R & D 프로잭트의 Feasibility 추정 시스템설계를 위한 추정치 종합화 모형의 구축 (A New Model on Integration of Feasibility Estimates for Designing FEIT System in R & D Project)

  • 권철신
    • 한국경영과학회지
    • /
    • 제15권1호
    • /
    • pp.47-61
    • /
    • 1990
  • The purpose of this study is to construct a new model named Communication Consensus Value Weighted (CCVW) model based on inter-personal technical communication within a project team, and to design Feasibility Estimates Integrated Terminal System (FEITS) which is a subsystem of R & D Project Planning System/System Alternatives Feasibility Estimation System (RDPPL/SAFES) using the model as a key function for feasibility estimation in that system. This new model aims to integrate technical feasibility estimated by several estimators in the lowest level as the project work breakdown structure which is the indentical conception of a terminal system in RDPPL. The process to obtain the feasibility estimate integrated is presented in this paper.

  • PDF

글로벌 건설공사의 턴키설계심의제도 성과분석 및 발전방향 (A study on the development direction and performance analysis of design review system in design-build project)

  • 박환표;진경호;이교선
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.95-97
    • /
    • 2011
  • The purpose of this study is to suggest the development direction and performance analysis of design review system in design-build project. As a result of surveys, the fairness and transparency of design review system was abruptly increased. But local government has not fairness and transparency. Therefore this research has proposed the integration management and joint application of design review organization in design-build project. So, we expect that the transparency is raised in management of design review committee.

  • PDF

USING MD CAD OBJECTS TO INTEGRATE INFORMATION FOR CONSTRUCTION PROJECTS

  • Chung-Wei Feng ;Yi-Jao Chen
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.515-519
    • /
    • 2005
  • Most information within a construction project roots in drawings and contract documents. Although several methodologies, such as A/E/C and 4D, have employed such a peculiarity to integrate project information, they failed to integrate information in terms of efficiency and consistency. In this research, a MD (Multi-Dimensional) CAD model is developed to improve the process of integrating information for construction projects. This research describes the processes of creating MD CAD objects and embedding information required throughout the project life cycle within MD CAD building components. In addition, a case study is presented to show the efficiency and effectiveness of using MDIIS (Multi-Dimensional Information Integration System) to integrate information for construction projects.

  • PDF

원자력연구개발 목표관리시스템 개발 (A study on the development of the nuclear R&D performance monitoring system)

  • 박준원;최현호;원병출
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1996년도 춘계공동학술대회논문집; 공군사관학교, 청주; 26-27 Apr. 1996
    • /
    • pp.217-220
    • /
    • 1996
  • This study presents a R&D performance monitoring system (RDMS) that is applicable for managing nuclear program in KAERI. The prime goal of RDMS is to furnish project manager with reliable and accurate information on status of progress, performance and resource allocation, and attain traceability and visibility of project implementation for effective project management. In this study, the work breakdown structure (WBS) as the governing factor for integration of scope, schedule, resource data was derived, and the above parameters were loaded personal computer. A RDMS is comprised of about 12,000 R&D activities of the 16 goverment-led projects. The Primavera software was used to monitor the progress, evaluate the performance and analyze the resource distribution to activities.

  • PDF

한국 건설산업의 전략적 선진 프로젝트 매니지먼트 적용에 대한 연구 (A Study of the Strategic Advanced Project Management Application in the Korean Construction Industry)

  • 박창우
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.572-577
    • /
    • 2008
  • 한국 건설산업의 전략적 선진 프로젝트 매니지먼트 적용을 위해 유럽, 미국, 일본 등 선진국의 프로젝트 매니지먼트 지식체계를 비교 분석하였다. 그 결과 프로젝트 매니지먼트 지식체계의 이론적 배경 기반에는 '전략'의 '실행' 연계가 중요한 공통 이슈로 대두되며, 개별 프로젝트에서 복합 프로젝트를 관리 경영하는 통합 기반의 '프로그램 매니지먼트'와 선택과 집중을 하기 위한 '포트폴리오 매니지먼트'를 연계한 전략기획을 강조하고 있음을 알 수 있었다. 이에 본 연구에서는 한국 건설산업의 전략 실행을 위한 전략적 선진 프로젝트 매니지먼트 적용의 기본틀을 구축하고 현재 한국건설산업에 적용하기 위한 실천방안으로 1) 조직의 전략 실행을 위한 '이념과 철학' 구축으로 글로벌 경쟁력 혁신 2)조직의 문화와 구조를 고려한 전략적 '환경' 구축, 3) 조직의 실현 가능한 목표를 달성할 수 있는 전략적 '비전' 제시, 4)이러한 전략과 연계된 포트폴리오 매니지먼트를 통한 '투자', 5) 포트폴리오를 통한 프로그램, 프로젝트 매니지먼트 '실행' 그리고 마지막으로 이들의 통합체제 구축과 운영으로 '성과' 획득을 할 수 있도록 한국 건설산업의 전략적 선진 프로젝트 매니지먼트를 적용한 지속 가능한 발전 방안을 제시하였다.

  • PDF

무엇이 정보시스템 프로젝트 일정을 지연시키는가? (What Factors Make the Delay of the Information System Project Implementation?)

  • 성병욱;박상철;고준
    • 지식경영연구
    • /
    • 제22권1호
    • /
    • pp.1-19
    • /
    • 2021
  • 대규모 병원정보시스템 프로젝트가 계획 대비 지연되는 경우가 종종 발생하고 있다. 따라서 프로젝트 관리 측면에서 일정 지연을 촉발하는 원인을 검토하고 지연 유발 요인들 간 인과관계 분석이 필요하다. 본 연구는 근거이론 방법론을 활용하여 병원정보시스템 개발 프로젝트 사례에 대한 일정 지연 요인을 발견하고 이들 간의 인과관계를 파악하고자 한다. 연구 결과, '비현실적 일정 수립'은 도미노 현상과 같이 전반적인 일정 지연에 영향을 미치고, '기존 시스템 분석 미흡'은 분석 품질의 저하를 야기하는 반면 '서브시스템 통합 인터페이스 부실'은 설계 품질의 저하로 이어졌다. 본 연구는 학술적인 측면에서 프로젝트 지연에 영향을 미치는 요인을 찾아내고 지연 요인들 간의 인과 관계를 분석하였으며, 실무적 관점에서는 System Integration (SI) 기업, 병원, 프로젝트 관리자 입장에서 프로젝트 일정 지연을 최소화할 수 있는 방안을 제시한 점에 의의가 있다.

Conflict Analysis in Construction Project with Unstructured Data: A Case Study of Jeju Naval Base Project in South Korea

  • Baek, Seungwon;Han, Seung Heon;Lee, Changjun;Jang, Woosik;Ock, Jong Ho
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.291-296
    • /
    • 2017
  • Infrastructure development as national project suffers from social conflict which is one of main risk to be managed. Social conflicts have a negative impact on not only the social integration but also the national economy as they require enormous social costs to be solved. Against this backdrop, this study analyzes social conflict using articles published by online news media based on web-crawling and natural language processing (NLP) techniques. As an illustrative case, the Jeju Naval Base (JNB) project which is one of representative conflict case in South Korea is analyzed. Total of 21,788 articles and representative keywords are identified annually. Additionally, comparative analysis is conducted between the extracted keywords and actual events occurred during the project. The authors explain actual events in the JNB project based on the extracted words by the year. This study contributes to analyze social conflict and to extract meaningful information from unstructured data.

  • PDF

플랜트 건설공사의 벤더관리 발전방향 기초연구 (A study on the development direction for vendor management in plant construction)

  • 박환표;한재구;진경호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.189-190
    • /
    • 2011
  • The purpose of this study is to suggest the development direction for vendor management in plant construction. Therefore this research has proposed the integration management of vendor and information standardization. This research has proposed that plant industry association manage the basic information of vendor. And each company manage the performance evaluation of vendor's firm. Expecially, vendor management system should be developed by ISO information system.

  • PDF

INTEGRATION OF SSM AND IDEF TECHNIQUES FOR ANALYZING DOCUMENT MANAGEMENT PROCESSES

  • Vachara Peansupap;Udtaporn Theingkuen
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.725-731
    • /
    • 2009
  • Construction documents are recognized as an essential component for making a decision and supporting on construction processes. In construction, the management of project document is a complex process due to different factors such as document types, stakeholder involvement, document flow, and document flow processes. Therefore, inappropriate management of project documents can cause several impacts on construction work processes such as delay or poor quality of work. Several information and communication technologies (ICT) were proposed to overcome problems concerning document management practice in construction projects. However, the adoption of ICT may have some limitation on the compatibility of specific document workflow. Lack of understanding on designing document system may cause many problems during the use and implementation phase. Thus, this paper proposes the framework that integrates Soft System Methodology (SSM) concept and Integrated Definition Modeling Technique (IDEF) for analyzing document management system in construction project. Research methodology is classified as the case study. Five main construction building projects are selected as case studies. The qualitative data related to problems and processes are collected by interviewing construction project participants such as main contractors, owners, consultants, and designers. The findings from case study show the benefits of using SSM and IDEF. The use of SSM can help identify the problems in managing construction document in rich picture view whereas IDEF can illustrate the document flow in construction project in details. In addition, the idea of integrating these two concepts can be used to identify the root causes of process problems at the information level. As the results, this idea can be applied to analyze and design web-based document management system in the future.

  • PDF

액티비티 기반의 EVM - PMIS 통합모델 구축 (The Establishment of an Activity-Based EVM - PMIS Integration Model)

  • 나광태;강병희
    • 한국건축시공학회지
    • /
    • 제10권1호
    • /
    • pp.199-212
    • /
    • 2010
  • 국내 건설산업에 있어서 기술과 정보의 기반구조를 확립하기 위하여 몇몇 건설정보관련 법규가 제도화되었다. 그러나 국내 건설정보 분류체계, 공정 공사비 통합관리(EVM), 프로젝트관리 정보시스템(PMIS)은 주요한 문제점을 내포하고 있다. 특히 현행 PMIS의 기능은 시공자 위주의 시스템으로 되어 있고, EVM이 적용되지 않아 발주자를 위한 보고, 분석, 예측기능이 매우 취약하다. 더욱이 EVM과 PMIS가 서로 분리된 체계로 운영되고 있어 발주자가 실시간으로 공정 및 공사비 정보를 확인할 수 없다. 본 연구의 목적은 PMIS가 EVM기능을 제공하고 사업참여자들이 제반정보를 공유할 수 있도록 WBS 구축방안과 EVM - PMIS 통합모델을 제안하여, E-비즈니스 업무환경하에서 PMIS를 효율적으로 운용할 수 있는 틀(framework)을 제공하는 것이다. EVM - PMIS 통합의 핵심은 EVM과 PMIS가 액티비티 기반의 동일한 운영체계를 갖는 것이다. 통합의 원리는 액티비티의 정보항목(field)을 PMIS의 공정 및 공사비관리 기능을 위한 하위모듈을 구성하는 관계형 데이터베이스 테이블(table)의 항목과 연계시키는 것이다. 따라서 액티비티의 계획공사비(PA), 달성공사비(EV), 실투입비(AC), 공정편차(SV), 공정수행지수(SPI), 공사비편차(CV), 공사비지출지수(CPI)는 PMIS의 공정 및 공사비 하위모듈을 위한 데이터베이스 테이블의 항목으로 연계된다.