• 제목/요약/키워드: Project Life-cycle

검색결과 479건 처리시간 0.025초

스마트그리드 환경에서 전기자동차 배터리를 이용한 V2G의 활용방안에 관한 연구 (A Study on the V2G Application using the Battery of Electric Vehicles under Smart Grid Environment)

  • 최진영;박은성
    • 전기학회논문지P
    • /
    • 제63권1호
    • /
    • pp.40-45
    • /
    • 2014
  • This study examines the system and process of battery stored energy in vehicles and suggest the effective area for the use of V2G(vehicle-to-grid) from Jeju Smart Grid Demonstration Project. V2G means technology of electric power transmission from the battery of electric-drive vehicles to state grid. As for the increasing of effectiveness for demand-side control, V2G is a very good alternative. In the U.S., the utilization of electric vehicles is under 40% on average. In this case, we can use he battery of electric vehicle as role of frequency regulation or generator of demand-side resource. V2G, which is the element of Smart Transportation, consists of electric vehicle battery, BMS(battery management system), OBC(on-board charger), charging infrastructure, NOC(network operating center) and TOC(total operation center). V2G application has been tested for frequency regulation to secure the economical efficiency in the United States. In this case, the battery cycle life is not verified its disadvantage. On the other hand, Demand Response is required by low c-rate of battery in electric vehicle and It can be small impact on the battery cycle life. This paper concludes business area of demand response is more useful than frequency regulation in V2G application of electric vehicles in Korea. This provides the opportunity to create a new business for power grid administrator with VPP(virtual power plant).

소프트웨어 규모 산정을 위한 개선된 기능 점수 측정 모델 (Improved Function Point Measurement Model for Software Size Estimation)

  • 정인용;우덕제;박진형;정창성
    • 인터넷정보학회논문지
    • /
    • 제10권4호
    • /
    • pp.115-126
    • /
    • 2009
  • 소프트웨어 규모 추정은 소프트웨어 Life-Cycle 초기에 분석되어 규모와 비용의 예측에 도움을 주어야 한다. 2004년 소프트웨어 사업대가 기준에 국제표준에 기반한 기능점수 방식이 도입된 후 사용자 입장에서 소프트웨어의 규모를 바라보고 비용을 산정하는 기반이 마련되었다. 그러나 현재의 기능 점수 측정 방식은 익숙하지 않은 일반 사용자가 접근하기 쉽지 않고, 모든 시스템 및 기능의 복잡도 가중치가 획일화되어 있어 내부 계산 로직이 복잡한 공학용 소프트웨어나 과학계산용, 시뮬레이션 소프트웨어에 대한 산정 방식에서 그 규모를 적절히 산정하지 못하는 문제점을 안고 있다. 본 논문에서는 기존의 기능점수 측정 절차를 간략화하고 프로젝트 초기에 규모의 추정을 쉽고 빠르게 수행할 수 있는 모델을 제시한다. 또한 특정 조직의 특성을 반영할 수 있는 수학적 가중치 산출 모형을 제시함으로써 고정된 복잡도 가중치에 대한 논란의 여지를 없애고 조직의 데이터가 쌓일수록 해당 조직의 특성을 반영해 나갈 수 있는 수학적 가중치 산출 모형을 제시한다. 제시한 모델은 평가 결과 기존의 FPA(Function Point Analysis) 방식보다 빠르게 규모를 측정할 수 있고 LOC(Line of Code)와의 상관관계도 더 높은 장점이 있다.

  • PDF

지하철 구조물 유지관리 시스템을 위한 BIM 개발 (Development of BIM for a Maintenance System of Subway Infrastructures)

  • 심창수;김성욱;송현혜;윤누리
    • 한국BIM학회 논문집
    • /
    • 제1권1호
    • /
    • pp.6-12
    • /
    • 2011
  • 시설물 전생애주기에 걸쳐 정보가 공유되고 피드백 될 수 있는 BIM(Building Information Modeling) 기술의 등장은 유지보수 관리자들에 게 가장 필요한 유지관리점검 도구의 의미를 지님과 동시에, 정보모델을 기반으로 주요 기술영역 및 사업주체간 원활한 의사소통이 가능해지도록 한다. 효율적인 지하철 터널의 유지관리를 위해서는 체계적으로 조직된 데이터가 필수적이다. 이 논문에서는 건설정보분류체계에 기반하고 유지관리 업무의 점검 단위를 고려한 분류체계를 개발하였다. 이를 통해 기존의 유지관리 프로세서에 정보모델링 프로세서를 도입하여 유지관리 작업의 흐름을 최적화하고 표준화하는 방안을 제안하였다. 또한 기존 유지관리 업무 프로세서의 불필요한 절차 및 시간을 효율적으로 절감하여 시설물의 총 생애주기비용을 절감하고 객체의 수선교체시 소요되는 시간을 절감하였다. 게다가 터널정보 모델링 프로세서 모델을 유지관리 정보의 이력관리에 도입하여 기존 정보관리보다 체계적인 관리가 가능하도록 하였다.

전자기록관리에 대한 국제 연구 동향 분석 - InterPARES 3와 ITrust 성과물을 중심으로 - (A Study on the International Research Trends in Electronic Records Management: InterPARES 3 and ITrust Achievements)

  • 박옥남;박희진
    • 한국기록관리학회지
    • /
    • 제16권1호
    • /
    • pp.89-120
    • /
    • 2016
  • 본 연구는 InterPARES 3와 ITrust의 배경, 주요 연구분야, 주요 연구성과를 소개하고, IP 3와 ITrust 주요 연구내용의 비교분석을 통하여 InterPARES 프로젝트의 기록관리에 대한 개념 및 변화를 이해하고자 하였다. 이를 위해 IP 3와 ITrust 연구프로젝트에 대한 내용분석을 수행하였으며 이를 통해 주요 키워드를 도출하고, 연구프로젝트 제목을 워드클라우드로 도식화하여 IP 3와 ITrust 비교에 활용하였다. IP 3와 ITrust 연구결과를 환경, 범위, 주제, 키워드, 연구목표, 기록관리 생애주기관점에서 비교분석하였다. 연구결과 InterPARES는 1) 장기보존 뿐만 아니라 생애주기 전반에 적용될 수 있는 분야로, 2) 진본성의 개념에서 신탁의 개념으로, 3) 전자기록에서 인터넷, 디지털 포렌식, 열린정부 또는 공공데이터 등을 포함하는 범위로 연구의 내용과 주제가 광범위하게 확장되고 있음을 파악하였다.

신한옥의 쾌적성능 평가: 전남 화순 잠정햇살마을 한옥단지를 대상으로 (Evaluation of Comfort Performance for Modernized Hanok: Targeting Hanok Residence at the Jamjeong-Haetsal Village in Hwasun, Jeonnam Province)

  • 최승주;이미향;김재향;한승훈
    • 토지주택연구
    • /
    • 제12권2호
    • /
    • pp.99-108
    • /
    • 2021
  • 이 연구의 목적은 한옥 거주환경의 쾌적성능에 대한 정량적 자료를 제시하고 개선 요인을 도출하는 데 있다. 먼저 정책적 성공사례로서 현대(신(新))한옥의 하나인 전남 화순군 잠정햇살마을 한옥단지를 대상으로 건구온도, 복사온도, 상대습도, 풍속 등 열쾌적성 평가의 영향 요소를 측정했다. 이어 도출 데이터를 적용하여 PMV(Predicted Mean Vote)를 산출하는 열환경 시험을 수행했으며, 사용자 대사율과 의복량을 변수로 설정하여 L.C.PMV(Life-Cycle PMV)와 N.PMV(Normal PMV)의 두 가지 유형으로 구분하여 평가를 진행했다. 그 결과, 여름 및 겨울철 시점을 전후하여 한옥 공간의 PMV 증감 동향이 뚜렷했으며, 특히 대서 및 대한 시점의 PMV는 쾌적구간을 완전히 벗어난다는 시험 결과를 확인했다. 아울러 겨울철 PMV의 변화 속도가 여름철보다 더 빠른 것으로 나타났다. 이러한 결과를 통해 신한옥의 쾌적성능 증진을 위해 단열성 개선이 우선 요인임이 도출되었으며, 설계 및 시공 단계에서 연계 검토가 요구된다.

VALUATION OF A MULTI-STAGE RAINWATER HARVESTING TANK CONSTRUCTION USING A REAL OPTION APPROACH

  • Byungil Kim;Hyoungkwan Kim;SangHyun Lee
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.386-389
    • /
    • 2013
  • Under climate change and urbanization, rainwater harvesting (RWH) systems are emerging as an alternative source of water supply because of growing concern about water sustainability. RWH systems can satisfy the various watering needs and provide the environmental benefits of lessening the damages from flood, drought, and runoff. The economic success of a RWH system is vitally concerned with the determination of the design capacity of storage tank to be built in the system. The design capacity is determined by the factors of average annual rainfall, period of water scarcity, and water price during the whole life-cycles. Despite the high uncertainties inherent in these factors, the current engineering design of RWH system construction often assumes that storage tanks should be built all at once. This assumption implicitly ignores the managerial flexibility in responds to the future as new information comes out-the right to build storage tanks stage by stage depending on the evolution of demand. This study evaluates the value of a multistage storage tank construction using a real option approach. A case study involving a typical RWH system construction in Jeonju, the Republic of Korea is conducted. The managerial flexibility obtained from the real option perspective allows engineers to develop investment strategies to better cope with the issue of water sustainability.

  • PDF

BIM기반 건설공사 일정관리를 위한 정보에 관한 연구 (A study on the Information for the Schedule Management of the Construction based BIM)

  • 박소현;송정화;오건수
    • 디지털콘텐츠학회 논문지
    • /
    • 제16권4호
    • /
    • pp.555-564
    • /
    • 2015
  • 최근 건설 프로젝트가 대형화, 복잡화, 전문화되면서 다양한 참여자들 사이에서 발생하는 방대한 양의 정보 활용이 중요해 지고 있다. 발생되는 다양한 정보 중 일정정보는 건설프로젝트의 중심적인 정보이다. 건설현장 관련 참여자간 일정정보교환 미흡은 공기지연, 품질하자와 같은 건설생산성 저해 요인을 유발한다. 현재, 건설 산업에서는 건축물의 전 생애 주기 동안 필요한 데이터를 생산하고 관리하는 BIM(Building Information Modeling)에 대한 관심이 높아지고 있다. 본 연구는 BIM을 기반으로 건설공사의 일정정보를 체계적으로 관리 할 수 있는 일정관리 정보 체계를 구축하는 것이다. 이를 위해 BIM적용 일정관리 업무 프로세스를 구축하였으며, 일정정보를 구축하기 위한 작업분류체계를 도출 하였다. 또한 일정정보 구축에 필요한 속성 중 BIM모델에서 추출 할 수 있는 정보를 도출하고, 일정관리에 필요한 속성정보와 연계하여 일정을 생성 하고 공사 진행 시점별 일정관리를 위한 필요 정보를 제시한다.

도시재생사업에서의 전자매뉴얼 (IETM (Interactive Electronic Technical Manual) for Urban Regeneration)

  • 유정호
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.74-81
    • /
    • 2008
  • 물리 환경, 생활 문화, 산업 경제적 재생을 통해 도시의 기능을 회복하는 것을 목적으로 하는 도시재생사업은 다양한 사업추진전략을 달성하기 위한 다수의 프로젝트의 존재, 복잡한 이해관계자 구조, 장기간의 사업 생애주기등의 특성을 가지고 있다. 이러한 특징을 가진 도시재생사업이 성공적으로 수행되어지기 위해서는 서로 다른 프로젝트들에 관한 정보들이 유기적으로 관리되어야 하며, 다양한 정보를 독립적인 정보형태로 제공되기보다는 각 프로젝트 데이터들의 통합 관리를 통해 정보 상호간에 서로 연계하여 활용하게 함으로써 사업기간 내에 발생하는 잦은 변화요구에 대응할 수 있도록 하고 각각의 사용자들이 의사결정 시에 필요한 정보를 종합적으로 적시에 제공해줄 수 있는 수단이 필요하다. 이에 본 연구에서는 이러한 도시재생사업의 특성에 대한 기술적 해결방안의 하나로 도시재생사업에 소요되는 정보를 종합적으로 연계하여 온라인상에서 제공하는 전자매뉴얼을 제안하며, 이와 더불어 도시재생사업에서의 전자매뉴얼 개발전략에 대해서도 고찰하였다.

  • PDF

BTL사업의 사업시행자 선정 평가기준개선에 관한 연구 (Improvement of Concessionaire Designation Evaluation Criteria for Build-Transfer-Lease Private Participation in Infrastructure Projects)

  • 신현인;박태근
    • 한국건설관리학회논문집
    • /
    • 제7권6호
    • /
    • pp.121-131
    • /
    • 2006
  • 2005년 1월 사회기반시설에 대한 민간투자법 개정으로 공공서비스시설을 국민들에게 제공할 수 있는 새로운 민간투자방식인 BTL민간투자사업(Build-Transfer-Lease)이 국내건설시장에 도입하게 되었다. BTL사업은 설계, 시공, 운영 및 유지관리까지 포함하여 최장 30여년 이상의 프로젝트 수명주기 전 과정을 대상으로 하는 포괄적인 형태의 사업방식으로 사업자의 역할과 수행능력 여하에 따라 사업의 성패가 좌우됨으로 최적 사업시행자의 선정이 중요하다 그러나 BTL사업의 사업시행자 선정시 가격평가점수에 따라 많은 영향을 받아 최저가 투찰로 인하여 우수한 기술능력을 갖춘 사업시행자보다 최저가격을 제안한 사업시행자가 선정 될 수 있는 가능성이 높아 건설계획 운영계획 유지관리측면 등에서 품질수준이 저하될 우려가 있는 것으로 조사되었다. 따라서 본 연구는 BTL사업의 사업시행자 선정을 위한 평가기준의 문제점을 분석하고 전문가 설문조사를 통하여 개선방향을 모색하여 평가기준 개선방안을 제안하였다.

블록체인기술을 활용한 토목공사 생애주기 BIM 모델의 신뢰성 확보 방안 (Application of Blockchain Technology to Verify Reliability of Life Cycle BIM Model for Civil Engineering Project)

  • 이재희;문현석;강인석
    • 한국건설관리학회논문집
    • /
    • 제22권1호
    • /
    • pp.116-124
    • /
    • 2021
  • 건설공사의 설계 및 시공단계에 BIM 모델의 활용성이 증대되면서 유지관리단계의 BIM 활용성 증대도 예상되고 있다. 유지관리단계에는 이미 작업이 완료된 설계 및 시공단계에 생성된 BIM 객체들을 사용하게 되므로, 활용하는 BIM 객체가 설계단계에 제작된 인증 모델인지 신뢰도 검증이 필요하다. 특히 철도시설물과 같이 토목, 건축, 전기, 신호, 궤도 등 다양한 공정과 기관으로 구성된 BIM 활용 프로젝트에서는 BIM 모델의 신뢰도가 더욱 중요도를 갖게 된다. 본 연구에서는 유지관리단계에서 사용하는 BIM 모델의 신뢰도를 확보하기 위한 방안으로 블록체인기술을 사용하는 방법을 제안하고 있으며, 이를 위해 BIM에 블록체인기술을 적용하기 위한 블록의 구조와 상세 프로세스를 구성하였다. 또한 이러한 과정을 실제 시설물의 BIM 모델에 적용하여 블록을 생성함으로써 블록체인 기술이 BIM 모델의 신뢰도 확보를 위한 도구로 사용될 수 있음을 확인하였다.