Cost Estimating method for the Public Office building at the early stage (공공건축물의 초기공사비 산정방법 연구)

  • Koo, Won-Yong;Kim, Jung-Gon;Lee, Jun-Seok;Park, Hyeong-Geun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.261-266
    • /
    • 2007
  • In this research, we studied an estimating method in client's sight to estimate the total construction cost which is based on the historical cost data at the early stage of the office buildings as a public phase. It is very difficult to analyze the estimation accurately and logically. When a client estimates a project, he/she has to consider there are many issues at the planning step, according as office buildings become gradually diversified as well as their roles continuously extended. Therefore, those are usually make problems for wasting the budget in accordance with the cost estimation errors. Moreover, many kinds of public construction projects, especially such as school, office, sports complex, and the others, have been invested the private finances defined as BTL(Build Transfer Lease) method that are required to manage the detailed process more strictly from initial planning. In order to make an effective planning, the long-term users amount and the building life cycle at the beginning of project should be considered previously and then it may enable to achieve an appropriate project plan. But actually considering overall variables in a building planning is impossible. Accordingly, suggesting a regression model based on the historical cost data from many similar types of office building to support client's role known as estimating the total cost at the early stage. And then performing the test against the proposed model to research the reasonability as using the historical cost data of Japan office buildings.

  • PDF

The Development and Application of Integrating Instruction with Evaluation Materials for Strengthening of Independent Living Competence: Focused on Technology and Home Economics Education (기술·가정과 생활자립역량 함양을 위한 교수학습-평가 연계 자료 개발 및 적용)

  • Lim, Yun Jin;Kim, Eun Jeung
    • Journal of Korean Home Economics Education Association
    • /
    • v.31 no.3
    • /
    • pp.23-39
    • /
    • 2019
  • The purpose of the study was to analyze the home economics education experts' and teachers' perception of ways to align instruction with evaluation, based on the 2015 revised technology and home economics curriculum for the purpose of developing the independent living competencies, and to provide examples of alignment in practice. The analysis is based on the data from a Delphi study (10 experts) and a survey of technology and home economics teachers(n=422). The results of survey indicated that experts and teachers perceived the instruction-assessment alignment to be most appropriate for project learning-project assessment, followed by project learning-portfolio assessment, problem solving learning-portfolio assessment, and problem solving learning-project assessment, in order. Based on the survey results, a model of instruction-assessment alignment and a teaching-learing plan were presented, based on 'Development task of life cycle and Life plan' unit. This was considered to be a proper method of instructional alignment for the purpose of developing 'independent living competence' with project-learning/project-assessment. The model focuses on consistency between instruction and evaluation, unity in methods, and the availablility of feedbacks of assessment for the improvement of independent living competencies. In conclusion, this study contributes as foundational information for teaching and learning-assessment alignment. Diverse methods of instruction-evaluation alignment is expected for future research.

A Manpower Distribution Model for Software Development Cycle (소프트웨어 개발주기 인력분포 모델)

  • 박석규;박중양;박재홍
    • Journal of the Korea Computer Industry Society
    • /
    • v.5 no.1
    • /
    • pp.9-18
    • /
    • 2004
  • Successful project planning relies on a good estimation of the manpower required to complete a project in addition to the schedule options that may be available. Existing software manpower estimation models present the total manpower and instantaneous manpower distribution for the software life cycle. Putnam's Rayleigh and Phillai et al.'s Gamma models present a model with assumption that the manpower is needed at the system delivery. This means that 40 percent of total manpower is applied at the software development, and the other 60% is applied during maintenance phase. However Warburton observes the manpower is needed during development phase with the peak at the completion of the software design phase. So, the existing models were not appropriate to be applied to practical projects. This paper suggests the Sigmoid model which does not consider the point of manpower peak to fix the problem above. The suggested model showed some improvement when practical data was applied. Therefore, the Sigmoid model can be used as alternative of Rayleigh and Gamma model to estimate distribution of manpower during software development phas.

  • PDF

A Study on the Systems Engineering Process for Effectively Carrying Out LRT Project (경량전철사업의 효과적인 수행을 위한 시스템엔지니어링프로세스 연구)

  • Han, Seok-Youn;Kim, Joo-Uk;Baek, Jong-Hyun
    • Transactions of the KSME C: Technology and Education
    • /
    • v.1 no.1
    • /
    • pp.139-145
    • /
    • 2013
  • Light rail transit(LRT) is a public transportation and mainly has an automatic driverless operation system. LRT project is a large scaled project which a construction cost is tens of billions of won per km. Systems engineering(SE) is an interdisciplinary approach and means to enable realization of successful systems. In this paper, we propose the systems engineering processes and their outputs list for the LRT project. And then, we present template and sample case of process output. We also present a case which carried out SE process by SE tool.

An Empirical Study on Critical Success Factors in Implementing ERP System (ERP시스템 구축단계 별 주요성공요인에 관한 실증적 연구)

  • 김상훈;최광돈
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.26 no.4
    • /
    • pp.1-21
    • /
    • 2001
  • The purpose of this stuffy is to derive critical success factors for ERP system implementation by integrating managerial, technical. human resource and organizational culture factors welch have been proposed as influencing factors for the performance of ERP system implementation in previous studios. Especially, this stuffy divides ERP system implementation process into preparation stave, implement stage and settle-down and stabilization stave, and then derives critical success factors in each stage. The data for empirical analysis of the research model are collected from 64 companies and the respondents for questionnaire consist of ERP system implementation project managers and user department managers in companies which have already operated it after ERP system installation. The main results of this study are as follows. First, it derives 27 success factors through comprehensive review of various factors which may affect ERP system implementation performance, and categorizes them into one of three stapes preparation stave, implement stage, and settle-down and stabilization stage. Second, the relationship between many success factors at each stave (preparation stave, implement stage, and settle-down and stabilization stave) and performance variables is tested. As a result, the significant correlations between many success factors at each stage and ERP system implementation performance are found, and the difference among success factors in the degree of influencing the system performance is significantly shown. finally, the relationship between process-oriented performance variables and result-oriented performance ones is tested. As a result, it is found that there is significant correlation between process-oriented performance variables except for one variable-project resource management appropriateness - and result-oriented performance ones. The theoretical contribution of this study is to derive a comprehensive model of critical success factors for implementing ERP system project from the system deve1opment life cycle perspective, and empirically test it through field survey with a wide range of data collection. And, the practical implication of this study is to present the desirable guidelines for performing ERP system implementation project successfully.

  • PDF

A Study about BIM Execution Plan for Specialty Contractors at Construction Phase - focused on Specialty Contractors in Reinforced Concrete Works - (시공단계에 참여하는 전문건설업체를 위한 시공 BIM 수행계획 구축 - 철근콘크리트 업체를 중심으로 -)

  • Lee, Joo-Sung;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.5 no.3
    • /
    • pp.19-32
    • /
    • 2015
  • For decades, the productivity issue has been a primary concern for the all stake-holders who participate in domestic construction industry. Especially, between a whole life cycle of building, the construction phase's productivity problem makes or break the entire project. In this respect, the general construction company, who accept the order and construct the building(so called General Contractor), should consider various strategies, such as schedule management, cost management, quality management, inner-crew management, etc., for the productivity improvement., and almost of these management methods have been studied for a long time. But, the researches and studies about the specialty contractor, who construct the building directly in construction site were not sufficiently complete yet. This research begins as an idea which tries to apply the BIM(Building Information Modeling) into the tasks of Specialty contractors for their productivity improvement. And for the effective application of construction BIM to specialty contractors, establish of the BIM project execution plan for them, not the fragmentary adoption of BIM. Therefore, in this paper, we develop the BIM project execution plan for the reinforced concrete companies who conduct the framework construction which located on CP(Critical Path) Especially, we model the "Construction BIM Use List for the RC Work", "BIM Application Master Process" and "BIM Application Detailed Process", and general contractor who use these BIM uses list and process models can manage various specialty contractors about schedule, cost, earned value, quality, safety and environment management systematically.

A Study on the Process of Estimating the Amount of Materials for Client's Decision-Making Support in Space Programming Stage of Pre-design BIM -focusing on Building Interior Finishing- (건축 기획 BIM의 공간 프로그래밍 단계에서 발주자 의사결정지원을 위한 물량예측 방법론에 관한 연구 -건축마감을 중심으로-)

  • Jun, Yeong-Jin;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.3
    • /
    • pp.19-28
    • /
    • 2010
  • The construction projects are recently having changes in their magnitude and complexity. Therefore, the amount of information created and managed by participants over project phases is enormous and this may cause difficulties in consistent and integrated data management. Because of the change in construction projects, there is a need to apply more logical and systematic ways to deal integrated data management. For the solution to this, BIM(Building Information Modeling), a new paradigm for integrated management of the information over project life-cycle, has been seriously considered. Also, the Korean Public Procurement Service announced that project over 50 billion Korean Won should introduce BIM into procurement starting from 2012. However, the studies and development have lack on studies of applying BIM and managing the data made using BIM in pre-design and maintenance stage. In pre-design stage, the concept of schematic design model is made to support for making major decisions concerning the size, shape and cost of the project. To decide the cost for the building in this stage by making use of BIM, estimating the amount of building materials used for constructing should be preceded. In this study, the pre-design BIM is explained to gain a better understanding of its process, since this paper focused on space programming stage. Finally, the paper suggests the concept process of estimating the amount of materials in building interior finishing from selecting the type for the elements of each space made to support the client for making decisions in space programming stage based on pre-design BIM.

Implementation of Git's Commit Message Complex Classification Model for Software Maintenance

  • Choi, Ji-Hoon;Kim, Joon-Yong;Park, Seong-Hyun
    • Journal of the Korea Society of Computer and Information
    • /
    • v.27 no.11
    • /
    • pp.131-138
    • /
    • 2022
  • Git's commit message is closely related to the project life cycle, and by this characteristic, it can greatly contribute to cost reduction and improvement of work efficiency by identifying risk factors and project status of project operation activities. Among these related fields, there are many studies that classify commit messages as types of software maintenance, and the maximum accuracy among the studies is 87%. In this paper, the purpose of using a solution using the commit classification model is to design and implement a complex classification model that combines several models to increase the accuracy of the previously published models and increase the reliability of the model. In this paper, a dataset was constructed by extracting automated labeling and source changes and trained using the DistillBERT model. As a result of verification, reliability was secured by obtaining an F1 score of 95%, which is 8% higher than the maximum of 87% reported in previous studies. Using the results of this study, it is expected that the reliability of the model will be increased and it will be possible to apply it to solutions such as software and project management.

EBS for BIM based maintenance management of Thermal Power Plant (BIM기반 화력발전시설 유지관리를 위한 EBS(Elements Breakdown Structure)개발)

  • Kim, Chang-Soo;Cha, Sang-Hoon;Ji, Soung-Min
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.81-82
    • /
    • 2015
  • BIM has been a reliable construction project management tool to handle various kinds of construction information generated in the facility life cycle. To take these advantages, researchers have been promoted numerous studies in a residential, a commercial, and an educational facilities with a large number of on-going projects. However, despite running as the role of essential energy supplier, power plant related BIM research is relatively insufficient than others. In particular, due to the extending of the facility service period and the requirement of the complicated construction project management for 'overhaul' and 'repowering' in the power plant maintenance phase, the needs for using BIM have been increased gradually. For using BIM based maintenance, it is needed to consider an information collecting methods and necessary to develop an appropriate breakdown structure to share information. Therefore, 'EBS' is produced by reviewing the previous research related to BIM and analyzing the repair activities in the maintenance phase. Proposed 'EBS' must be useful not only a judgment between capital expenditure versus revenue expenditure but also appropriate maintenance strategies development for property management.

  • PDF

Practices in VE/LCC based Design of Harbor Structures (VE/LCC기법의 항만구조물 설계적용 사례분석연구)

  • Yoon, Gil-Lim;Kang, Oh-Ram;Kim, Dong-Hyawn
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.20 no.4
    • /
    • pp.390-400
    • /
    • 2008
  • Reports on VE/LCC based coastal structural design were analyzed to derive possible improvement. VE/LCC technique may be effectively applied to making decisions in coastal structural design. However, it has not been well utilized in recent projects for some problems. Therefore, recent project reports on VE/LCC have been analyzed and merits and demerits were classified. Then, the reason why VE/LCC cannot be effectively applied to real projects was drived. Finally, some pre-requisites to improve the technique were summarized.