• Title/Summary/Keyword: Project Life-cycle

Search Result 479, Processing Time 0.023 seconds

New Environmental Impact Assessment Technology (신환경영향평가기술(新環境影響評價技術)의 개발방향(開發方向))

  • Han, Sang-Wook;Lee, Jong-Ho;Nam, Young-Sook
    • Journal of Environmental Impact Assessment
    • /
    • v.9 no.4
    • /
    • pp.277-290
    • /
    • 2000
  • The purpose of this study is to identify the problems of environmental impact assessment(EIA) and to suggest new EIA technology. The problems of EIA in Korea can be summarized as follows. First, the EIA does not reflect the impact of policy, plan and program on environment. Second, the project EIA does not consider the cumulative impacts such as additive impacts, synergistic impacts, threshold/saturation impacts, induced and indirect impacts, time-crowded impacts, and space-crowded impacts. Third, the EIA techniques in Korea are not standardized. Finally, the present EIA suggests only alternatives to reduce adverse impacts. To solve above-mentioned problems, the development of new EIA technology is essential. First, the new EIA technology should be developed toward pollution prevention technology and comprehensive and integrated environmental management technology. Second, new fields of EIA for pollution prevention contain strategic environmental assessment, cumulative impacts assessment, socio-economic impact assessment, cyber EIA and EIA technology necessary after the reunification of Korean Peninsula. Third, EIA technology for integrated environmental management contains the development of integated environment assessment system and the development of packaged EIA technology. The EIA technology for integrated environmental assessment system contains (1) development of integrated impact assessment technology combining air/water quality model, GIS and remote sensing, (2) integrated impact assessment of EIA, traffic impact assessment, population impact assessment and disaster impact assessment. (3) development of integrated technology combining risk assessment and EIA (4) development of integrated technology of life cycle assessment and EIA, (5) development of integrated technology of spatial planning and EIA, (6) EIA technology for biodiversity towards sustainable development, (7) mathematical model and GIS based location decision techniques, and (8) environmental monitoring and audit. Furthermore, there are some fields which need packaged EIA technology. In case of dam development, urban or industrial complex development, tourist development, landfill or combustion facilities construction, electric power plant development, development of port, road/rail/air port, is necessary the standardized and packaged EIA technology which considers the common characteristics of the same kind of development project.

  • PDF

Prediction Model of Software Size for 4GL and Database Projects

  • Yoon, myoung-Young
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.4 no.3
    • /
    • pp.1-7
    • /
    • 1999
  • An important task for any software project manager is to be able to predict and control project size. Unfortunately, there is comparatively little work that deals with the problem of building prediction methods for software size in fourth-generation languages and database projects. In this paper, we propose a new estimation method for estimating for software size based on minimum relative error(MRE) criterion. The characteristic of the proposed method is insensitive to the extreme values of the observed measures which can be obtained early in the development life cycle. In order to verify the performance of the proposed estimation method for software size in terms of both quality of fit and predictive quality, the experiments has been conducted for the dataset Ⅰ and Ⅱ, respectively. For the data set Ⅰ and Ⅱ, our proposed prediction method was shown to be superior to the traditional method LS and RLS in terms of both the quality of fit and predictive quality when applied to data obtained from actual software development projects.

  • PDF

Reengineering Daily Reporting Process by Using Task Generator and Mobile Technology (작업생성기와 모바일 기술을 이용한 작업일보 프로세스 리엔지니어링)

  • Kang Woo-Young;Chin Sangyoon;Kim Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.100-110
    • /
    • 2005
  • As construction projects are getting more complex and larger in size, the amount of information is increased exponentially, which requires information management systems to accumulate as-built information throughout the project life-cycle. Particularly, a daily report system is very important, since it helps them keep track of various as-built information at the most detailed level. However, there have been many problems with daily reporting since its process is time-consuming and contains a lot of redundancies and ambiguities. Therefore, the objective of this research is to improve a process of collecting as-built information and managing daily report. To do so, this research developed a to-be process model and a daily report system. The daily report system developed in this research consists of interactive task generator and daily report management modules. The system has been successfully implemented in a real world construction project. The system development processes including process analysis, information models and system features are described along with discussions on the results and improvements.

Green Chemistry at the present in Korea

  • Lee, Seung-Kyu;Park, Hyeon-Soo
    • Environmental Analysis Health and Toxicology
    • /
    • v.30 no.sup
    • /
    • pp.1.1-1.5
    • /
    • 2015
  • Objectives Despite the great contribution made by chemical substances to the development of modern civilization, their indiscriminate use has caused various kinds of damage to the global environment and human beings. Accordingly, the major developed countries and international society have tried to ensure the safe use of chemicals and a reduction in the use of hazardous chemicals through the establishment of the United Nations Environment Programme and various international agreements. In this reason, we tried to introduce about Green Chemistry progress at the present in worldwide and Korea. Methods We checked and analyzed relative journals, reports using keyword as like Green Chemistry, alternative chemicals, eco-friendly etc. and major country's government homepage search. Results Green Chemistry theory, which argues for the reduction or removal of harmfulness in chemicals throughout their entire life-cycle, has been spreading, and major developed countries, such as the US and Denmark, have developed and operate programs to provide reliable chemical information to help replace hazardous chemicals. Korea has also been conducting studies as like eco-innovation project. Through this project the "Alternative Chemical Search program," has been developed, distributed, and operated since 2011 to provide reliable information to small and medium-sized businesses that have difficulties collecting information to ensure conformity to international regulations. The program provides information that includes the regulations of major countries and Korea, information on 340 alternative chemicals, 70 application cases, and 1:1 consulting. Conclusions The Alternative Chemical Search program is expected to contribute to the establishment of response systems for regulation of Korean small and medium-sized businesses, and it also will be used to provide basic data for Korean hazardous chemical regulation, together with the Act on the Registration and Evaluation, etc. of Chemical Substances and the Chemical Control act, making it possible to establish an infrastructure for Green Chemistry in Korea and to increase national competitiveness.

A Study on the Test and Evaluation Process Development for Korea Next Generation Highspeed Electric Multiple Unit (차세대 고속열차 시험평가 프로세스에 관한 연구)

  • Lee, Tae-Hyung;Kim, Sang-Soo;Kim, Seog-Won;Kim, Ki-Hwan;Chung, Heung-Chai
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.7 no.2
    • /
    • pp.7-11
    • /
    • 2011
  • A high-speed railway system represents a typical example of large-scale multi-disciplinary system, consisting of subsystems such as rolling-stock, electrical hardware, electronics, control, information, communication, civil technology etc. The system design and acquisition data of the large-scale system must be the subject under strict configuration control and management. Systems engineering technology development project for Korea next generation High-speed Electric Multiple Unit (HEMU) system in progress is a national large system development project that is not only a large-size and complex but also multi-disciplinary in nature. Therefore, all stakeholders must understand and share the functional and performance requirements of HEMU throughout its life-cycle phases. Also in the test and evaluation phase, all systems requirements must be verified. In 2011, the prototype train manufacturing will be completed. It will do test run on the commercial line and all systems requirements are verified until 2012. For the system verification, the test and evaluation process have to be established before the test trial run. Using a systems engineering tool, the system design database(SDD) with requirements traceability and development process management in the course of the development have to be established. This paper represents the test and evaluation process development based on the SEMP(Systems Engineering Management Plan) developed in the design stage. The test and evaluation process is refined and updated in comparison to the design stage one. The test and evaluation process consists of procedure, test and evaluation method and schedule. So through this process, it is defined that each systems requirements is verified on which test and about what time.

Development of Virtual Construction Equipment Simulation System Based on BIM for Civil Engineering Project (토목시설물에 대한 BIM 기반 가상건설 장비 시뮬레이션 시스템 개발)

  • Kim, Sung-Hoon;Yoon, Young-Cheol;Joo, Cheol-Beom;Yoon, Dong-Ju
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.3
    • /
    • pp.223-230
    • /
    • 2017
  • BIM(building information modeling) has been actively applied to construction industries and to maximize its application through the life cycle of structure, various relevant technologies have been proposed. In particular, 4D sequencing management and 5D cost-related management were introduced as an improved version of the design review and interface control by 3D information design. On the other hand, the virtual construction using virtual construction equipment can sophisticatedly handle capacity, dynamic movement, collision boundaries of actual construction machines but it still stays at a low level in a technical sense. In this study, simulation systems based on BIM involving virtual construction equipment have been developed; then it is applied to the actual construction project to evaluate the safety and efficiency of construction equipments. It was confirmed that the simulation systems can be utilized to construct virtual construction site by using an effective 3D library of construction equipment and can plays a key role to secure construction safety and economic feasibility. Specifically, the simulation system are very useful for decision making by construction managers to select the optimum equipment and construction method with a better understanding for safety and cost-saving.

Development of BIM Standard Database System for an Approximate Estimate of Old-Aged Apartment Remodeling Project (노후공동주택 리모델링의 개략견적을 위한 BIM 데이터베이스 구축)

  • Lee, Dong-Gun;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.53-64
    • /
    • 2010
  • Remodeling becomes the significant issue in the aspect of the resource recycling, because it does not demolishes the whole buildings, but a part of main structure. However, compared with new construction, remodeling has several problems of adding the repair and rehabilitation works, using the partial demolition method, and having difficulties of making decision due to disagreement between several owner organizations. BIM, which is the total solution for managing and producing information during whole life cycle of the buildings, seems to be the right solution for the way to address these issues. has a possibility for solving the problems. Therefore this paper provided the framework and database for applying the BIM in the remodeling, and proved the applicability of the BIM database in the remodeling project through the case studies.

Software Size Estimation Model for 4GL System (4GL 시스템에 대한 소프트웨어 크기 추정 모델)

  • Yoon, Myoung-Young
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 1999.05a
    • /
    • pp.97-105
    • /
    • 1999
  • An important task for any software project manager is to be able to predict and control project size. Unfortunately, there is comparatively little work that deals with the problem of building estimation methods for software size in fourth-generation languages systems. In this paper, we propose a new estimation method for estimating for software size based on minimum relative error(MRE) criterion. The characteristic of the proposed method is insensitive to the extreme values of the observed measures which can be obtained early in the development life cycle. In order to verify the performance of the proposed estimation method for software size in terms of both quality of fit and predictive quality, the experiments has been conducted for the dataset I and II, respectively. For the data set I and II, our proposed estimation method was shown to be superior to the traditional method LS and RLS in terms of both the quality of fit and predictive quality when applied to data obtained from actual software development projects.

  • PDF

Software Quality Assurance Activities of Automatic Train Control System to meet Requirements of the IEC 62279 Standard (IEC 62279 요구사항 충족을 위한 열차제어시스템의 소프트웨어 품질보증 활동에 관한 연구)

  • Shim, Kyu-Don;Lee, Jong-Woo
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.4
    • /
    • pp.412-418
    • /
    • 2010
  • This paper presents the methods to acquire the Safety Certificate from Independent Safety Assessment based on the IEC standard62279 which is commonly applied to railway system for Automatic Train Control(ATC) system in accordance with Urban Maglev project. This also shows approach methods and relative activities for project life- cycle to accomplish and ensure the system requirements of ATC system, RAMS and S/W quality activities. Furthermore, the key tasks conducted with ISA are noted in detail. These kind of activities for software quality of ATC system to obtain S afety Certificate could be a CASE model to improve the quality of domestic railway system and products, and also contribute to the growth of railway business and toward the achievement of overseas' railway signaling markets.

A Study on Composition and Application of Risk Management Planning and Procedure for Successful Overseas Construction Projects - Based on the PRINCE2 Methodology in the UK - (성공적인 해외 건설 프로젝트 수행을 위한 리스크 관리 계획·절차 구축 및 활용 방안에 대한 연구 - 영국의 사업관리 기법인 PRINCE2를 기반으로 -)

  • Kang, Sinbong;Kim, Seungchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.48-55
    • /
    • 2016
  • Risk management is an important element for successful management of overseas construction projects. This study reports a case study in which we proposed a risk management planning and procedure for plant construction which can be applied throughout the project life cycle. We analyzed the risk management practices of Korean construction companies by applying the concept of the PRINCE2 method developed in the UK, and proposed a risk management planning and procedure with organizational structure and working process. The suggested risk management planning and procedure was applied to an overseas plant construction project, and produced good results. It is believed that the procedure suggested here can also be aplied to other companies to enhance the competency in the global construction market.