• 제목/요약/키워드: Project Life-cycle

검색결과 479건 처리시간 0.025초

Factors Influencing Cost Overruns in Construction Projects of International Contractors in Vietnam

  • VU, Thong Quoc;PHAM, Cuong Phu;NGUYEN, Thu Anh;NGUYEN, Phong Thanh;PHAN, Phuong Thanh;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제7권9호
    • /
    • pp.389-400
    • /
    • 2020
  • A construction project is a designed product made up of labors, materials, and installations in the project positioned on the ground and may include the underground and ground section, and the section in water or on the water surface. It is a civil, industrial, transport, agricultural and rural development, infrastructure, or some other. A key phase in the life cycle of these construction projects is the implementation when building products are made directly with workers, equipment, materials, and managers. If there is a lack of management experience, information, and problem-solving solutions to tackle the risks faced by contractors, especially foreign ones, will fail in controlling the project's cost. This study was conducted with investigations, discussions, and evaluation of the factors that lead to cost overruns in the construction projects of international contractors in Vietnam. The principal component analysis (PCA) showed that those factors that influence cost overruns these construction projects fall into five general groups, including factors related to (i) the owners, (ii) the foreign contractors, (iii) the subcontractors and suppliers, (iv) state management, and (v) the project itself. Besides, the study proposes solutions to limit cost overruns in construction projects and improve the profitability of international contractors in Vietnam.

AWP (Advanced Work Packaging) 체계 도입을 위한 국내건설기업의 필요 조직역량 도출 연구 (Identifying the Organizational Competency Factor for Implementing AWP (Advanced Work Packaging) in perspective of Korean EPC Contractor)

  • 문수환;윤성민;박찬영;조태상;한승헌
    • 한국건설관리학회논문집
    • /
    • 제21권3호
    • /
    • pp.20-27
    • /
    • 2020
  • 플랜트 프로젝트의 성과 향상을 위해 EPC 업체들은 통합적 관점에서의 프로젝트 사업관리 방식 개발에 대해 지속적인 관심을 보이고 있다. 특히, Advanced Work Packaging (AWP)는 프로젝트 생애주기 관점에서 기존의 "작업체계" 개념을 통합하여 프로젝트 수행 방식을 일부 재조정하는 방식으로 사업성과 개선을 위한 방법으로 제시되고 있다. 그러나 아직까지 국내 EPC 업체들은 AWP 도입의 초기 단계로, AWP를 수행하기 위한 구체적인 연구가 부족한 실정이다. 이에 따라, 본 연구에서는 AWP 체계의 도입을 위해 EPC 기업에서 갖추어야 하는 조직역량 도출을 목표로 하였다. 문헌 고찰과 현직자 인터뷰를 통해 AWP 도입시 발생할 것으로 예측되는 주요 리스크를 도출하였으며, 맥킨지 7S 모델 체계에 맞추어 이를 방지하기 위한 29개의 조직역량 항목을 도출하였다. 이후 AWP 전문가 5인의 검증 과정에서 추가적으로 도출된 8개의 조직역량 항목을 반영하여 최종적으로 효과적인 AWP 도입을 위해 필요한 조직역량 37개를 도출할 수 있었다.

소프트웨어 개발 단계별 최적의 노력 할당 (Optimal Effort Allocation in Software Development Phase)

  • 박재흥;노명옥;하석운
    • 한국컴퓨터산업학회논문지
    • /
    • 제3권3호
    • /
    • pp.295-306
    • /
    • 2002
  • 성공적인 프로젝트 계획은 활용 가능한 일정과 더불어 프로젝트를 완수하는데 요구되는 노력을 얼마나 정확히 추정하느냐에 달려있다. 새로운 또는 보다 나은 모델 개발에 많은 연구가 이루어졌지만 현존하는 소프트웨어 노력 추정 모델들은 생명주기 전반에 걸쳐 투입되는 총 개발노력과 단위시간당 소요되는 노력 함수만을 제공한다. 또한, Putnam은 세부단계별로 일정한 개발노력 투입 비율을 제시하였다. 그러나 소프트웨어의 규모, 복잡도와 운영환경의 영향으로 인해 프로젝트 별로 투입되는 총 개발노력의 규모에 차이가 발생한다. 그 결과, 개발 세부단계별로 투입되는 노력의 규모도 프로젝트마다 차이가 발생한다. 본 논문은 총 개발노력 변동에 따른 소프트웨어의 계획, 명세, 구축, 시험과 이행단계에 투입될 개발노력을 추정하는 기준을 제시하였다. 이 모델들은 183종의 다른 소프트웨어 프로젝트들로부터 유도되었다. 제안된 기준은 프로젝트의 일정과 노력 할당관리에 실질적인 지침을 제공할 것이다.

  • PDF

국가연구개발사업 중간평가방법 연구-선도기술개발사업에의 적용사례-

  • 임윤철;이철원
    • 기술혁신연구
    • /
    • 제5권2호
    • /
    • pp.126-154
    • /
    • 1997
  • This paper addresses a methodology for monitoring the first phase('92-94') progress and its implication fo Highly Advanced National R&D Projects (HAN or G7 project) in Korea. The authors suggest a three-stage life cycle model for the management of national R&D program; planning stage, implementing & monitoring stage, and evaluating & harvesting stage. The interim evaluation, the main focuses of this paper, is one of the key issues for the effective management of national R&D program at the implementing & monitoring stage. The conceptual framework of the interim evaluation was developed both through reviewing related literature and considering the characteristics of the HAN program. A stepwise procedure of interim evaluation was introduced: 'initial screen' and 'detailed examination'. At initial screen all 11 projects were reviewed in terms of both their relevance and performance in order to decide whether further detailed scrutiny is needed or not. If there exist critical problems on the relevance or on the intermediate progress of each project, it is to be under further detailed examination. Evaluation was initiated by the G7 Planning and Evaluation Committee, which was established for advising, directing, and monitoring the HAN Projects, with the help of large number of experts from industries, universities, and research institutes. The monitoring results were reported to the related ministries and project coordinating agencies, and reflected in the second phase.

  • PDF

ISP(정보 전략 계획) 개념을 이용한 디지털 생산 적용 프레임워크 연구 (Research on the Framework for the Adoption of Digital Manufacturing Methodology with Information Strategy Planning Concept)

  • 우종훈;송영주;이태경;신종계
    • 한국CDE학회논문집
    • /
    • 제15권2호
    • /
    • pp.94-105
    • /
    • 2010
  • Todays, there is fast transition about the new manufacturing IT methodologies from the conceptual phase into the practical application phase for the strengthening of enterprise competitiveness in manufacturing industry. One of those new methodologies is PLM (Product Life-cycle Management). PLM methodology consists of 3D CAD for the product design, PDM (Product Data Management) for the data management based on the collaboration platform and lastly DM (Digital Manufacturing). DM has evoluted from the stand-alone computer simulation of early 1980s, and now it covers the overall production development and production. Unfortunately, there exist serious critical problems about the actual application of DM for the real work. This is owing to the transition of the point of view from stand-alone type application (such as flow simulation or robot simulation) to that of business process about product development and production management. In this paper, we propose an application framework for the successful project with the digital manufacturing methodology with the concept of Information Strategy Planning, which enables the systematic diagnosis and the quantitative evaluation. Also, we introduce the actual practice of the proposing framework with the ISP project for 'Analysis & Simulation Technique of manufacturing process project' that is being conducted by Chungnam Techno Park.

토목공사의 설계단계 BIM적용에 대한 연구 (BIM Application in Design Phase for Civil Engineering Project)

  • 강인석;김슬기;문진석;안재규
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.666-669
    • /
    • 2008
  • 최근 BIM은 국외의 적용 성공 사례를 통해 비용, 공기의 절감의 효과가 입증되어 건설업계에서 최대 이슈로 부각되고 있다. 본 논문에서는 기존 토목공사 설계단계의 업무와 정보관리 체계의 문제점을 파악한 후 설계 단계시 BIM기반의 토목공사 정보관리 모델을 제안한다. 논문에서 제시된 BIM기반 정보관리 모델은 교량공사를 대상으로 적용성을 검토하고 있으며, 이러한 설계단계의 지능화, 자동화된 통합정보관리는 참여자간의 효율적인 정보관리가 가능하도록 한다.

  • PDF

연신내 성당 리모델링 구축 프로젝트 (Remodeling Project of the 'Yeonsinae' Catholic Church)

  • 배강희;이혁준
    • 한국실내디자인학회:학술대회논문집
    • /
    • 한국실내디자인학회 2006년도 춘계학술발표대회 논문집
    • /
    • pp.53-54
    • /
    • 2006
  • Recently with increasing interest in the operation of life cycle, building remodeling business is spreading like a fashion. Keeping pace with the trend, the present project carried out the remodeling of an existing neighborhood facility into a religious facility based on the concepts of remodeling, reform and renovation. Basic requirements were overcoming spatial limitations, solving structural problems, meeting various functional needs, and securing a spatial size, and the project designed the interior of the building according to these requirements suggested by the owner. To overcome the low floor height of the existing space, the main sanctuary on the 1st floor had the ceiling in the form of a slant and installed indirect lighting into the resulting gaps, maximizing the depth and width of the space visually. The subsidiary sanctuary on the first basement was finished with red bricks, forming an arch using the bricks, to create religious atmosphere. However, considering the low floor height as in the 1st floor and the ceiling even lowered by the arch structure, the arch was formed threefold and the radius of the curvature of the arch was enlarged to secure a spacious feeling. The outer appearance was finished with granite on existing structure to save the cost of construction. In addition to the use of the finishing material, the structure of the arch and the frame of the opening part and the finishing of the walls were expressed with uneven surface in order to avoid the plainness of the appearance.

  • PDF

실용적인 원전공학 교육을 위한 시스템즈 엔지니어 프로그램 (Systems Engineer Program for Practical Nuclear Power Plant Engineering Education)

  • 장중구;정재천
    • 시스템엔지니어링학술지
    • /
    • 제11권2호
    • /
    • pp.31-40
    • /
    • 2015
  • KEPCO International Nuclear Graduate School (KINGS) is dedicated to nurturing leadership-level professionals in nuclear power plant (NPP) engineering. KINGS have designed curriculum based on two philosophies. First, we balance aspects of discipline engineering, specialty engineering, and management engineering in the framework of systems engineering. Second, KINGS have designed the curriculum so that students can learn and experience the know-what, know-how and know-why level knowledge of NPP engineering and management. The specialization programs are opened during the 2nd year for 3 trimesters and those are a process of learning through practical project courses. The objectives of the specialization programs are to help students to learn the NPP life cycle technologies in highly structured and systematic ways. The systems engineer program (SEP) is one of the specialization programs. A practical case of the SEP which was applied to the project course for the NPP electric power system design education will be elaborated in this paper.

소프트웨어 시험 인력의 추정 방법 (An Estimating Method for Software Testing Manpower)

  • 박주석
    • 정보처리학회논문지D
    • /
    • 제11D권7호
    • /
    • pp.1491-1498
    • /
    • 2004
  • 성공적인 프로젝트 계획은 활용 가능한 일정과 더불어 프로젝트를 완수하는데 요구되는 인력을 얼마나 정확히 추정하느냐에 달려있다. 새로운 또는 보다 나은 모델 개발에 많은 연구가 이루어졌지만 현존하는 소프트웨어 인력 추정 모델들은 소프트웨어 생명주기 전반에 걸쳐 투입되는 총 개발인력 또는 시간에 따른 단위시간당 개발인력 분포만을 제공하고 있다. 본 논문은 시간의 함수가 아닌 발견된 결함 수에 따라 시험단계에 투입되는 인력과 시험단계의 시험과정과 디버깅과정에 투입되는 인력을 추정하는 모델들을 제시하였다. 시험과 디버깅 과정에서 발견되는 결함에 기반한 투입 인력의 다항식 모델을 제안한다. 제안된 모델들은 5종의 다른 소프트웨어 프로젝트들에 적용되어 결정계수와 MMRE를 통해 모델의 적합성을 검증하였다.

SI 개발 프로젝트 생산성 향상을 위한 프로젝트 관리 방법론 구축에 관한 연구 (The Study on Project Management Methodology for Productivity Improvement of SI project - focus on CMMi and PMBOK -)

  • 이돈희;김종은
    • 한국IT서비스학회:학술대회논문집
    • /
    • 한국IT서비스학회 2009년도 춘계학술대회
    • /
    • pp.453-458
    • /
    • 2009
  • 정보화가 기업 경쟁력의 핵심 요소로 부각되고 있으며 기업 및 정부기관은 앞 다투어 정보화에 투자하고 있는 상황이다. 정보시스템 개발 프로젝트도 이제는 대형 프로젝트 수가 급증하고 있다. 최근 소프트웨어 CMMi 수준에 관한 인증 여부는 기업 경쟁력의 핵심적인 요인으로 그 중요성이 날로 강조되고 있다. 또한 PMI의 PMBOK는 프로젝트 관리의 바이블 격으로 업종 업태를 불문하고 광범위하게 적용되고 있는 상황이다. 프로젝트 관리자의 관점에서 볼 경우 CMMi 모델과 PMBOK 모델간의 중첩되는 부분, CMMi 프로세스를 실적용 시 관리영역에 대한 혼선 부분, 또한 PMBOK 상위지침의 구체성 미흡 부분에 대한 통합 및 조정이 필요하게 되었다. 현재 상용되는 개발방법론에는 관리적인 요소가 매우 미약하고, 국내에 아직까지 체계적으로 정립된 관리방법론이 없는 상황이다. 따라서, 본 논문에서는 프로젝트 관리자가 숙지해야 하는 프로젝트 관리영역, 프로젝트 관리단계, 제반 절차, 유관 정보시스템과의 연동(Interface) 등을 정보화 개발 프로젝트 생명주기(Life Cycle)에 맞춰 재구성 및 통합하여 프로젝트 관리자(Project Manager)에게 일관된 관점(Single Point of View)을 제시하여 프로젝트 생산성을 제고 하고자 한다.

  • PDF