• Title/Summary/Keyword: Project Management Remodeling

Search Result 98, Processing Time 0.024 seconds

Policy Direction in Responses to Demand for Apartment Remodeling (공동주택 리모델링 수요에 대응한 정책 추진방안)

  • Lee, Yeo-Kyung;Kim, Eun-Hee
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.36 no.1
    • /
    • pp.125-136
    • /
    • 2020
  • This study aims to seek a proper policy direction in response to the demand for apartment remodeling. As the research methods, we diagnosed the current status of the remodeling policy and analyzed the demand for apartment remodeling nationwide. According to the result of analysis, we suggested the fundamental direction and tasks for remodeling policies to be pursued at the government level. The results of the study are summarized as follows. First, the result of analysis showed that the demand for environmental improvement(performance improvement) remodeling project was much higher than other types of remodeling projects. The percentage of unit increased-type remodeling that can secure business feasibility is about 10% and only 30% when it comes to reducing project costs. The remaining 70-90% need to be promoted in environmental improvement remodeling projects which dependent on the residents' payment. Second, in order to prepare a policy action plan in response to the demand for apartment remodeling, it is necessary to set up clear policy goals and strategies for apartment remodeling in advance at the national level. Along with proactive goals and strategies, graded policy support should be accompanied per type of remodeling and business demand. We also suggest to simplify administrative procedures and support the R&D research to develop technologies. It would help to utilize the unit increased-type remodeling. On the other hand, for utilizing the environmental improvement remodeling which takes up a relatively high proportion, the policy should take care of as follows: offering housing performance information, rationalizing long term repair reserve, fostering small companies and experts. Finally, apartment management system should be advanced from the perspectives of managing old apartments and institutional foundations such as new construction and customized regulations for differentiated remodeling should be accompanied.

A Study on the Story Increase for Securing the Feasibility of Aged-Housing Remodeling (노후공동주택 리모델링의 사업성 확보를 위한 수직증축 제안)

  • Han, Ju-Yeon;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.152-159
    • /
    • 2012
  • Remodeling the existing building structure by recycling has great advantages compared with reconstruction in terms of environmentally contributions and reduced use of national resources. And no matter the existing floor area ratio, extension up to 30% of the exclusive using area and short project period have made remodeling a good alternative to reconstruction. However, the residents of aged housings that were being remodeled are either abandoning the remodeling project and turning to reconstruction. The main reason is remodeling project cannot increase the number of householders. In principal, it is prohibited to increase the number of floors during remodeling due to matters of safety. That is, all remodeling construction costs are borne by the residents, which leads to great financial pressure. Therefore, in order to improve these conditions, the residents' burden of remodeling charges should be reduced, and one of the ways to do so is to increase the number of householders. In this study, there will be suggestions of alternatives, including the story increase during remodeling, and compare the burden of remodeling charges on each of the residents, between proposed alternatives and the current remodeling plans by calculating the construction costs in order to prepare a foundation for a system that will promote remodeling.

A Process Model of Eco-friendly Demolition Work for Wall Type Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 (벽식구조 노후 공동주택을 대상으로))

  • Hwang, Young-Gyu;Kim, Ki-Hyun;Kim, Kyung-Ra;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.204-215
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 개발)

  • Hwang, Young-Gyu;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.85-92
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

  • PDF

An Integrated Environment and Economic Evaluation Model for Building Reconstruction and Remodeling Projects (재건축과 리모델링 사업의 환경성${\cdot}$경제성 통합평가모델)

  • Lee Ju-Heon;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.327-330
    • /
    • 2002
  • Recently, the environmental sustainability has showed up one of the important considerations in the construction industry. However, the effective evaluation method for the decision-making on either reconstruction or remodeling of a project has not been developed so far. This paper presents an integrated evaluation model considering both environment and economic factors of a building project for which the decision making on either remodeling or reconstruction is needed. In order to develop the model, the characteristics of both types of projects were investigated and analyzed through the related literature review, and then appropriate evaluation criteria and analysis methodology to be used in the model were developed.

  • PDF

A Study on the Activation of Green Remodeling to Achieve Carbon Neutrality - Focusing on a case of Gwangmyeong City - (탄소중립 목표 달성을 위한 그린리모델링 활성화 방안에 관한 연구 - 광명시 사례를 중심으로 -)

  • Kim, Gi-Ran;Lee, Ju-hyun;Kim, Kyong Ju;Kim, Kyoungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.12-21
    • /
    • 2023
  • Green remodeling proposed in the Korean New Deal is a project to build or remodel eco-friendly and energy-efficient buildings using renewable energy facilities and high-performance insulation for public buildings. The government intends to achieve the carbon emission reduction target by conducting green remodeling. Major overseas cities that conduct green remodeling are actively promoting technology support and promotion along with energy performance evaluation according to building characteristics, subsidies for private revitalization, and tax benefits. With this background, the analysis of the current status and problems of the green remodeling project was performed and the Activation factors of Green Remodeling were derived from survey results. This study suggested strategic measures such as a participation of civil society, promotion, and priority selection of administration and policy measures such as a leading role of the public sector, expanding support for the socially underprivileged, and financial support and tax benefits. And this study results are expected to be utilized as basic data to promote the green remodeling project.

Improvements in the Business Process Model for the Aged Apartment Remodeling Project - In Case of the Number of Units Increased - (노후 공동주택 세대수 증가형 리모델링의 사업프로세스 개선)

  • Kim, Kyungrai;Yoon, Youngho;Kim, Chunhag
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.45-53
    • /
    • 2016
  • As the number of units increased by vertical extension is recently allowed according to the Housing Law, the aged apartment remodeling projects using the same allowed method are pursued in several apartment complex located in Bundang and Pyungchon. However, progress of the projects is not advanced due to uncertainty of the process. Therefore, the purpose of this study is to improve a business process model for the aged apartment remodeling in case of the number of units are increased for the remodeling union to pursue the remodeling project easily. In order to improve the process model, requirements for the Housing Act are analyzed, the existing process model is developed based upon the requirements, uncertainty of the existing process is examined and a to be process model is proposed to eliminate the uncertainty. Many architects and engineers are consulted to discuss the uncertainty and process model. This model will help the Government to reform the Housing Act and remodeling unions to pursue the aged apartment remodeling.

Decision Support Process Model for Energy Efficient Remodeling Projects focused on Building Envelope and Renewable-energy Systems (에너지절감형 리모델링을 위한 적정 대안 선정 프로세스 모델 - 건축물 외피 및 신재생에너지 시스템을 중심으로 -)

  • Shin, Young-su;Cho, Kyuman;Kim, Jae-youn
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.91-100
    • /
    • 2015
  • An increase in energy such as natural gas, coal, oil, has occurred to a large amounts of environment impact emissions, it is necessary to reduce in the construction industry for the energy consumption. To encourage remodeling project in developed countries of the majority, on the basis of this, remodeling project in the construction industry has grown to a large amount. Results of analysis of the research related to the advanced remodeling, analysis of the economic validity in accordance with the production and process and building elapsed years of selection alternative of remodeling there has been a problem that has not been properly reflected. In this study, a decision support model that can simultaneously choose the most cost-effective and energy-efficiency alternative. Developed process model, generates a "Remodeling Solution" that combines the renewable energy equipment and envelope system, energy performance evaluation of the application of international standards(ISO-13790, DIN V 18599), perform the economic evaluation through LCCA(Life Cycle Cost Analysis) technique, circulated evaluation and configured to output the optimal Remodeling Solution. The results of applying the model developed in the case, it was confirmed that it is possible to select a choice of cost-effective energy-saving alternative. Then, developed model through this study, it is expected to be able to help highly effective remodeling alternative to selecting by decision-makers.

Development of BIM Standard Database System for an Approximate Estimate of Old-Aged Apartment Remodeling Project (노후공동주택 리모델링의 개략견적을 위한 BIM 데이터베이스 구축)

  • Lee, Dong-Gun;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.53-64
    • /
    • 2010
  • Remodeling becomes the significant issue in the aspect of the resource recycling, because it does not demolishes the whole buildings, but a part of main structure. However, compared with new construction, remodeling has several problems of adding the repair and rehabilitation works, using the partial demolition method, and having difficulties of making decision due to disagreement between several owner organizations. BIM, which is the total solution for managing and producing information during whole life cycle of the buildings, seems to be the right solution for the way to address these issues. has a possibility for solving the problems. Therefore this paper provided the framework and database for applying the BIM in the remodeling, and proved the applicability of the BIM database in the remodeling project through the case studies.

Constitution of Work Process for Apartment Renovation Project in Design Phase (공동주택 리모델링 설계단계에서의 사업수행 프로세스 구축)

  • Kwon, Won;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.167-175
    • /
    • 2007
  • A renovation project of apartment housing is generally divided into four stages: Project inquiry stage, planning and feasibility stage, design stage and construction stage. Currently, procedure and managerial technique for a remodeling project has not been systematically established so that many companies have difficulty in doing their business. In particular, the design stage in participant which a project managers, designers, residents and engineers is more complicate than the other stages in terms of roles and working procedure. The design documents can be found trial and error if it is not well managed. The insufficient design caused by lack of ability to efficiently utilize information obtained during the stage and inappropriate decision-making not only results in diverse problems in the construction stage but also makes people suspect satisfaction and reliability on the remodeling improvements. Therefore the design stage is very significant issue on the renovation project. As the consequence, the design stage of a remodeling project is so important that it should be carefully managed, and composite understanding of the process to be executed. To do this, we provide roles and responsibility of each participant in the design stage and analyze the process where information is utilized in design stage. The information is analyzed in terms of input, tool and output.