• Title/Summary/Keyword: Project Management Office

Search Result 244, Processing Time 0.03 seconds

Analysis on Green BIM based Atrium Sizes in the Early Design Stage

  • Jeong, Seung-Woo;Lee, Kweon-Hyoyng;Choo, Seung-Yeon
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.260-266
    • /
    • 2013
  • This study for establishing specific standards of atrium design aims to discuss design of atrium to consider energy performance according to the types of atrium of office building. In order to evaluate a type and a scale of atrium at the early design stage, modeling details of mass design were set as standards of conceptual design. In the experiment, Project Vasari was used to analyze modeling and energy consumption, based on the LOD 100-step suggested by AIA, because there is no guideline to specify a level of modeling details at each design process. From this analysis, the correlation among a simple-typed atrium and scale and energy load was understood, and the followings are the considerations for designing an atrium. First, the single-sided atrium reduced energy the most, and it was followed by three-sided, two-sided, four-sided and continuous-typed ones. On the whole, they could decrease energy by up to about 15%. Also, the atrium with a wide facade facing in the south was more favorable to reduce energy. Second, planning an atria within 10~30% of the whole building area was more energy efficient. Third, rather than the depth, adjusting the length in designing an atrium could reduce cooling and heating loads by 1.5% per 1m. As explained above, energy performance evaluation considering types and planning elements of atrium helps to assess alternatives in a reasonable way. In particular, considering the use of building needs to be preceded to select a type of atrium, although it is also important to consider its planning elements.

  • PDF

Social Capital and Corporate Performance: Evidence from State Capital Enterprises in Vietnam

  • NGO, Chin;NGUYEN, Quyen Le Hoang Thuy To;NGUYEN, Phong Thanh
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.6
    • /
    • pp.409-416
    • /
    • 2020
  • The research has been conducted to explore the combination of three intangible resources, including social capital, entrepreneurship, and resilience capability on the performance of State Capital Enterprises (SCEs) in Vietnam. Both qualitative and quantitative approaches are applied in the study. An in-depth interview of ten CEOs at SCEs in Vietnam was made to explore new indicators for the contextual latent variables in the research models. By employing the data from the authors' survey of 568 SCEs in Vietnam in 2019, using Cronbach's alpha, confirmatory factor analysis (CFA) and path analysis (SEM), the mechanism that social capital impacts on SCE performance has been analyzed. In addition to the direct role, social capital indirectly affects corporate performance through entrepreneurship and resilience capability. It was found that social capital has a larger impact on entrepreneurship than resilience capacity. However, the contribution of resilience capacity to the firm performance is much more than the entrepreneurship's in Vietnamese context. This study enriches the theory by proposing a measurement scale of the contextual latent variables as a result of in-depth interviews with experts using a qualitative analysis technique. In addition, the path analysis findings suggest practical implications for managers to effectively use their resources in SCEs.

A Short-Term Projection of the Government Budget in Medical Expenditures using for the Low-income Handicapped (저소득층 장애인 의료비에 대한 정부부담금 추계)

  • 이선자;김미주;장숙랑;이효영
    • Health Policy and Management
    • /
    • v.13 no.2
    • /
    • pp.125-143
    • /
    • 2003
  • This study was conducted to estimate the future government budget in medical expenditures using for the low-income handicapped, because medical expenditures to the low-income handicapped is escalating in these days. It became a big problem not only to the central-government but also to the district-government because they have to subsidize a part of co-payment. This study was designed to project the future government budget using structural model. For the short-term projection, the structural model is stronger than the regression model. The data used for this study were the population projection data based on National Census Data(2000) of the National Statistical Office, the data of Ministry of Health & Welfare, and the data of National Health Insurance Corporation from November 2m to June 2001. The results of the study are summarized as follows: The future government budget in medical expenditures using to the low-income handicapped will be 15-18 billion Won in the year 2003, 16-23 billion Won in 2004, 18-30 billion Won in 2005, 19-38 billion Won in 2006 and 21-49 billion Won in 2007. It is predicted that they would be increasing rapidly. Therefore, the government budget in medical expenditures using for the low-income handicapped must be enlarged.

Improvement of the Design-Build Bidding in the Domestic Construction Industry (국내 설계시공일괄입찰방식 개선방안)

  • Kim Su-Hyun;Jeon Min-Jeong;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.410-413
    • /
    • 2003
  • In order to build up competitive power in construction market and to cope with international policy, Design-Build bidding is one of the viable bidding system, encouraging collaboration between design office and building construction firm. Design-Build is a promising delivery system to help expediting schedules, saving costs, and improving Quality. However, the problems of Design-Build project in the domestic construction industry are not to be able to take advantages of fast-tracking and value engineering process, because of the problems of inappropriate system and participants' inexperience. The purpose of this study is to suggest alternatives for Design-Build bidding of public sector in the domestic construction industry in the costs, quality and time aspect.

  • PDF

Influence Factor Analysis for Feasibility Study of Building Projects (상업건축물의 사업타당성 영향요인 분석)

  • Son, Ki-Young;Kook, Dong-Hoon;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.462-466
    • /
    • 2006
  • The startingpoint of successful buildingproduction process is the feasibility study of the project. If the feasibility study is poor which is affected in direct production processes such as designing and engineering, it incurs a great unrecoverable loss to the company. The governmentinstitutionalized the feasibility study for projects that budgets over 50billion won in an effort to ensure competitiveness of the construction industry after IMF; however, the system and effort to created systematic studies or guidance preparation for private construction development projects are lacking in great deal. Therefore, the objective of this study is to establish the analysis factors of feasibility study and evaluation standard by systematic analysis in consideration of the changes of various variables and mutual relationships using system dynamics technique for office buildings among commercial buildings.

  • PDF

Critical Factors Affecting Construction Price Index: An Integrated Fuzzy Logic and Analytical Hierarchy Process

  • NGUYEN, Phong Thanh;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.8
    • /
    • pp.197-204
    • /
    • 2020
  • Nowadays, many construction engineering and technology enterprises are evolving to find that prosperity is driven and inspired by an open economy with dynamic markets and fierce multifaceted competition. Besides brand and product uniqueness, the ability to quickly provide customers with quotes are matters of concern. Such a requirement for prompt cost estimation of construction investment projects with the use of a construction price index poses a significant challenge to contractors. This is because the nature of the construction industry is shaped by changes in domestic and foreign economic factors, socio-financial issues, and is under the influence of various micro and macro factors. This paper presents a fuzzy decision-making approach for calculating critical factors that affect the construction price index. A qualitative approach was implemented based on in-depth interviews of experts in the construction industry in Vietnam. A synthetic comparison matrix was calculated using Buckley approach. The CoA approach was applied to defuzzified the fuzzy weights of factors that affect the construction price index. The research results show that the top five critical factors affecting the construction price index in Vietnam are (1) consumer price index, (2) gross domestic product, (3) basic interest rate, (4) foreign exchange rate, and (5) total export and import.

TEMPERATURE CONTROL AND COMPRESSIVE STRENGTH ASSESSMENT OF IN-PLACE CONCRETE STRUCTURES USING THE WIRELESS TEMPERATURE MEASURING SYSTEM BASED ON THE UBIQUITOUS SENSOR NETWORK

  • Ho Kyoo JO;Hyung Rae KIM;Tae Koo KIM
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.794-799
    • /
    • 2009
  • The temperature control of in-place concrete is the most important factor for an early age of curing concrete. Heat stress of mass concrete caused by the heat of hydration can induce the crack of concrete, and a frost damage from cold weather casting concrete results defect on compressive strength and degradation of durability. Therefore, success and failure of concrete work is dependant on the measurement and control of concrete temperature. In addition, the compressive strength assessment of in-place concrete obtained from the maturity calculated from the history of temperature make a reduction of construction cycle time, possible. For that purpose, wireless temperature measuring system was developed to control temperature and assess strength of concrete. And, it was possible to monitor the temperature of concrete over 1km apart from site office and to take a proper measure; mesh-type network was developed for wireless sensor. Furthermore, curing control system that contains the program capable to calculate the maturity of concrete from the history of temperature and to assess the compressive strength of concrete was established. In this study, organization and practical method of developed curing control system are presented; base on in-place application case.

  • PDF

APPLICATION OF WIRELESS INCLINOMETER FOR DISPLACEMENT MEASUREMENT OF TEMPORARY EARTH RETAINING PILE

  • Chi Hun In;Hong Chul Rhim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.218-223
    • /
    • 2009
  • During the process of excavation for substructures of buildings, precise and constant measurements of retaining wall displacement is crucial for construction to be complete and safe. Currently an inclinometer is used to measure displacement around the perimeter of an excavation site. The existing inclinometer system requires an instrument to be placed inside pre-bored holes for each measurement with an typical interval of two weeks. This makes it difficult to obtain continuous displacement data, especially during a critical time such as rainy season in summer. Also, the existing inclinometer is placed at certain distance away from the retaining wall system itself. Thus, exact measurement of retaining wall movement is compromised because of the distance between the retaining wall and the inclinometer. This paper presents the development of wireless inclinometer system for the displacement measurement of retaining walls by being attached directly to the retaining wall. The result of the application of the developed systems are provided with advanced ubiquitous sensor network (USN) system features. The USN technique incorporated into the system enables users to monitor movement data from wherever possible and convenient such as construction manager's office on site or any other places connected through internet. The research work presented in this paper will provide a basis to save construction time and cost by preventing safe-related unexpected delay of construction due to the failure or collapse of retaining walls.

  • PDF

IMPLEMENTATION OF GOVERNMENT E-PROCUREMENT: A COMPARATIVE STUDY OF THAILAND AND INDONESIAN PRACTICES

  • Budi Hasiholan;Shin-ei TAKANO
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.827-834
    • /
    • 2009
  • In respond to the demand of an open, fair, transparent, and efficient environment for procurement, many governments have incorporated the use of internet in their procurement systems with online procurement (e-procurement). Given the different policies and laws which have to be complied with, the practice of government e-procurement system varies from one country to another. Thus, experiences in running e-procurement will vary as well. The achievements and obstacles of one country's experience will be a constructive reference for other countries in establishing e-procurement system. In this regard, government e-procurement system practices in two Southeast Asia countries i.e., Thailand and Indonesia particularly in public works are consecutively presented and finally compared in this paper. The government of Thailand has applied Online Auctions (e-Auctions) as the national procurement practice since 2005 and performed the e-Auctions in two types: Reverse Auction and Sealed Bid Auction. Contrary to the common practice of e-procurement, the Thai government, with some rationales, runs the bid documents obtaining manually as well as qualification and technical documents submission and holding the e-Auctions at bidding office. Whereas Indonesian government runs Online Sealed Bid Bidding (e-Procurement) and most of the bidding stages are performed electronically except bid evaluation for both technical and financial. The advantages and drawbacks of these two e-procurement practices are discussed as well as improvements that have to be made for successful of e-procurement.

  • PDF

Comparing the Operation Cost of Washington Safety Rest Areas with Other States Using Performance-Based Method

  • Shrestha, Kishor;Berg, Alix;Tafazzoli, Mohammadsoroush;Kisi, Krishna
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.640-648
    • /
    • 2022
  • In the United States, the Safety Rest Areas (SRAs) were introduced as highway roadside infrastructures in the early 1900s. The State Departments of Transportation (DOTs) operate/maintain their SRAs using different methods. The Washington DOT used the in-house workforce method for over 20 years, whereas some states moved to Performance-Based Contracting (PBC) from the in-house workforce to save cost primarily. Several existing studies claimed that using the PBC approach saved costs on several highway assets. Thus, the principal objective of this study is to compute and compare the unit operating/maintenance cost of SRAs using the in-house workforce method (in Washington state) with the PBC approach (in other states). The findings of this study show that the average annual cost using the PBC approach was much more than the average annual cost using the in-house workforce approach. The findings also show that in Washington state, the 'Labor Cost' category was a key expenditure, which is statistically higher than other categories. The 'Labor Cost' was followed by the 'Other Services', and then 'Materials and Supplies' and 'Equipment.' The study's findings indicated that outsourcing does not always save costs for agencies. The study findings may help transportation construction/maintenance professionals select a cost-effective approach for their future planning.

  • PDF