated. This study analyse the positional accuracy from a view-point of user and supplier, which is the considerations that can ensure quality level and continuously maintain the road and underground utility information. The positional accuracy of road and underground utility information are considered as two categories - expected accuracy of data collection procedure, required accuracy of data usage process. And the project manager must consider the cost/benefit view of data generation in order to determine the surveying method.

  • PDF