Seismic Analysis Process of Steel Box girder Bridge based on BIM (강상자형 교량의 BIM기반 내진해석 프로세스)

  • Lee, Heon-Min;Lee, Jin-Kyoung;Yoo, Jae-Myoung;Shin, Hyun-Mock
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.24 no.4
    • /
    • pp.421-428
    • /
    • 2011
  • The communication of each others is lack between planing, design, construction and maintenance in domestic construction industry. This problem makes the omission of information and the loss of cost. So, the introduction of BIM can be the solution about that. BIM manages all information generated during all life-cycle of a structure and consequently maximizes the efficiency of utilizing information. This is done through 3D information model associated with a three-dimensional(3D) parametric CAD. This study proposes the seismic analysis process of steel box bridge for structural design of bridge construction project based on BIM. The additional process is needed for the purpose that structural data is inherent in the property information of 3D information model. This process has 3D modeling progress done by using the information decided in design phase. The design document of seismic analysis can be derived with the proposed process to steel box bridge.

A Study on the Utilization Improvements by Function Analysis of the Construction CALS (건설 CALS 시스템의 기능분석을 통한 활용성 개선방안 연구)

  • Kang, LeenSeok;Han, DongHo;Park, NamJin;Moon, HyounSeok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3D
    • /
    • pp.441-450
    • /
    • 2011
  • Recent construction projects consist of large and complex facilities, which project management information system (PMIS) is used for managing construction cost and schedule. The ministry of land, transport and maritime affairs (MLTM) is using a continuous acquisition and life-cycle support (CALS) system for managing the public construction projects. This study attempts to survey some problems of the CALS system in practical application, and then suggests the new functions to improve practical application of the CALS system. All functions in each menu were analyzed in the practical application aspect. All projects ordered from MLTM should use the CALS system as a PMIS, but the practical application is limited in partial functions and special working group. And the utilization of system is focused on simple tasks and report process. One of main reason is that the system is using numerical data rather than graphical data. This study suggests new functions and a visualized management method that can improve the practical applicability using a 4D object in each current functions.

Considering Performance Measurement and Life-Cycle Costs for Andong Culture & Art Center BTL Project (VE기법을 적용한 안동문화예술회관 민간투자사업의 성능개선 사례연구)

  • Kim, Seong-Il;Lee, Kwang-Mo;Choi, Seok-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1005-1010
    • /
    • 2007
  • According to revision of Construction Technology Management Act (2005), the government ordering construction which cost is more than 10billion won should investigate the value engineering(VE) of a construction. In this sense, the government actively promote plans in 2008 after identifying the examining standards of the investigation on the VE(2007). It is substantial issue to introduce Pre-Qualification(PQ) in oder to restrain unlicensed VE consulting companies or VE consultants. This system will contribute to the quality and the settlement of the value engineering in our country. The reason why the Korea VE Society founded in 2006 is one of the afore-mentioned reasons. Therefore, we try to establish the value engineering of Build-Transfer-Lease Scheme by providing the practical application of construction value engineering and definite procedures through the example of Andong Culture and Art Center's research in one of the various construction fields.

  • PDF

A Study on Information Collection and Idea Creation Using Drones (드론을 활용한 정보수집 및 아이디어 창출에 관한 연구)

  • Jo, Hwani;Yoo, Jaewon;Choi, Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.1
    • /
    • pp.117-124
    • /
    • 2024
  • The objective of Value Engineering (VE) is to derive the optimal value at the most efficient life cycle cost, comprising three stages: Pre-Study, Study, and Post-Study. In this study, we propose a method for information collection and analysis during planned site visit surveys in the preparation stage of VE. The 3D spatial model, created using a drone, facilitated observation and analysis of the study area from various angles, both from the center and the outside. Additionally, through the utilization of drones, we conducted on-site investigations of the research area's 3D spatial model, enabling a macroscopic perspective previously only feasible through a microscopic viewpoint during planned site visits in the pre-study phase. Furthermore, the utilization of actual spatial data obtained from observations allowed for real-time information verification during Design VE workshops, enhancing the efficiency and reliability of the VE project.

Development of Measurement and Evaluation Process for Risk-based Configuration Factors in Mixed Used Development in Urban Regeneration Projects (복합용도 도시재생사업에서의 리스크 기반 변화요인 측정 및 평가 프로세스 개발)

  • Son, Myung-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.94-106
    • /
    • 2012
  • In recent years, the risks and uncertainties associated with mixed used development in urban regeneration projects which have actively been implemented at home and abroad have been on the rise due to the uncertainties of the initial business plan, difficulty of financing, increase in total cost and schedule delay. To cope with rapid social and economic changes and optimize benefits, a risk-based configuration management process that considers life cycle is required, along with accurate planning in the early stage of the business. In addition, it is necessary to prepare measures that can respond to the evaluation and measurement of the configuration factors in relation to the business process. However, the focus of previous studies on configuration management in the field of construction was mainly on humanities and the sociological aspects such as organization, leadership, ideology and similar concepts. There has been limited research on the process and measurement and evaluation methods for configuration factors required in decision-making on the risks and changes that can occur in the actual project implementation phase. Accordingly, in this study, we defined risk-based configuration factors and developed a process and MECA/3DAM/CII methodology to measure and evaluate these factors so as to carry out systematic configuration management of mixed used development in urban regeneration projects.

Status of Economics Analysis Using LCC in Turn-Key Project : Focus on Landscape Architecture (설계시공일괄발주(턴키) 설계에서 LCC를 활용한 경제성 분석 실태: 조경분야를 중심으로)

  • Yoon, Yong-Han;Kim, Jeong-Ho
    • Journal of Environmental Policy
    • /
    • v.10 no.4
    • /
    • pp.39-59
    • /
    • 2011
  • In this article, I would like to analyze the conditions in applying the LCC method for each construction type by selecting 10 apartment complexes among the Turn-key projects which have been ongoing for the last 5 years. In addition, this article will identify the problems to the application of double landscape architecture and suggest improvement measures. Among the 10 case targets, a total of 151 LCC analyses were conducted, and the average application ratio placing for each construction type was shown in the following order: architecture (34.4%)> electricity (21.2%)>machine (18.5%)>civil engineering (13.2%)>landscape architecture (12.6%). As numbers show, landscape architecture was the lowest. The ratio of LCC reduction amount was shown in the following order: machine (32.1%)> architecture (23.9%)>electricity (23.4%)>civil engineering (17.5%)>landscape architecture (3.1%). The field of landscape architecture had a reduction amount that was about 5 to 6 times lower than civil engineering which had a similar number of LCC analysis cases. The total LCC analysis items of landscape architecture was 19, including 15 double packing material, 1 building covering, 1 grass planting, 1 planting infrastructure, and 1 facility. The following measures were suggested to promote LCC analysis in landscape architecture: first, set an analysis item that considers the construction expense ratio of landscape architecture; second, legal regulation of landscape architecture and expansion of its application; third, prepare VE/LCC standards which are suitable for landscape architecture.

  • PDF

A Study on the Design Value Analysis Methodology for Bridge Structure Using Reliability Analysis (신뢰성 해석을 이용한 교량구조물의 설계VA기법 연구)

  • Kim, Seong-Il;Lee, Kwang-Mo;Choi, Suk-Won;Jung, Jun-Hwa;Kim, Seong-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.114-125
    • /
    • 2009
  • In this study, a design value analysis technique that considered stochastic LCC and stochastic performance evaluation was proposed, and by introducing the concept of reliability analysis, a decision making that secured reliability was supported. The results of this study, which was carried out according to the above objectives and methods, are summarized as follows: 1) The design value analysis procedures and value state function, improved in order to carry out a reliable analysis when evaluating alternate proposals that were extracted after the function definition was complete, were formalized, and in order to secure consistency and efficiency for value evaluation procedures, an evaluation index scheme was proposed; 2) Database collection and analysis were done for a bridge's LCC analysis. As for the collection scope of data, literature of previous research done on a bridge's LCC analysis was used as the basis for analysis, and for securing reliability regarding analysis results and dealing with uncertainty of collected data, the MCS technique was applied; 3) Weights and evaluation ranks for performance evaluation of each of the alternate proposals, as well as LCC analysis model, analysis period, discount rate, user expense, safety inspection and safety diagnosis expense conditions for LCC analysis were proposed. Lastly, a feasibility study was done and conclusion was made about "OO grand bridge and connecting road construction work execution design" project centered on value analysis execution case.

A Case Study of BIM-based Framework on Constructability Tasks (BIM기반 골조공사의 시공성분석 업무 적용사례에 관한 연구)

  • Lee, Seung-Il;Kwon, Nam-Ha;Cho, Young-Sang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.45-54
    • /
    • 2010
  • Recently more and more construction projects have become high-rise, complex and intelligent. Accordingly, such projects require an integrated management system for tasks, with a lean approach to construction with work processes for management and productivity. In particular, Construction Information Technology (CIT) fields are concerned with Building Information Modeling (BIM), which represents the process of generating and managing building data during its life cycle. Constructability research has progressed for the project goal which is a cost-time-quality of optimization by integrated construction knowledge and experience. However, the current constructability process has not been performed efficiently, as the existing 2D drawings and papers lack consistent and accurate information, it is difficult to share the contents of work, and the use of information is inefficient. This study proposes that the reformation and enhancement of BIM-based constructability work process can lead to brilliant performance in the framework of the construction phase through achieving collaboration between the design team and the workers at the site.

Strategy for Various CM Applications based on Comparative Case Analysis (사례 비교분석을 통한 CM 적용 다양화 방안 - 발주자 특성 및 사업특성을 중심으로 -)

  • Kim, Namjoon;Jung, Youngsoo;Kang, Seunghee;Shin, Dongwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.10-17
    • /
    • 2016
  • Domestic CM market has continued to grow since the enactment of CM policies in 1996. In addition, future CM market is forecasted to have potential high growth. Therefore, it is necessary to apply various CM business models reflecting the owner's requirements and characteristics in order to improve in the CM industry and to strengthen the competitiveness in the overseas construction market. In this context, the purpose of this study is to suggest strategies of various CM applications based on comparison of 4 cases analyzed by 'business weight' and 'business depth' in terms of business function as well as by the types of 'CM market' and 'CM practice'. Result of this comparative analysis shows that each case presents differences in terms of type, business weight, and business depth of CM practice. However, domestic public CM services are currently being challenged to strengthen capability throughout the project life-cycle against the limitation of government's CM policies focused on the construction supervision. In order to address this problem, this study proposes the strategies of various CM applciations from several different perspectives

The Performance of the National Authorization System of Private Qualification (강건설계방법을 활용한 창의적 문제해결 실습과정)

  • Kim, Tai-Oun
    • Journal of Engineering Education Research
    • /
    • v.11 no.1
    • /
    • pp.64-75
    • /
    • 2008
  • A new product development and product realization process (PRP) is a circulating and feedback process by generating ideas through creative problem solving process. The early stages of PRP correspond to conceptual design and product development, in which a large portion of product life cycle cost can be saved. The optimal design method for this stage is a robust design suggested by Taguchi. Quality must be 'engineered in' since it can not be 'inspected out.' A robust design is an engineering methodology to improve the quality of a product by minimizing the efforts of variations without eliminating the causes. The objective of this study is to propose a scheme and a case study of robust design for exploring design parameters, and introduce a creative problem solving process. Major research subjects include a creative problem solving process, robust design procedure and their implementation. For the experiment of Taguchi method, a toy catapult is adopted. For the creativity development, a short project is assigned to devise a similar tool with the toy catapult. A reference model is suggested to compare and evaluate their ideas.