• Title/Summary/Keyword: Project Information Summary

Search Result 20, Processing Time 0.022 seconds

Korean Information Summary System for National R&D Projcet Information Summary (국가R&D과제정보 요약을 위한 한국어 정보요약 시스템)

  • Lee, Jong-Won;Kim, Tae-Hyun;Shin, Dong-Gu;Jo, Woo-Seung
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2022.10a
    • /
    • pp.72-74
    • /
    • 2022
  • The National Science and Technology Knowledge Information Service (NTIS) provides information on national R&D projects. Project information consists of meta-information such as 'project name', 'project performance institution', 'research manager name', and text explaining projects such as 'research goal', 'research content', and 'expected effect'. There is a problem that it takes a lot of time to find the desired project information by checking all of the "research goals" or "research contents" in the list of results of searching for 1 million project information. To solve this problem, this paper proposes a project information summary system that summarizes the parts consisting of long texts within the national R&D project information. By analyzing the linguistic characteristics of the Korean language, a preprocessor was built and a project information summary model based on natural language processing technology was developed to process preprocessed text information. Through this, project information composed of long sentences is provided in a compressed and summarized form, which will help users to easily and quickly infer the overall content with the summary information alone.

  • PDF

The Guideline for Management of Software Project and Its Application (소프트웨어 사업 관리를 위한 지침과 적용방안)

  • Yoo, Cheon-Soo;Lee, Sang-Ho;Sim, Seung-Bae;Cho, Sung-Rim;Song, Ki-Ho;Hur, Jung
    • Journal of Information Technology Services
    • /
    • v.8 no.1
    • /
    • pp.125-142
    • /
    • 2009
  • The Ministry of Information and Communication announced "The Guideline for Management of Software Project" in October 2006. The public employees(acquirer) have to manage software projects with this guideline. The guideline was based on the International standard(ISO/IEC 12207) and IEEE standard(IEEE/EIA 12207), and was developed by considering the domestic software industry environment. The guideline can help to establish a software acquisition process for appropriate management of software projects, and the process can increase the management productivity of software projects. This study provides the explanation about the guideline with terms of 5W1H(who(user), what(summary), when(time to apply), where(domain of application), why(objective), how(method of use)) for understanding of the guideline.

INTRA-AND INTERGOVERNMENTAL INFORMATION SYSTEM TO MANAGE INFORMATION IN URBAN RENEWAL PROJECT

  • Dong-bum Kim;Jin-Won Kim;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.561-566
    • /
    • 2011
  • In general, the early stage of urban renewal such as preparing a master plan and processing administrative works including planning permission are conducted by local governments in Korea. The local governments need to review the status of projects that are undergone in other local governments' territories. However, no integrated information system to manage information to this end at the level of nation exists in Korea. If the system would be developed, it may support central government to obtain information on required resources at the national level. In addition, local governments can gain guidance on the process and recognize potential problematic situations from others experience. The system should include functions to collect data on project summary, cost and schedule of projects according to local governments. The expected effects from using the information system are as following. First, information generated from project practice become more credible on account of management at the national level. Because the authorized party such as system administrative agents of governments are responsible for collecting and managing data. Second, the unified information system with no regard to the place where projects progresses reduces the efforts for accumulating reference data for aiding local governments decision making by providing appropriate information timely. Also, enhanced information accessibility for stakeholders make the project process clear. Finally, oversight management is enforced with visualization technology adopted in the system, presenting master plan and mass model including information on usage by floors and progressing information graphically. Ultimately, potential challenges can be anticipated by considering records accumulated from other local governments' projects. This paper presents concept, functionalities, and architecture of information system enabling to manage data from individual projects and aggregate those for oversight management for local and central governments. As a part of systems analysis, general requirements of briefing system for governments and necessary data fields to this end are identified.

  • PDF

Setting the New Trends for BIM in Construction: Productivity, Performance, Competitiveness, and Innovation

  • Wang, Xiangyu;Moon, Sungkon
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.21-22
    • /
    • 2015
  • Productivity has been a wide-ranging challenge for the construction industry, both in Australia and globally. Particularly in Western Australia's construction and resources sectors, continuously low productivity will potentially discourage future investments. The emergence of the global marketplace necessitates that the supply chain needs to focus on the concept of the holistic efficiency. The isolated geographical position of Australia only exacerbates this phenomenon. In recent years, Building Information Modelling (BIM) has been suggested as an efficient way to help productivity improve and information management throughout supply chains. This keynote talk will focus on discussing ways of implementing BIM to enhance site productivity focusing on Western Australia's construction projects. It will show new trends of its applications to accomplish an innovative way in construction project management. The talk will also give an insightful summary of integrated methods with state-of-the-art technologies backboned by the BIM cases from construction and oil and gas industry projects.

  • PDF

Concept and Issues in Supply Chain Management for Plant Engineering Project (플랜트 엔지니어링 프로젝트의 공급망관리 : 개념과 이슈)

  • Cheong, Heung Gyo;Park, Seong-Taek;Kim, Tae Ung
    • Journal of Digital Convergence
    • /
    • v.10 no.9
    • /
    • pp.213-224
    • /
    • 2012
  • Supply chain management for complex project focuses on planning acquisitions, identifying and choosing the right suppliers and subcontractors, planning and negotiating appropriate contracts, and administering and closing contracts. Working with suppliers and subcontractors requires continuous integration activities during project execution. This article examines the concept and issues concerning supply chain management in plant engineering Project, of which has not been taken seriously by industry. We propose the technological infra, social infra and information system connecting all participants in supply chain, as the major fields of research requiring industry attentions, and give a brief summary of research in each proposed areas.

A WEB-BASED PROJECT MANAGEMENT SYSTEM FOR GOVERNMENT R&D PROGRAMS (국가 연구개발을 위한 웹기반의 과제관리 시스템)

  • 손권중
    • Proceedings of the Technology Innovation Conference
    • /
    • 2003.06a
    • /
    • pp.108-115
    • /
    • 2003
  • Government R&D Project Management in Korea has had considerable difficulties because of the lack of project monitoring systems and insufficient communication. The National Program for Tera-level Nanodevices (TND Program) is a ten-year R&D program for commercialization in the area of nano technology. Collaboration and communication among the various participants such as business companies, universities, and government R&D institutes are key success factors in this R&D program. TND Program office has developed a Web-based project management system. This system consists of mostly four sub-management functions: (1) Milestones management of all R&D projects; (2) DR (Design Review) management as the mechanism for checking the performance against milestones; (3) Project activity management using the WBS (Work Breakdown Structure); (4) Budget management. Additionally, it also has many R&D supporting functions such as technology information bulletin board, community management, and visual summary of project progress and performance. This system is effective for monitoring research project as well as measuring project performance of the overall research program. This Web-based system has become the useful tool of R&D moving target mechanism and effective communication and collaboration tool. System features and adoption process of the system are also suggested.

  • PDF

In-depth Review of IPCC 5th Assessment Report (IPCC 제5차 과학평가보고서 고찰)

  • Park, Il-Soo;Woon, Yu;Chung, Kyung-Won;Lee, Gangwoong;Owen, Jeffrey S.;Kwon, Won-Tae;Yun, Won-Tae
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.30 no.2
    • /
    • pp.188-200
    • /
    • 2014
  • The IPCC 5th Assessment Report (Climate Change 2013: The Physical Science Basis) was accepted at the 36th Session of the IPCC on 26 September 2013 in Stockholm, Sweden. It consists of the full scientific and technical assessment undertaken by Working Group I. This comprehensive assessment of the physical aspects of climate change puts a focus on those elements that are relevant to understand past, document current, and project future of climate change. The assessment builds on the IPCC Fourth Assessment Report and the recent Special Report on Managing the Risk of Extreme Events and Disasters to Advance Climate Change Adaptation. The assessment covers the current knowledge of various processes within, and interactions among, climate system components, which determine the sensitivity and response of the system to changes in forcing, and they quantify the link between the changes in atmospheric constituents, and hence radiative forcing, and the consequent detection and attribution of climate change. Projections of changes in all climate system components are based on model simulations forced by a new set of scenarios. The report also provides a comprehensive assessment of past and future sea level change in a dedicated chapter. The primary purpose of this Technical Summary is to provide the link between the complete assessment of the multiple lines of independent evidence presented in the main report and the highly condensed summary prepared as Policy makers Summary. The Technical Summary thus serves as a starting point for those readers who seek the full information on more specific topics covered by this assessment. Warming of the climate system is unequivocal, and since the 1950s, many of the observed changes are unprecedented over decades to millennia. The atmosphere and ocean have warmed, the amounts of snow and ice have diminished, sea level has risen, and the concentrations of greenhouse gases have increased. Total radiative forcing is positive, and has led to an uptake of energy by the climate system. The largest contribution to total radiative forcing is caused by the increase in the atmospheric concentration of $CO_2$ since 1750. Human influence on the climate system is clear. This is evident from the increasing greenhouse gas concentrations in the atmosphere, positive radiative forcing, observed warming, and understanding of the climate system. Continued emissions of greenhouse gases will cause further warming and changes in all components of the climate system. Limiting climate change will require substantial and sustained reductions of greenhouse gas emissions. The in-depth review for past, present and future of climate change is carried out on the basis of the IPCC 5th Assessment Report.

The Effect of Knowledge Complementarity and PMO Implementation System on Performance of IT Project (지식 상호보완성과 PMO수행체계가 IT 프로젝트 성과에 미치는 영향)

  • Kim, Choong-Nyoung;Jang, Ji-Yeon;Choi, Kyu-Jin
    • Management & Information Systems Review
    • /
    • v.37 no.4
    • /
    • pp.141-156
    • /
    • 2018
  • PMO(Project Management Office) has been considered as a general approach for the successful operation of IT project. The previous studies tended to emphasize on the roles and functions of PMO in a normative way. However, in practice, since PMO is operated as a joint structure in which client firms and professional PMOs work together, it seems to be important that the implementation system of PMO should be properly formed. In this paper, it is examined whether the competence of client firms and professional PMO influence on the setup of implementation system of PMO, and also whether implementation system of PMO influence of the performance of IT project. In addition, it is also analyzed if the competence of client firms and professional PMO influence differently on the setup of implementation system of PMO, according to the degree of knowledge complementarity. As a result of this study, it is found that the competence of client firms and professional PMO influence positively on the setup of implementation system of PMO, and governance factors such as clear definition of organizational roles, responsibility, and setup of standardized processes are also important in performance of IT project. It is also shown that, if knowledge complementarity is formed with a common knowledge base between client firms and professional PMOs, Project Management Office functions effectively. In summary, for the successful performance of IT project, it seems that it is required to approach from the view point of governance in forming the implementation system of PMO and it is also important to form knowledge complementarity between client firms and professional PMOs.

UNDP's Adaptation Policy Framework for Climate Change (국제연합개발계획의 기후변화 적응 정책 체계 소개)

  • Shm, Im-Chul;Lee, Eun-Jeong;Kwon, Won-Tae;Lim, Jaekyu
    • Atmosphere
    • /
    • v.15 no.1
    • /
    • pp.59-68
    • /
    • 2005
  • United Nations Development Programme (UNDP) introduced the Adaptation Policy Framework (APF) to support the developing countries in order to help to make adaptation policy and strategy to climate change. This study provides the summary of the APF and will help for preparing policy regarding the impact of climate change and its adaptation. APF consists of five basic and two cross-cutting steps. Five basic steps are made of (a) defining project scope and design, (b) assessing current vulnerability and adaptation, (c) assessing future climate-related risks, (d) developing an adaptation strategy, and (e) continuing the adaptation process. Cross-cutting steps consist of engaging stakeholder and enhancing adaptive capacity. The project scope and design process includes four major tasks: scope the project and define its objectives, establish the project team, review and synthesize existing information on vulnerability and adaptation, and design the APF project. The main purpose of assessing current vulnerability and adaptation is to understand the characteristics of current climate-related vulnerability in priority systems and the scope of adaptive responses. Future climate-related risks are assessed in order to characterize future climate-related risks, so that adaptation policies and measures can be designed to reduce the system's exposure to future climate hazard. In developing an adaptation strategy, all of the preceding APF-related work is synthesized into a well-considered strategy that can direct real adaptation action. Continuing the adaptation process is in order to implement and sustain the APF-strategy, polices, and measure. The purpose of involvement of stakeholders is to communicate between individuals and groups about projects. Finally, enhancing adaptive capacity provides guidance on how adaptive capacity can be assessed and enhanced.

A Basic Model of the Procurement Planning of Resources by Activity in Construction Projects (건축공사 액티비티별 소요자원 조달계획의 기초모델링)

  • Kim, Ji-Hyun;Nam, Gi-Yung;Lee, Soo-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.340-346
    • /
    • 2012
  • Recently, the construction industry has been pursuing the rationalization of its various systems through informatization. Procurement is a highly important element of the construction process, as it is directly related to the cost and quality of a construction project. In addition, procurement management of resources is in an indivisible relation, so that it is significant to link each other effectively. This study proposed construction activity and basic data connected to cost summary work for the categorization and utilization of resources. This study connected that activity to detailed items of material and labor cost, and proposed a procurement planning model of resources by activity that can utilize all resources and information. In addition, this model can classify resources and information by various forms. We found that the utilization of this procurement planning model will be higher because it can grasp various problems that occur in the passive procurement and provide additional functions that can be modified.