Evaluation of Management Performance for Heritage Buildings Case Study: Greco-Roman Museum - Alexandria, Egypt

  • Adel El-Menchawy;Wael Kamel;Amal Mamdouh;Mirna Eskander
    • Architectural research
    • /
    • 제25권3호
    • /
    • pp.41-51
    • /
    • 2023
  • Building restoration is a complex process with a high level of uncertainty. Restoration professionals can significantly benefit from the well-established discipline of project management to achieve their targets; however, available evidence shows that the use of the project management body of knowledge in restoration projects is far from the desired level. Several historical organisations have since been established with the goal of preserving and governing cultural identity, and numerous studies have supported the need of preserving architectural heritage. Many owners, investors, academics, and developers believe that it would be considerably more expensive to renovate and restore an old building than to create a new one. Although the project management process is generally recognised, the concept of project management for architectural heritage projects differs due to the uniqueness of each project. It differs from many construction projects in terms of the need for research-based practices to define scope, planning, scheduling, supervision,decision-making,and also performance. The Greco-Roman Museum in Alexandria's planning, design, and building phases are being studied with the aim of identifying and analysing the variables that contribute to project delays. Three project management pillars were established as a result of gathering this data from the project's stakeholders: the first pillar addresses time management for the existing phase and how it will be incorporated into the new extension phase; the second pillar addresses performance in relation to project management issues in the delivery of the best quality of a construction project; and the third pillar addresses the scope of the new extension because it will significantly impact the other two pillars. This paper argues that a contemporary perspective which utilizes project management tools and techniques can contribute to the conservation of architectural heritage in line with the conservation principles.

COMPENSATION STRUCTURE AND CONTINGENCY ALLOCATION IN INTEGRATED PROJECT DELIVERY SYSTEMS

  • Mei Liu;F. H. (Bud) Griffis;Andrew Bates
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.338-343
    • /
    • 2013
  • Integrated Project Delivery (IPD) as a delivery method fully capitalizes on an integrated project team that takes advantage of the knowledge of all team members to maximize project outcomes. IPD is currently the highest form of collaboration available because all three core project stakeholders, owner, designer and contractor, are aligned to the same purpose. Compared with traditional project delivery approaches such as Design-Bid-Build (DBB), Design-Build (DB), and CM at-Risk, IPD is distinguished in that it eliminates the adversarial nature of the business by encouraging transparency, open communication, honesty and collaboration among all project stakeholders. The team appropriately shares the project risk and reward. Sharing reward is easy, while it is hard to fairly share a failure. So the compensation structure and the contingency in IPD are very different from those in traditional delivery methods and they are expected to encourage motivation, inspiration and creativity of all project stakeholders to achieve project success. This paper investigates the compensation structure in IPD and provides a method to determine the proper level of contingency allocation to reduce the risk of cost overrun. It also proposes a method in which contingency could be used as a functional monetary incentive when established to produce the desired level of collaboration in IPD. Based on the compensation structure scenario discovered, a probabilistic contingency calculation model was created by evaluating the random nature of changes and various risk drivers. The model can be used by the IPD team to forecast the probability of the cost overrun and equip the IPD team with confidence to really enjoy the benefits of collaborative team work.

  • PDF

프로젝트팀 활성화를 위한 개인성향과 프로젝트 성공 요인에 대한 연구 -ERPProject중심으로- (A Study on Project Success Factors and Individual Personality for Project Team Activation - Based on ERP Project -)

  • 박종기;강경식
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2006년도 추계공동학술대회
    • /
    • pp.279-286
    • /
    • 2006
  • Since 1990's, many enterprises have implemented ERP System. Especially, they want to become an advanced company use ERP implementation. Already, ERP system come to high level which is stabilized and support independent business process of many industry sectors. Although most companies had previous good plans, but those are not satisfied. Because of failed to change management and had many problem about Project team operation. Therefore, important success factors for ERP project are change management and organization activation for Project team. The purpose of this study is suggest to improve method about team activation through analysis the Project team member's individual personality as a factor that makes the success of Project team. This paper studied success factors of project team and plan for organization activation. The results of this study can be used for a successful implementation of the ERP system as make of Project team consider of individual personality and administer a Project team.

  • PDF

농촌생활환경정비 대상 시설항목의 선정: 정책적 제안 (The Policy Proposal for Selecting Facility-stems of Rural Living Environment Renewal Program)

  • 윤원근;이상문
    • 농촌계획
    • /
    • 제4권2호
    • /
    • pp.8-19
    • /
    • 1998
  • The problem of outdated and surplus facility-items in existing Rural Living Environment Renewal Program(RLERP) makes this study focus on restricting the range of facility sorts for the purpose of coㅁins with the changing rural living environment. In the four aspects of plan establishment, project implementation, comprehensiveness and linkage between programs, this study made an analysis of the existing RLERP that has 4-stage hierarchy, namely, Gun(county), Myun(primary administrative district), village and project site level Firstly, Myun and upper level policy programs fulfill the comprehensiveness and planning aspects, but have defects in the implementation and linkage aspects. Secondly, the village level programs satisfies more or less the four condition, but give rise to the problems of equity between the project target village and the non-target, and of generalization of the planning method applying to a specific village. At last, project level programs, controlled by several ministries, have defects in comprehensiveness and linkage aspects, exposing the sectoralism of central government. Above all, the existing RLERP has so many facility items, which have led to inefficient investment till now. Therefore, it's necessary that the environmental facilities should be selected(simultaneously reduced ), referring to following 5 criteria. (1) Exception of facilities relating to agricultural production. (2) Confined to public facilities to be constructed by government support. (3) Common-use facilities located in small town and below level area. (4) Consideration of not only the present need but also the future need of rural residents. (5) Reflection of a regional difference of mountain, plane and suburban area. Just 13 kinds of living environmental facilities are finally selected as the result of the selecting work, which can be an new alternative for RLERP. Concludingly, the selected facility items should be integrated into a designated project site by the prepared plan in order to enhance the efficiency of RLERP, investment and also to satisfy the four analytic aspects mentioned above.

  • PDF

A NESTING APPROACH IN DISCRETE EVENT SIMULATION FOR INTEGRATING CONSTRUCTION OPERATION AND SCHEDULE MODELS

  • Chang-Yong Yi;Chan-Sik Park;Doo-Jin Lee;Dong-Eun Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.400-408
    • /
    • 2009
  • Simulation applications for analyzing the productivity of construction operations at operation level and project schedules at project level are crucial methods in project management. The application at two different levels should be very tightly linked to each other in practice. However, appropriate integration at the levels is not achieved in that existing systems do not support to integrate operation models into a schedule model. This paper presents a new approach named to Discrete Event Simulation-Nesting modeling approach, which supports not only productivity analysis at operation level but also schedule management at a project level. The system developed by the authors allows creating operation models at the operation level, maintaining them in operation model library, executing sensitivity analysis to find the behaviors of the operation models when different combination of resources are used as existing DES systems do. On top of the conventional functions, the new system facilitates to find the optimum solution of resource combinations which satisfy the user's interest by computing the hourly productivity and the hourly cost of the operation. By drag-and-dropping an operation model kept in the operation model library, the operation models are integrated into an activity of the schedule model. When a complete schedule model is established by nesting operation models into the schedule model, stochastic simulation based scheduling is executed. A case study is presented to demonstrate the new simulation system and verify the validity of the system.

  • PDF

자원제약하의 복수 프로젝트 일정계획을 위한 휴리스틱 알고리즘 (A Heuristic Algorithm for Resource-Constrained Multi - Project Scheduling)

  • 공명달;김정자
    • 산업공학
    • /
    • 제13권1호
    • /
    • pp.110-119
    • /
    • 2000
  • Resource-constrained project scheduling is to allocate limited resources to activities to optimize certain objective functions and to determine a start time for each activity in the project such that precedence constraints and resource requirements are satisfied. This study suggests a multi-project scheduling model which can level work loads, make the most of production capacity and restrain the delay of delivery by developing a heuristic algorithm which minimizes the project completion time and maximizes the load rate under resource constraints.

  • PDF

노인일자리 사업의 교육 만족도가 사업효과성에 미치는 영향 : 일자리 만족도의 매개효과 (The Impact on the Business Effectiveness of the Educational Satisfaction in Elderly Employment Program: The Mediating Effect of Job Satisfaction)

  • 신계수;권승숙
    • 벤처창업연구
    • /
    • 제10권5호
    • /
    • pp.105-115
    • /
    • 2015
  • 본 연구는 노인일자리 사업에서의 교육 만족도가 사업효과성에 어떠한 영향을 주는지 살펴보고, 참여자 교육 만족도가 일자리 만족에 영향을 미처 궁극적으로 사업효과성에 미치는 영향을 검증하였다. 본 연구는 2013년 수행된 한국노인인력개발원의 노인 일자리사업 참여노인 실태조사의 원자료를 활용하였으며, 사업유형, 지역규모, 시도 등을 고려한 비비례층화표본 추출방법을 활용하였다. 조사대상에서 세종시는 제외하였으며, 이들 중 본 연구 문제와 관련한 문항에 무응답 또는 응답 비해당자를 제외시킨 2,005명을 대상으로 하였다. 수집된 자료는 SPSS WIN 21.0 프로그램을 이용하여 분석하였다. 분석기법으로는 연구대상자의 일반적 특성을 파악하기 위해 빈도와 백분율을 산출하였다. 또한 교육 만족도가 노인일자리 사업의 사업효과성에 미치는 영향을 알아보기 위해 회귀분석을 실시하였으며, 교육 만족도가 노인 일자리 사업의 사업효과성에 미치는 영향에서 일자리 만족도의 매개효과를 알아보기 위계적 회귀분석을 실시하였다. 본 연구의 주요 결과는 다음과 같다. 첫째, 교육 만족도가 사업효과성에 미치는 영향 중 심리적 효과에는 교육내용의 흥미도와 교육의 직무 활용도 모두가 유의미한 영향을 미쳤으며, 신체적 사회적 효과에는 교육내용의 흥미도가 유의미한 영향을 미쳤으며, 경제적 효과에는 교육의 직무 활용도가 유의미한 영향을 미쳤다. 둘째, 교육 만족도가 사업효과성에 미치는 영향에서 일자리 만족도는 교육 만족도가 심리적 신체적 사회적 효과에 미치는 영향에서 부분매개효과가 있음을 알 수 있다. 일자리 만족도는 교육 만족도가 경제적 효과에 미치는 영향에서 완전매개효과가 있음을 알 수 있다. 또한 일자리 만족도는 교육 만족도가 사업효과성에 미치는 영향에서 부분매개효과가 있음을 알 수 있다. 결과적으로 일자리 참여자들의 요구에 맞는 교육 내용을 개발하고, 전담 인력을 배치하여 교육이 효과적으로 진행되어야 할 것이다. 또한 일자리 만족도가 사업효과성에 긍정적인 영향을 미친다는 점에서 참여자 스스로 일에 대한 자부심을 충분히 느낄 수 있도록 한다면 사업효과성을 높이는데 크게 기여할 것이다.

  • PDF

건설 프로젝트 리스크 관리 효율성 향상을 위한 성과측정시스템(PPMS) 개발 (Development of Construction Project Performance Management System(PPMS) Considering Project Characteristics)

  • 차희성;김기현
    • 한국건설관리학회논문집
    • /
    • 제14권1호
    • /
    • pp.82-90
    • /
    • 2013
  • 건설 산업의 속성상 프로젝트의 성과를 정량적으로 분석하기 위해서는 다양한 영향인자에 대한 고려가 필수적이다. 프로젝트의 특성과 성과와의 관계를 파악하고, 프로젝트에 가장 적합한 관리기법을 적용시켜서 프로젝트의 성과를 향상시키기 위해서는 성과관련 정보를 축적시켜 관리하기 위한 시스템적인 접근이 요구되고 있다. 그럼에도 불구하고 많은 성과관련 시스템들은 성과결과의 분석에만 치중하여 프로젝트의 특성이나 관리기법 등 성과에 영향을 미치는 인자에 대한 심도 있는 분석방법과 접근방식에 대한 고려 부족으로 인해 성과시스템의 활발한 적용을 기대할수 없었다. 이에 본 연구는 건설 프로젝트의 특성을 고려하여 성과를 사전에 예측하고 성과체계를 정량적으로 모델링할수 있는 성과정보시스템을 개발하는 데 목적을 두었다. 이를 위해 실제 사례프로젝트의 성과관련 정보를 바탕으로 성과결과와 프로젝트 특성, 관리기법 간의 상관관계를 분석함으로써 해당 프로젝트에 가장 적합한 관리기법을 도출할수 있는 방안을 수립하였다. 그 결과, 성과영역별로 다양한 관점에서 프로젝트의 성과비교가 가능할 수 있는 정량화 방안을 정립하였고, 상관관계 분석을 통해 성과예측이 가능한 모델을 제안하였으며, 기존 데이터 분석을 통해 최적 관리기법을 선정할수 있는 시스템을 개발하였다. 웹기반 프로그램으로 구축된 시스템은 향후 데이터베이스의 지속한 관리와 보완을 통해서 성과정보의 양을 확대시킨다면 통계적으로 유의미한 결과를 바탕으로 신뢰성 있는 프로젝트 성과 관리를 도모할수 있을 것으로 사료된다.

건설 프로젝트 효율적 성과관리를 위한 핵심 지표 체계 구축 (Developing Measurement System for Key Performance Indicators on Building Construction Projects)

  • 차희성;김태경
    • 한국건설관리학회논문집
    • /
    • 제9권4호
    • /
    • pp.120-130
    • /
    • 2008
  • 건설산업의 핵심성과는 프로젝트가 추구하는 목표, 즉, 비용, 시간, 품질, 안전, 환경 등의 기준을 어느 정도 달성했는지로 평가할수 있다. 그러나, 프로젝트 기반산업이라고 할 수 있는 건설산업의 경우, 성과에 대한 명확한 정의체계가 부재하고, 성과측정에 대한 표준화된 절차와 관리 방식이 구축되어 있지 않아서 프로젝트의 성과를 객관적이고 합리적으로 평가하기가 매우 어려운 것이 현실이다. 본 연구에서는 프로젝트 차원의 성과에 대한 정의 및 기준을 설정하고, 각 성과기준 댈 지표 산출 방식을 개발한 후, 이들 지표를 통해 정량적으로 프로젝트의 성과를 산출할 수 있는 방법론을 제안하고자 한다. 제안된 성과측정 방법론에 입각하여, 실제 사례 프로젝트를 수집하고, 이들을 비교 분석해 봄으로써, 향후 건설 프로젝트에 적용가능 한지에 대한 평가를 실시하였다. 이를 통해 특정한 건설 프로젝트는 상호 비교가능한 지표의 형태로 변환될 수 있으며, 개별프로젝트의 성과를 종합적으로 분석하는 것이 가능해진다. 또한, 건설 프로젝트 관련자로 하여금 성과에 입각한 관리를 가능하도록 유도하여 건설 프로젝트의 효율성을 진작시키는데 큰 역할을 담당할 수 있을 것으로 기대한다.

A Portfolio Model for National IT R&D Strategy Project Selection Methods

  • Ryu, Dong-Hyun;Lee, Woo-Jin
    • Journal of information and communication convergence engineering
    • /
    • 제9권5호
    • /
    • pp.491-499
    • /
    • 2011
  • In this paper, we offer a new strategic portfolio model for national IT R&D project selection in Korea. A risk and return (R-R) portfolio model was developed using an objectively quantified index on the two axes of risk and return, in order to select a strategic project and allocate resources in compliance with a national IT R&D strategy. We strategize using the R-R portfolio model to solve the non-strategy and subjectivity problems of the existing national R&D project selection model. We also use the quantified evaluation index of the IT technology road map (TRM) and the technical level reports (TLR) for the subjectivity of project selection, and try to discover the weights using the analytic hierarchy process (AHP). In addition, we intend to maximize the chance for a successful national IT R&D project, by selecting a strategic portfolio project and balancing the allocation of resources effectively and objectively.