• 제목/요약/키워드: Project Life-cycle

검색결과 479건 처리시간 0.026초

PRICE 모델을 이용한 K1전차 수명주기 비용추정 (K-1 Tank Life Cycle Cost Estimate Using PRICE Model)

  • 강창호;강성진
    • 한국국방경영분석학회지
    • /
    • 제25권2호
    • /
    • pp.44-61
    • /
    • 1999
  • Cost estimation has posed a significant challenge to estimators, planners, and managers in both government and military. Considerable historical evidence shows that accurate cost estimation has been difficult to achieve across a wide range of projects, including weapon systems. This paper introduces new cost estimating concept, CAIV(Cost As an Independent Variable) and a cost estimating case study using PRICE model, computer aided parametric estimating models(CAPE) for K1 tank cost estimate. CAIV concept is to set realistic but aggressive cost objectives easily in each acquisition program and to achieve cost, schedule, and performance objectives considering various managing risks with a project manager and industry teams. The Price model is one of computer aided cost estimating models and widely used in U.S. defense system analysis as a tool for CAIV. We analyze theories, inputs, outputs of the PRICE model and present a case study for K1 tank to estimate costs in requirement and concept phase, program and budgeting phase, and life cycle phase. Finally we obtain results that the Price model can be used in various phases of PPBEES depending upon available data and time.

  • PDF

건축 기획단계 프로세스 모델의 CPLM 적용에 관한 연구 (A Study on Application of CPLM using Process Model of the Pre-design stage)

  • 박도영;전영진;문성곤;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.205-208
    • /
    • 2009
  • The purpose of this study is to apply the process model of the pre-design stage to CPLM(Construction Project Life-cycle Management). Life-cycle consists of 4 stage; Pre-design, Design, Construction, Maintenance. Each stage has organic relations between front and rear stage. Therefore it is important to manage and use the information data of each stage. But these data are not carried to the next stage smoothly, especially at the pre-design stage. It is even vague to define the process of the pre-design stage. To carry and share the information well, this study defines Pre-design stage process and CPLM at first, VA-Cityplanner which is the development system of the pre-design process model is applied to CPLM for the smooth current of the data between participants.

  • PDF

Contextual Models of Business Application Software Architecture

  • Koh, Seokha;Ji, Kyoung-Sook
    • Journal of Information Technology Applications and Management
    • /
    • 제20권3호
    • /
    • pp.1-18
    • /
    • 2013
  • Software architecture is the blueprint for a software system and should provide consistent guidelines for design, implementation, and maintenance throughout the entire lifecycle of the system. Components, interactions between the components, well-formed structure, reasons, and various perspectives reflecting various stakeholders' concerns changing through the phases of software lifecycle are the key elements of software architecture. The architect identifies and engages the stakeholders, understands and captures stakeholder's concerns including those regarding life cycle, and lets the concerns reflected in the architecture. To do so, architect should take into consideration various contextual elements regarding the system too. We make an extended list of the elements, especially those of business application software architecture, that the architect should take into consideration and construct a model of the relationships between the elements.

Big Data 분석 방법론을 이용한 건물 유지보수 예측 모형 기본 방안 개발 (Framework on a Prediction Model for Building Repair & Maintenance Using Big Data Analytic Approach)

  • 이은지;최병일;고용호;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.114-115
    • /
    • 2013
  • The maintenance and repair period consists the largest part of a construction project life cycle cost. However, it has been analyzed that the repairing plan relies on regulations and the officers' experience mostly that sometimes lead to performing unnecessary work. Moreover, the data occurred during repairing have not been stored in a system that can be used in future plans. Therefore, the purpose of this study is to suggest a repairing cost and time predicting model by applying the properties of the building.

  • PDF

UML 기반 객체 지향 개발을 위해 ISO 12207을 조정한 객체지향 프로세스 (ISO12207 Tailored Object-Oriented Process for UML Based Object-Oriented Development)

  • 이상준;김병기
    • 한국정보처리학회논문지
    • /
    • 제6권10호
    • /
    • pp.2680-2692
    • /
    • 1999
  • Software quality is classified by quality of process and product. In experience of Quality Management, it is known that quality level of product as it depends on goodness and badness of process and organization. As a result, improvement of software process has been important subject. According as this trends, ISO 12207 is publicated as standard of software life cycle process by ISO. For UML based object oriented development process, it is necessary that we should research detailed definition of activity and task of ISO 12207 process which is added, deleted or tailored in according to organization and project characteristics. In this thesis, by according with ISO 12207 software life cycle process, UML based object oriented development process is proposed. This process is composed of 7 steps and 19 activities including development phase, activity and product to improve quality of reliability. Usefulness of object oriented process for improvement of software quality is proved at three ways, which are comparative analysis of process characteristics, SPICE process evaluation and SPICE rick analysis.

  • PDF

MARKETING STRATEGIES OF NAME BRAND APARTMENTS ACCORDING TO THE BRAND LIFE CYCLE

  • Kyung-sook Kim;Hye-sung Park;Young-kon Choi;Jae-Jun Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1076-1082
    • /
    • 2005
  • Breaking from the past convention, most construction firms are lotting out their apartments with their own brand names. They don't have, however, differentiated marketing strategies based on unique brand awareness. Rather, virtual absence of marketing strategies has brought about unfiltered introduction of architectural elements of the competition and excessive advertising efforts. Consequently confusion is at hand for consumers' purchase decision since they are not aware of the differences between the apartments. The purpose of this study is to make consumers have clear brand awareness by presenting appropriate brand strategies based on sound marketing theories for construction firms.

  • PDF

Prediction of City-Scale Building Energy and Emissions: Toward Sustainable Cities

  • KIM, Dong-Soo;Srinivasan, Ravi S.
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.723-727
    • /
    • 2015
  • Building energy use estimation relies on building characteristics, its energy systems, occupants, and weather. Energy estimation of new buildings is considerably an easy task when compared to modeling existing buildings as they require calibration with actual data. Particularly, when energy estimation of existing building stock is warranted at a city-scale, the problem is exacerbated owing to lack of construction drawings and other engineering specifications. However, as collection of buildings and other infrastructure constitute cities, such predictions are a necessary component of developing and maintaining sustainable cities. This paper uses Artificial Neural Network techniques to predict electricity consumption for residential buildings situated in the City of Gainesville, Florida. With the use of 32,813 samples of data vectors that comprise of building floor area, built year, number of stories, and range of monthly energy consumption, this paper extends the prediction to environmental impact assessment of electricity usage at the urban-scale. Among others, one of the applications of the proposed model discussed in this paper is the study of urban scale Life Cycle Assessment, and other decisions related to creating sustainable cities.

  • PDF

원자력발전소 Work Breakdown Structure 개발 (Development of Work Breakdown Structure for Nuclear Power Plant)

  • 조영혁;양명덕
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.52-53
    • /
    • 2014
  • The Work Breakdown Structure (WBS) is a primary tool which provides a framework that defines clear scope of all deliverables throughout the project life cycle. Once the WBS is established in projects, it should allow project team members to measure and manage work performances by the WBS; further, it should provide a reference point when any work scope needs to be redefined. Based on the project information in the Progress and Performance Measurement System (PPMS) of UAE's Barakha Nuclear Power Plant (BNPP) projects, an attempt was made to develop a new WBS which provides hierarchical and systematical decomposition of the total work scope of NPP construction projects while avoiding from the preexistence concept in Korean NPP projects that the WBS is a combination of Physical Breakdown Structure (PBS) and Functional Breakdown Structure (FBS). The unique features of the new WBS are as follows: (1) defined the definition of each level of the WBS, (2) subdivided the WBS into 5 hierarchical levels, and (3) adopted globally used general coding structure. The new WBS provides a basic hierarchical structure for the project scope and can be used as a basic tool for schedule control, performance measurement, project status monitoring, and communication among project participants. In addition, by putting the Work Package (WP) under the WBS, the Earned Value Management System (EVMS) per WP can be utilized for the project.

  • PDF

Disputes in Managing Projects: A Case Study of Construction Industry in Vietnam

  • VO, Khoa Dang;NGUYEN, Phong Thanh;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제7권8호
    • /
    • pp.635-644
    • /
    • 2020
  • The construction industry in developing countries like Vietnam, which incorporates small and medium construction enterprises, is typically more prone to disputes and contract dispute-related lawsuits. A dispute may occur at any time in the life cycle of the project. It is sometimes solved with the intermediation of a lawyer or directly by stakeholders. Understanding the causes of disputes in a construction project not only improves the efficiency of a company but also increases the success of projects. This study was carried out using a questionnaire survey at construction projects in Ho Chi Minh City. Sample data with 117 observations were analyzed to find the disputing factors in construction projects: diversity of working style among the parties; reluctance to work; and poor teamwork. Correlation coefficient on a rank of factors between design consultant and contractor; Design consultant and project owners are positively correlated. The Exploratory Factor Analysis (EFA) analysis identified six groups of factors in construction disputes: cooperation, technology, economics, productivity, information, and behavior. The findings are useful for enterprise practice and provide participants with an overview of sources of dispute. Thus, a more complete risk management plan can be formulated, which will accelerate project progress and improve the likelihood of success.

천연가스 액화용 이중 냉매 팽창 사이클 (Advanced Dual Refrigerant Expansion Cycle for LNG Liquefaction)

  • 김민기;김문규;이기환;김효빈;이동훈;민준호;김진모
    • 플랜트 저널
    • /
    • 제15권2호
    • /
    • pp.46-55
    • /
    • 2019
  • 기존 메탄 & 질소 팽창 사이클의 효율 개선을 위해 2개의 메탄 팽창 공정 (cold composite curve에 변곡점을 하나 더 추가하기 위해 warm & cold 2개 공정으로 나눔)과 1개의 질소 팽창 공정을 사용한 천연가스 액화 사이클을 소개하기 위한 논문이다. 이전 질소 팽창 사이클 및 메탄 & 질소 사이클과 비교했을 때, 13.92 및 13.13에서 12.08 kW/ton/day로 효율이 8~15% 정도 개선되었다. 순 현재가치(NPV) 기준으로 한 수명 주기 비용 분석(LCC analysis) 또한 약간의 CAPEX 증가는 있지만 프로젝트 순 현재가치가 개선된 결과를 보여준다.