• 제목/요약/키워드: Project Life-cycle

검색결과 480건 처리시간 0.026초

Sustainable retrofit design of RC frames evaluated for different seismic demand

  • Zerbin, Matteo;Aprile, Alessandra
    • Earthquakes and Structures
    • /
    • 제9권6호
    • /
    • pp.1337-1353
    • /
    • 2015
  • Seismic upgrading of existing structures is a technical and social issue aimed at risk reduction. Sustainable design is one of the most important challenges in any structural project. Nowadays, many retrofit strategies are feasible and several traditional and innovative options are available to engineers. Basically, the design strategy can lead to increase structural ductility, strength, or both of them, but also stiffness regulation and supplemental damping are possible strategies to reduce seismic vulnerability. Each design solution has different technical and economical performances. In this paper, four different design solutions are presented for the retrofit of an existing RC frame with poor concrete quality and inadequate reinforcement detailing. The considered solutions are based on FRP wrapping of the existing structural elements or alternatively on new RC shear walls introduction. This paper shows the comparison among the considered design strategies in order to select the suitable solution, which reaches the compromise between the obtained safety level and costs during the life-cycle of the building. Each solution is worked out by considering three different levels of seismic demand. The structural capacity of the considered retrofit solutions is assessed with nonlinear static analysis and the seismic performance is evaluated with the capacity spectrum method.

사례분석을 통한 3D 상용 어플리케이션 기반 BIM 데이터의 상호연동성 개선방향에 관한 연구 (A Study on the Development of the Problem Improvement Directions in Enhancing 3D BIM Data Interoperability through IFC)

  • 김지원;이민철;최정민;옥종호
    • 한국CDE학회논문집
    • /
    • 제14권6호
    • /
    • pp.390-403
    • /
    • 2009
  • Construction industries have increasingly utilized Building information Modeling (BIM) technologies. Interoperability - the capability for BIM data to run from one computer application to another in the life cycle of a project - has become one of the principal research areas. Enhancing interoperability inevitably requires information structures that are standardized throughout the construction industries. As a candidate of the data exchange standard, Industry Foundation Classes (IFC) has been developed and several researches recently performed to measure its richness of digital data exchange. But doubts have been brought up whether IFC meets a sufficient level of interoperability since the research result revealed a number of cases of information misrepresentation and loss. This research presents the lessons learned from the interoperability tests of three widely used 3D design applications including Graphisoft's Archicad, Autodesk's Revit, and Bentley's Bentley Architecture. One building's architectural and structural design data were modeled with the three tools and exchanged through IFC respectively for interoperability test.

건축 설계 BIM 모델의 시공단계 활용성 향상을 위한 BIM 운영 방안 제시 - 시공전단계 BIM 적용 사례를 중심으로 - (A Proposal for Using BIM Model Created in Design to Construction Phase - Case Study on preconstruction adopting BIM -)

  • 윤수원;김성아;최종문;금대연;조찬원
    • 한국BIM학회 논문집
    • /
    • 제5권4호
    • /
    • pp.1-10
    • /
    • 2015
  • In order to apply the BIM technology effectively and efficiently during the life-cycle of project, it is important to deliver a accurate information on BIM from designer, and it should be used effectively at construction or maintenance stage. However, stakeholders have created a new BIM model at each phase in many practise adopting BIM, not used BIM generated in design stage. Because they have different purposes for using BIM, and deliver the BIM model without the sufficient explanation or application. It is necessary to define the range of usable BIM in construction phase with analyzing clearly the BIM created in design phase, and determining the difference with required BIM in construction phase. Therefore, this study propose a method for construction c

Predicting the CO2 Emission of Concrete Using Statistical Analysis

  • Hong, Tae-Hoon;Ji, Chang-Yoon;Jang, Min-Ho;Park, Hyo-Seon
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권2호
    • /
    • pp.53-60
    • /
    • 2012
  • Accurate assessment of $CO_2$ emission from buildings requires gathering $CO_2$ emission data of various construction materials. Unfortunately, the amount of available data is limited in most countries. This study was conducted to present the $CO_2$ emission data of concrete, which is the most important construction material in Korea, by conducting a statistical analysis of the concrete mix proportion. Finally, regression models that can be used to estimate the $CO_2$ emission of concrete in all strengths were developed, and the validity of these models was evaluated using 24 and 35MPa concrete data. The validation test showed that the error ratio of the estimated value did not exceed a maximum of 5.33%. This signifies that the models can be used in acquiring the $CO_2$ emission data of concrete in all strengths. The proposed equations can be used in assessing the environmental impact of various construction structural designs by presenting the $CO_2$ emission data of all concrete types.

Framework of Non-Nuclear Methods Evaluation for Soil QC and QA in Highway Pavement Construction

  • Cho, Yong-K.;Kabassi, Koudous;Wang, Chao
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권2호
    • /
    • pp.45-52
    • /
    • 2012
  • This study introduces a methodology to evaluate different types of non-nuclear technologies to see how they are competitive to the nuclear technology for quality control (QC) and quality assurance (QA) in soil condition measurement for highway pavement construction. The non-nuclear methods including the Electrical Density Gauge (EDG) and the Light Weight Deflectometer (LWD) were tested for their performance against a nuclear gauge, and traditional methods were used as baselines. An innovative way of comparing a deflection gauge to a density gauge was introduced. Results showed that the nuclear gauge generally outperformed the non-nuclear gauge in accuracies of soil density and moisture content measurements. Finally, a framework was developed as a guideline for evaluating various types of non-nuclear soil gauges. From other perspectives rather than accuracy, it was concluded that the non-nuclear gauges would be better alternative to the nuclear gauge when the followings are considered: (1) greater life-cycle cost savings; (2) elimination of intense federal regulations and safety/security concerns; and (3) elimination of licensing and intense training.

공공시설물의 LCC 평가기준 개선방안 (Life Cycle Cost Evaluation Index Enhancing of Public Facilities)

  • 구본학;김태희;김옥규;박태근;이현수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.412-415
    • /
    • 2007
  • 최근 들어 선진국에서는 LCC에 대한 평가 제도를 활발히 활용 중에 있고, 우리나라는 건설공사비용을 절감하기 위하여 그 제도를 신규로 도입하고 있는 실정이다. 그리고 새로운 정부공사 발주방식인 "기술제안형 입찰방식" 도입에 따라 시설물 LCC를 평가하는 가격평가방식이 필요하게 되었다. 그러나 현재 우리나라는 BTL과 턴키 프로젝트에서 LCC를 평가하고 있으나 평가요소와 기준이 불명확하여 평가에 어려움을 겪고 있고 BTL과 턴키를 제외한 공공건설사업은 LCC 평가가 이루어지지 않고 있는 실정이다. 따라서 본 연구에서는 LCC를 체계적이고 객관적인 평가를 위한 평가기준을 제시하고자 한다.

  • PDF

과학기술분야 연구기관의 DMP를 적용한 연구기록물 관리 (Research Records Management in Scientific Research Institutes by Applying DMP)

  • 구찬미;김순희
    • 한국기록관리학회지
    • /
    • 제19권1호
    • /
    • pp.1-21
    • /
    • 2019
  • 과학기술분야 연구기관의 연구기록물은 연구개발사업 생애주기 전반에 걸친 설명책임을 이행하기 위한 핵심기록이다. 따라서 연구기록물은 체계적으로 관리되고, 보존되어 공유될 수 있어야 한다. 이 연구는 연구기록물 관리 방안으로 DMP의 적용 효용성을 분석하였다. 그 결과, 생산 이전단계에서의 연구기록물 관리의 필요성과 연구개발사업과 연구기록물간의 관계정보 관리의 중요성을 발견하였다. 이를 바탕으로 과학기술분야 연구기관에서 연구기록물 관리에 활용할 수 있도록 DMP를 적용하여 '연구기록물 관리계획(RRMP)'을 제안하였다.

Re-engineering Adult Education Programme-an Online Learning Curricular Perspective

  • Mathai, K.J.;Karaulia, D.S.
    • 한국멀티미디어학회논문지
    • /
    • 제6권4호
    • /
    • pp.685-697
    • /
    • 2003
  • The Web based multimedia programmes/courses are becoming widely available in recent years. Most of these courses focus on Behaviorist way of learning, which does not promote deep learning in any way. For Adults this approach further incapacitated, as it does not satisfy Andragogical needs. The search for Constructivist way of learning through the web applied to Indian conditions led to need for developing a curriculum development approach that would promote construction of knowledge through web based collaboration. This paper attempts to reengineer existing curriculum development processes and lays out a framework of‘Problem Based Online Learning (PBOL)’curriculum design. In this context, entire curriculum development life cycle is evolved and explained. This is a part of doctoral work (Ph.D), which is in progress and being undertaken by K.James Mathai, and guided of Dr.D.S.Karaulia.

  • PDF

ESTIMATING THE LOSS RATIO OF SOLAR PHOTOVOLTAIC ELECTRICITY GENERATION THROUGH STOCHASTIC ANALYSIS

  • Taehoon Hong;Choongwan Koo;Minhyun Lee
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.375-385
    • /
    • 2013
  • As climate change and environmental pollution become one of the biggest global issues today, new renewable energy, especially solar photovoltaic (PV) system, is getting great attention as a sustainable energy source. However, initial investment cost of PV system is considerable, and thus, it is crucial to predict electricity generation accurately before installation of the system. This study analyzes the loss ratio of solar photovoltaic electricity generation from the actual PV system monitoring data to predict electricity generation more accurately in advance. This study is carried out with the following five steps: (i) Data collection of actual electricity generation from PV system and the related information; (ii) Calculation of simulation-based electricity generation; (iii) Comparative analysis between actual electricity generation and simulation-based electricity generation based on the seasonality; (iv) Stochastic approach by defining probability distribution of loss ratio between actual electricity generation and simulation-based electricity generation ; and (v) Case study by conducting Monte-Carlo Simulation (MCS) based on the probability distribution function of loss ratio. The results of this study could be used (i) to estimate electricity generation from PV system more accurately before installation of the system, (ii) to establish the optimal maintenance strategy for the different application fields and the different season, and (iii) to conduct feasibility study on investment at the level of life cycle.

  • PDF

DEVELOPMENT OF A WEB-BASED COST AND DURATION MANAGEMENT SYSTEM FOR MEGA-PROJECTS

  • Chang-Taek Hyun;Run-Zhi Jin;Myoung-Jin Son;Seung-Yoon Shin
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.510-515
    • /
    • 2011
  • Urban renewal projects, in the form of mega-projects, are being actively implemented both nationally and internationally to revitalize inactive cities. These programs, however, are difficult to manage efficiently due to their need for a large budget over a long period of time and due to conflicts with stockholders. Moreover, existing cost and duration management systems are structured with emphasis on the design and construction stage of unit projects, thus limiting their application to long-term mega-projects that are integrated with various facilities. To solve these problems, this study developed a web-based system that can collectively manage the cost and duration of mega-projects at a program level. The unit modules included in the system--CBS organization, construction cost and duration prediction, and total cost and duration prediction--can support decision-making at the early stage of the program. Furthermore, the modules, which include contract management, execution management, change management, and program progress management, support the program operations for its successful accomplishment. The web-based cost and duration management system developed in this study is expected to be used as a valuable tool that supports the successful accomplishment of mega-projects through their efficient management throughout their life cycle.

  • PDF