• 제목/요약/키워드: Project Integration Management

검색결과 328건 처리시간 0.025초

화공플랜트 프로젝트에서 통합관리 소프트웨어 적용에 관한 연구 (A Study on the Application of an Integrated Management Software for a Petrochemical Plant Project)

  • 김윤;이동언;유호선
    • 플랜트 저널
    • /
    • 제6권2호
    • /
    • pp.56-61
    • /
    • 2010
  • In this paper, an integrated management software is developed to promote the business competitive power. The interoperability among the software accounts for an ever growing performance of petrochemical plant project. If the interoperability is built up, company has taken advantages of quality, schedule, cost, and safety by active communication. The advantage of an integrated management software is examined in three aspects. In efficiency aspect, It takes advantage of the saving about the various information and the standard of project performance procedure. In quality, the integration gave aid to a quality improvement through team collaboration and data management within project life cycle. In cost, poor communications between systems waste 30% of project costs. If information could be inputted once and used by all, reductions in delivery time up to 40% were possible. Therefore, 10% savings of engineering cost was also possible.

  • PDF

원자력발전소 생애주기를 고려한 시공정보 관리방안 연구 (Research on the Methode of Construction Information Management Considering the Nuclear Power Plant Life Cycle)

  • 변수진;이상현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.229-230
    • /
    • 2016
  • The Nuclear Power Plant construction industry has the related to Information-integration field. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each life-cycle phase. Particularly this paper related to the construction information of component.

  • PDF

시스템엔지니어링에 기반한 효과적인 리스크 관리 (An Effective Project risk Management Based on Systems Engineering)

  • 강탑;김성철;오정택
    • 시스템엔지니어링학술지
    • /
    • 제7권1호
    • /
    • pp.43-51
    • /
    • 2011
  • SE generally defines approaching ways of conducting identification, verification and integration of an optimized product and process solution to meet customer's needs by leveraging organizational competency in engineering and management. To successfully develop a new product under mass production contract, it is important to efficiently carry out the program by ensuring that three major competencies are secured; core technology, system integration, and program management. For successful implementation of tasks in the three areas, systematic execution is called for, which requires identifying risk factors in advance. In particular, comprehensive risk management role and responsibility is required for program management. Success of a development program is determined by complex elements of human resources, organization culture, and overall competency of an organization in technology and program management, including capability of the program manager. In this paper, a risk management solution is suggested to lead a program to success with a more efficient way through actual risk management by the concept of SE around the above three areas.

수리온 체계개발에서의 시스템엔지니어링 적용사례 (Application of Systems Engineering in SURION R&D Project)

  • 김진훈;이동욱
    • 시스템엔지니어링학술지
    • /
    • 제10권1호
    • /
    • pp.81-86
    • /
    • 2014
  • Systems Engineering application focused on requirement definition and management for SURION System Development Project is described in this paper. To perform the development process effectively based on systems engineering processes; Requirements Definition, Design Review, Configuration Management, Quality Assurance, Data Management, are applied in this project. In this processes, the Stakeholder's Requirements are transferred to Specifications verified with design reviews, prototyping inspections, and integration tests. All engineering data, especially verification plan & results are recorded, and traced to each requirements of system specification in Surion database. Therefore, it could be assured that all requirements of specification are evaluated and verified successfully in Surion Project.

CONNECTING TECHNOLOGY, INDUSTRY AND RESEARCH: A VERTICAL INTEGRAL PROJECT COURSE FOR BIM EDUCATION OPPORTUNITIES

  • F. H. (Bud) Griffis;Mei Liu;Andrew Bates
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.252-259
    • /
    • 2013
  • Building Information Modeling (BIM) is utilizing CAD technology in a way that ultimately ties all the components of a building together as objects imbedded with information, and has been changing the way we design and build over the last 20-30 years. In Polytechnic Institute of NYU, there are four BIM courses offered which provide students with different levels of knowledge regarding BIM Technique, BIM Standards, BIM Guideline and Roadmap for Private and Public Implementation, BIM Application in Real Projects, the Cooperation of BIM and IPD for Public Works in New York City. With advanced BIM technology, BIM's integration into the construction process and its incorporation into project delivery systems, especially Integrated Project Delivery (IPD) are the bridges between technology, industry and research. This paper presents an integrated BIM curriculum with three modules: 1) BIM functions and Bid Preparation; 2) Time-Cost Trade-off Analysis; and 3) Problems Solving in BIM/IPD Environment. In this project-based curriculum developed by the common efforts of academia, public agency and industry, the objectives are: (1) to provide the information and skills needed to successfully implement BIM into the construction phase; (2) to identify BIM's role in construction and the project delivery system; (3) to develop a module in conjunction with leading BIM into project delivery system, particularly coordination between BIM and IPD; (4) to connect technology and research into industry. The course assessment was conducted and the results indicate that it is a successful reform in construction management education.

  • PDF

Project Learning Enablers within Fragmented Construction Projects

  • Alashwal, Ali Mohammed
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.588-592
    • /
    • 2015
  • Many studies have affirmed a negative influence of fragmentation on learning and knowledge sharing in construction projects. However, the literature overlooked enablers of learning within this context. The purpose of this paper is to explore the factors that facilitate project learning and ways to negate any unbecoming effects of fragmentation. Qualitative study used to explore the enablers through interviews administered to 11 top management individuals working in different construction projects in Malaysia. The findings revealed the following factors: participation, relationships, togetherness, and roles of project leader and coordinator. The role of boundary objects was also highlighted including information technology (IT), contract and procedures, drawings, specifications, and reports. The outcome of this paper initiates the development of a model for better knowledge creation and sharing in construction projects. The significance of this model stems from its ability to connection both the characteristics of construction project and project learning theories using the enablers. It is envisaged that future work will be to confirm the model in a quantitative study.

  • PDF

중.소 SI업체의 IT프로젝트 수행 특성에 관한 연구 (A Study on the Characteristics of the Small and Medium System Integration Companies in Performing IT Projects)

  • 김용경
    • 한국산업정보학회논문지
    • /
    • 제15권5호
    • /
    • pp.273-286
    • /
    • 2010
  • 이 연구는 중소 SI업체들이 IT프로젝트를 수행하는데 있어 어떤 공통적인 특성을 보여주는가를 알아보기 위해 진행되었다. 이 연구에서는 2006년부터 2009년까지 중소 제조업체를 대상으로 수행된 194개의 IT프로젝트에 대한 388건의 감리보고서를 기초자료로 사용했다. 연구 결과 프로젝트 관리 분야에서는 일정관리가 가장 취약한(문제가 있거나 또는 관리가 잘안 되는) 것으로 드러났으며, 개발 및 구현 분야에서는 시험 계획과 활동이 가장 취약했으며, 운영 빛 유지보수 분야에서는 사용자/운영자판 위한 매뉴얼 작성이 가장 취약한 것으로 드러났다. 결국 이들 세 가지 취약한 항목들은 중소 SI업체들이 IT프로젝트를 수행하는데 있어서의 공통적인 특성이라고 할 수 있다.

농촌용수 통합관리체계 구축을 위한 정보화 계획 수립 (Establishment of Informatization Plan for the Construction of Integrated Management System of Agricultural Water)

  • 최현성;안세희
    • 한국농공학회논문집
    • /
    • 제59권5호
    • /
    • pp.61-72
    • /
    • 2017
  • The purpose of this study is to establish an integrated management system for the efficient management of rural water, to improve current problems, and to lay the foundations for active use of rural water information. We proposed a plan for informatization with a focus on establishing a database that can be used to provide customized services to users by applying advanced IT technology and to strengthen the management system of cities and counties with poor information. Data linkage and integration, user service development and integration system, application of IT technology, advanced decision support for rural water management, strengthening of city and county management system And the details of the implementation of the key project were presented.

업무상호의존성과 사용자참여가 소프트웨어 개발 프로젝트 성과에 미치는 영향 (The Effect of Task Interdependence and User Participation on Software Development Project Performance)

  • 홍명헌;김신곤;김정곤
    • Journal of Information Technology Applications and Management
    • /
    • 제12권1호
    • /
    • pp.213-229
    • /
    • 2005
  • Cost overrun or schedule delay of the software development project happens frequently despite that software developers continue to make every effort for the effective management of the projects. Previous researches have ascertained that these problems are ascribed to the uncertainty of projects and the improper management of the projects. The purposes of this research are to investigate the impacts of user participation and task interdependence on the performance of the projects and also to find out the appropriate project management method to improve the project performance. Even though the model fitness of the path model is proved to be very high, the verification of the hypotheses showed a variety of results including the four verifications and the one refutation of the hypotheses as well as the suggestion of one alternative hypothesis. The contribution of this research is that the integration model is proposed and verified, comprising the relationship among the user participation, the task interdependence, and the performance of software development projects. A project manager can utilize the implication of this research for an effective management of software development project.

  • PDF