• Title/Summary/Keyword: Project Life-cycle

Search Result 479, Processing Time 0.025 seconds

A Study on the Necessity of Verification about depot level maintenance plan through the Weapons System cases analysis (무기체계 사례 분석을 통한 창정비개발계획안 검증 필요성 연구)

  • Ahn, Jung-Jun;Kim, Su-Dong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.2
    • /
    • pp.76-82
    • /
    • 2019
  • This study has done to search for a solution to remove risk limitedly caused by separating weapon system acquisition from operation and maintenance at the view point of Logistic Commander who's responsible for stable operation and maintenance after acquiring weapon system. At the System development stage, unverified overhaul development plan may cause additional manpower and costs after the development, and furthermore it is likely to have risk to lower reliability of the military. Thus, research and development agency should write overhaul development plan at the System development stage, and it should be verified through evaluation and verification test. Secondly, during research and development, institutional supplementation is needed to calculate human and material resources writing overhaul development plan. Thirdly, it should be able to analyze proper operation & maintenance plan and cost for overhaul plan at the pre-investigation stage. Fourthly, the base which can develop overhaul concept and overhaul factors should be included in the need and need determination document. Lastly, for the weapon system which has small amount of high power figure, project management should be performed to be able to specify at the each acquisition level of weapon system to realize Article 28, clause 3 and 4 of Defense business law.

A Study on the FIDIC Conditions of Contract for Design, Build and Operate Projects (FIDIC의 DBO 프로젝트용 표준계약조건에 관한 연구)

  • Choi, Myung-Kook
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.46
    • /
    • pp.29-60
    • /
    • 2010
  • The incentive and reasons to publish FIDIC Conditions of Contract for Design, Build and Operate Projects(DBO Form) are manifold. It is partly a response to the increasing need for sophisticated project delivery methods in both the public and private sectors and the already widespread use of the FIDIC Yellow Book with operation and maintenance obligations and partly a response to the challenge to decrease maintenance cost to a minimum by means of a new procurement route. As a result, FIDIC has developed a new model form to meet this market place requirement. On the other hand, FIDIC did not simply adapt the Yellow Book but has developed a new form from it, whilst preserving the style of the already known FIDIC Forms and maintaining the wording where it was not necessary to change it for the purposes of a DBO Form. Moreover DBO Form fills up supposed gaps in other FIDIC Forms and ameliorates the claim management and dispute management framework. FIDIC DBO approach may be shortly summarized as follows. First, DBO Form provides for single project responsibility. Second, DBO Form has the clear objective of ensuring the use of a most reliable and efficient technology at the lowest life-cycle cost. Third, DBO Form is intended to operate as an effective quality increase in the design and construction of projects. Fourth, DBO Form is intended to provide significant benefits with regard to system integration and reduction of risks. Fifth, DBO Form accelerates and enhances completion schedule compliance. Sixth, DBO takes care of all three supporting pillars of sustainability(including economical, environmental and social elements). DBO Form is obviously a good starting point for negotiations and the preparation of calls for tenders, thus saving the parties time and money. However, existing cultural and legal differences, particular local conditions and the particular needs of some branches of the industry may require the form to be adapted according to the particular needs of a project. And Civil law practitioners are strongly recommended to verify carefully the underlying legal concepts and background of each clause of the General Conditions in order to avoid unnecessary and sometimes unnatural changes and amendments being made. Note that when preparing the Particular Conditions ensure that terminology is consistent and that existing inherent concepts should not be ignored.

  • PDF

Developing a Program Performance Management Framework for Mixed-use Development in Urban Regeneration Projects (입체복합공간 개발사업의 프로그램 성과관리 체계 구축)

  • Lee, Kang-Wook;Hong, Hwa-Uk;Park, Hee-Dae;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.141-152
    • /
    • 2011
  • The market volume of urban regeneration projects has steadily increased, thereby mixed-use development also shows significant market growth. However, previous researches on urban regeneration mainly deduced suggestions and plans for institution improvement based on comparison between projects implemented the inside and outside of the country. Whereas, researches on project management closely related to project success were limited, particularly in performance management. Accordingly, this research aims at developing a program performance management framework for public clients so as to succeed mixed-use development projects. Through extensive literature review and expert interview, this research developed performance indices for diverse facilities, risk management framework and integrating method of program performance score. The proposed framework is able to consider total life cycle from basic planning to maintenance phase and to check real-time performance level. Moreover, risk management framework can periodically assess and control the level of inherent risks within performance indices. The results can contribute to improve existing performance management practices and be basis for a web-based system developed in future.

An Index for Measuring the Degree of Completeness of BIM-based Quantity Take-Off (BIM기반 물량산출 완성도 측정을 위한 지수 개발)

  • Lee, Chang-Hee;Kim, Seong-Ah;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.79-92
    • /
    • 2011
  • Quantity take-off is one of the critical tasks that determine the cost of a construction project, and its result should be accurate and reliable. BIM-based quantity take-off is a very attractive process for practitioners since the quantity take-off can be done automatically in a fast and accurate way. However, the result of BIM-based quantity take-off can be varied depending on how BIM was modeled. As a project progresses, more detailed design information is getting available, and it can be expected that the degree of completeness and accuracy for the BIMbased quantity take-off is going to be improved as well. However, when estimation is performed at each stage of a project life-cycle, there is no way to measure or forecast how accurate of the quantity take-off result from the BIM data given at the current stage. Therefore, this research derived factors that affect the BIM-based quantity takeoff and developed a methodology and framework to measure and forecast the completeness of BIM-based quantity take-off. The measurement framework and index that are proposed by this research was verified and validated for their consistency and feasibility through six pilot projects.

Decision Support Process Model for Energy Efficient Remodeling Projects focused on Building Envelope and Renewable-energy Systems (에너지절감형 리모델링을 위한 적정 대안 선정 프로세스 모델 - 건축물 외피 및 신재생에너지 시스템을 중심으로 -)

  • Shin, Young-su;Cho, Kyuman;Kim, Jae-youn
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.91-100
    • /
    • 2015
  • An increase in energy such as natural gas, coal, oil, has occurred to a large amounts of environment impact emissions, it is necessary to reduce in the construction industry for the energy consumption. To encourage remodeling project in developed countries of the majority, on the basis of this, remodeling project in the construction industry has grown to a large amount. Results of analysis of the research related to the advanced remodeling, analysis of the economic validity in accordance with the production and process and building elapsed years of selection alternative of remodeling there has been a problem that has not been properly reflected. In this study, a decision support model that can simultaneously choose the most cost-effective and energy-efficiency alternative. Developed process model, generates a "Remodeling Solution" that combines the renewable energy equipment and envelope system, energy performance evaluation of the application of international standards(ISO-13790, DIN V 18599), perform the economic evaluation through LCCA(Life Cycle Cost Analysis) technique, circulated evaluation and configured to output the optimal Remodeling Solution. The results of applying the model developed in the case, it was confirmed that it is possible to select a choice of cost-effective energy-saving alternative. Then, developed model through this study, it is expected to be able to help highly effective remodeling alternative to selecting by decision-makers.

Open BIM-Based Quality Control for Enhancing the Design Quality in the Architectural Design Phase (건축설계 단계에서 설계품질 향상을 위한 개방형 BIM기반 품질관리 방안)

  • Seo, Jong-Cheol;Kim, Han-Joon;Kim, In-Han
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.3-15
    • /
    • 2012
  • Currently, Building Information Modeling (BIM) is an emerging technological shift that involves applying and maintaining an integral digital representation of all building information for different phases of the project life-cycle. Although BIM has been recognized as a main stream in the construction industry, it is difficult to ensure the quality of BIM data due to the problems such as internal errors of BIM tools and lack of guidelines considering design quality. Such problems give lots of difficulties to BIM adoption for designers, constructors, and owners. Therefore, it is necessary to develop the requirements including the object-oriented modeling method and property definition by applying the Industry Foundation Classes (IFC) which is an ISO/PAS 16739 standard for ensuring the quality of BIM data. This research aims at proposing the requirements considering the quality of BIM data and demonstrating the efficiency of the requirements with using the Solibri Model Checker (SMC) which is a quality control tool in a case study.

Design of Test-Effort Estimation Model (소프트웨어 시험노력 추정 모델의 설계)

  • Kim, Hankyoung
    • Journal of Internet Computing and Services
    • /
    • v.14 no.1
    • /
    • pp.23-30
    • /
    • 2013
  • Test effort estimated so far is as a by-product of the development effort estimation activity which is based on the FP, UCP, COCOMO model, or calculated data from the project knowledge base which is containing test effort information for the test phase on software development life cycle. In this paper, test effort estimation model and calculating procedures are suggested, which is independent from software development effort estimation model. Generally test efforts is depends on the number and the complexity of test cases, and also maturity of test organization that performs test activities, such as integration test, system test, acceptance test and so on. The estimated results with the suggested test effort estimation model has deviation of 4.7% compare to the corresponding test efforts generated by the development effort estimationprocedures. The suggesting model will be accurate more and more with refinements of coefficients which reflect the technical and environmental maturity level of test organization, and also including the software complexity level of projects.

Applying Lean, Green, and Six-Sigma Framework to Improve Exterior Construction Process in Saudi Arabia

  • Banawi, Abdul-Aziz;Bilec, Melissa
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.2
    • /
    • pp.12-22
    • /
    • 2014
  • Over the last decade, Saudi Arabia has experienced significant economic increases as evidenced by the 30% growth in its gross domestic product; furthermore, the construction industry has increased 10% in the same time period. Due to this significant growth, the construction industry is encountering issues related to construction quality resulting in significant waste and associated environmental impacts. In this research, we applied our previously developed framework that integrates three different methods-Lean, Green, and Six-sigma - to a residential construction complex in Saudi Arabia. Our aim of this case study was to explore the application of the framework in practice to glean quantitative results and further validate the framework. In the case study, we used the developed framework to identify a significant issue related to quality and delays - final completion of 53 residential units was delayed because of failed exterior buildings surfaces. We then used the framework to define the causes behind the defects via a field investigation of the 53 units. Of the defect, construction execution was responsible for 43% of the defect, 31% untrained workers, 19% unfavorable construction weather condition, with 7% accounting for other issues. A procedure was developed in concert with the construction manager and overall developer reducing the amount of rework and waste causes revealed by the field examination and the framework. Although two steps were added to the original construction process to overcome waste causes, still save a lot of resources and reduces environmental impact. In summary, we found that the Lean, Green, Six-sigma framework increased productivity, quality, and reduced waste.

Analysis and Framing of Dietitian's of Description (영양사 직무기술서 작성 연구)

  • Mun, Hyeon-Gyeong;Lee, Ae-Rang;Lee, Yeong-Hui;Jang, Yeong-Ju
    • Journal of the Korean Dietetic Association
    • /
    • v.7 no.1
    • /
    • pp.87-104
    • /
    • 2001
  • This study was conducted as a part of the project developing the standards of national board test for the dietitian's licence. The purpose of this study was to define the job description of dietitians, and to describe the task elements based on the detailed analysis of the dietitians' work. This study team established the research team which was composed of food and nutrition experts, 7 of registered dietitians and 3 of university professors. Draft job description form was made to fully explain the dietitians' task elements, process and sequence by the research team. Final job description form was confirmed after the validity of 576 task elements was reevaluated upon 4 point scale test based on the frequency, importance, and difficulty by 21 field registered dietitian by the study team. It was also confirmed by the university. This form was formated by following DACUM method which analyzed the job description containing duty, task and task elements. It was organized to include every dietitians' work and to describe the every detailed process of work. Duty was defined as the specific and independent work as a dietitian, and was composed of 17 parts, i.e 10 parts in food supply management area and 6 parts in nutritional care service area and self promotion area. Duties were also divided into 99 tasks containing the 576 detailed task elements to describe definite action, steps and decisions. Seventeen parts are following; menu planning, storage and inventory control, food production, meal service, waste management, sanitation, equipment and facility management, human resource management, financial management, nutrition assessment of life cycle, nutritional assessment of several disease, nutritional assessment in specific condition, medical nutrition therapy, nutritional education, public health nutrition and self promotion. If these protocols are properly performed and presented, they can provide the likelihood that dietetics professionals work as a primary contributors in promoting health care and preventing disease nationally.

  • PDF

LCA-based Environmental Impact Analysis for Prestressed Concrete Girders (프리스트레스 콘크리트 거더의 LCA기반 환경영향 분석)

  • Choi, Gyeong-Chan;Kim, Do-Hoon;Park, Jin-Young;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.1
    • /
    • pp.69-76
    • /
    • 2020
  • Bridges which are components of road network consume large amounts of resources such as concrete and steel materials, which have large environmental impacts during construction. This causes a great environmental burden. In order to reduce the environmental impact caused by the construction of the bridge, the environmental impact should be reviewed based on reasonable data in the early design stage. The purpose of this study is to provide basic data for LCA-based environmental impact assessment in the process of selecting bridge type in the early design stage. For this purpose, design data for four types of PSC bridges (general PSC girder, IPC girder, e-Beam, DR girder) were collected and LCA was performed to analyze the basic unit value and impact factors of environmental load. The results of the analysis showed that the environmental impact of IPC girder was the smallest, and the environmental impact of e-Beam was 133.7% higher than that of IPC girder. In addition, concrete, reinforcement, PC strand, square timber, sheath pipe, and steel plate were derived as the main factors that generate 98.5% of the overall environmental impact of PSC girder.