Scenario Planning and Risk Failure Mode Effect and Analysis (RFMEA) based Management

  • Paul, Virendra Kumar;Basu, Chaitali
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.2
    • /
    • pp.24-29
    • /
    • 2016
  • This paper elaborates the significance of scenario planning in risk management, and presents an integrated approach which takes into account the 'Risk Events' derived from scenario planning for risk prioritisation. This research integrates scenario planning with Risk Failure Mode and Effect Analysis (RFMEA) through examples from construction litigations of project schedule and cost overrun cases as a simplified approach to project risk management. The proposed methodology incorporates scenarios developed from realistic events of dispute and arbitration cases from construction projects, and thereby increasing potential to foresee risks and their effects well in advance. The results from this methodology shall be validated against outcome of survey study conducted by KPMG-PMI (2013) on project schedule and cost overruns that was based on Ministry of Statistics and Programme Implementation (MoSPI) Project Monitoring data for 2012-13.

A Study of Saemangeum Project's Sustainable Development: Focused on local governments of Jeollabukdo (새만금사업의 지속가능한 발전방안 연구: 전라북도 지자체를 중심으로)

  • Kim, Gang-Hoon
    • Korean System Dynamics Review
    • /
    • v.11 no.4
    • /
    • pp.25-59
    • /
    • 2010
  • The Korean government has operated various mega-development projects in order to help nation progress into the future. However, many problems and concerns have been raised on the mega-projects' delay and failure in South Korea. Moreover, there are many technical and executive problems; such as trial and error of development work, failure of validity test, complicated decision-making processes, and so on. With these concerns and problems to mega-development projects, finding a sustainable development from mega-projects is becoming a new issue in the field of mega-development projects. Therefore, the main purpose of this study is to investigate whether or not most mega-development projects conducted by the government exactly corresponds with sustainable development (such as environmental soundness, economic efficiency and social equity) focusing on Saemangeum project. Using causal loop analysis, this study gives some significant results to us. First, for environmental soundness, both central and local government should ensure water-purity control system for farming, industry, leisure, and others. Second, for economic efficiency, both governments not only have to secure a budget for completion of infrastructure of the Saemangeum project but also support financial assistance to Saemangeum project. Third, for social equity, three local governments (i.e., Gunsan, Gimje, and Buan) should stop debate and conflict with regard to an administrative district of Saemangeum region. Finally, most politicians should not use Saemangeum project for political means. Rather, they should recognize the project as a motive power for economic development of Jeollabukdo.

  • PDF

THE CAUSES OF BAD PROFIT IN OVERSEAS CONSTRUCTION PROJECTS

  • Seung Heon Han;Du Yon Kim;Sang Hyuk Park
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1237-1243
    • /
    • 2005
  • International construction projects are exposed to various and complicated risk factors stemming from different political, economical, social, and cultural backgrounds, which make contractors entering into international construction to experience severe losses. It implies that overseas markets do not necessarily secure the high return, which is typically expected to in the high risky attempts. Accordingly, contractors need to evaluate various risk factors faced with overseas construction projects that can possibly aggravate the profitability. This paper aims at establishing a valid groundwork for further research on developing the integrated risk management model. For this end, it analyzes the long-term trend of profitability on total of 3,487 projects performed by Korean global contractors in world-wide construction markets during the last four decades. Then, it investigates the possible factors/causes of bad profit that have affected the profitability significantly through the structured surveys of 90 real overseas projects based on the project-specific information and experiences of Korean contractors in overseas markets. Furthermore, it analyzes relative importance of these factors/causes and identifies the important features expected for the risk management of international construction projects. Finally, vital distinctions between success and failure projects and lessons learned to improve profitability are then distilled.

  • PDF

Critical Factors Affecting No-dispute Performance: A Case of Ethiopian Public Construction Projects

  • Sinesilassie, Ephrem Girma;Tabish, Syed Zafar Shahid;Jha, Kumar Neeraj
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.4
    • /
    • pp.24-34
    • /
    • 2016
  • Disputes seem to be synonymous with large-scale construction projects in Ethiopia. The purpose of this study is to determine the factors responsible for impacting the performance of Ethiopian public construction projects. To this end, 35 success and failure attributes responsible for impacting the performance of the projects were identified and presented to Ethiopian construction professionals in the form of a structured questionnaire, and responses were collected. The factor analysis conducted on the success and failure attributes influencing no-dispute performance separately resulted in six success factors and five failure factors. Further analysis using stepwise multiple regression indicates that owner competence and interaction among project participants have a positive impact on no-dispute performance. However, conflict among project participants has a negative impact on the no-dispute performance of Ethiopian public construction projects. Although Ethiopia-specific, the results reflect construction management problems common to both developed and developing countries. The findings are expected to help researchers and practitioners gain a better understanding of critical success and failure factors and to help them take proactive measures to avoid disputes in public construction projects.

A Study of Reliability Analysis and Application on Naval Combat System Using Field Critical Failure Data (야전 치명고장자료를 이용한 함정전투체계 신뢰성 분석 및 활용 방안)

  • Kim, Young-Jin;Oh, Hyun-Seung;Choi, Bong-Wan
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.4
    • /
    • pp.49-59
    • /
    • 2016
  • Naval combat system developed in-country is progressing at an alarming rate since 2000. ROK navy will be achieved all vessels that have combat system in the near future. The importance of System Engineering and Integrated Logistics Support based on reliability analysis is increasing. However, reliability analysis that everyone trusted and recognized is not enough and applied practically for development of Defense Acquisition Program. In particular, Existing Reliability Analysis is focusing on reliability index (Mean Time Between Failure (MTBF) etc.) for policy decision of defense improvement project. Most of the weapon system acquisition process applying in the exponential distribution simply persist unreality due to memoryless property. Critical failures are more important than simple faults to ship's operator. There are no confirmed cases of reliability analysis involved with critical failure that naval ship scheduler and operator concerned sensitively. Therefore, this study is focusing on Mean Time To Critical Failure (MTTCF), reliability on specific time and Operational Readiness Float (ORF) requirements related to critical failure of Patrol Killer Guided missile (PKG) combat system that is beginning of naval combat system developed in-country. Methods of analysis is applied parametric and non-parametric statistical techniques. It is compared to the estimates and proposed applications. The result of study shows that parametric and non-parametric estimators should be applied differently depending on purpose of utilization based on test of normality. For the first time, this study is offering Reliability of ROK Naval combat system to stakeholders involved with defense improvement project. Decision makers of defense improvement project have to active support and effort in this area for improvement of System Engineering.

Exploratory Study on Risk Factors by Project Performance Areas in Software Project Management (정보시스템 프로젝트의 성과영역별 위험요인에 관한 탐색적 연구)

  • Lee Seogjun;Kim HaeJung;Suh Hyunsuk
    • Journal of Information Technology Applications and Management
    • /
    • v.11 no.4
    • /
    • pp.103-120
    • /
    • 2004
  • Identifying validated risk factors in software risk management is imperative for project managers. Although validated risk lists were provided by previous researchers, risk list associated with software project performance areas was not provided as yet. This paper represents a first step toward understanding risk lists by various project performance areas (time, cost, and quality) to help project managers alleviating the possibility of software project failure. Four simultaneous exploratory surveys were conducted with 29 experienced software project managers. Three different risk factor ranking sets for each project performance area were compared with, the risk ranking, which was provided without clarifying specific project performance areas. The risk lists and their corresponding perceived importance were different from previous research results. This implies that identifying risk factors for specific project performance areas can provide additional information for project managers. We concluded by discussing implications of our finds for both research and improving risk management practice.

  • PDF

The Effects of IT Project Risk Management Factors on Project Performance (IT 프로젝트 위험관리요인이 프로젝트 성과에 미치는 영향)

  • Jang, Sung-Bong;Kwahk, Kee-Young
    • Korean Management Science Review
    • /
    • v.28 no.2
    • /
    • pp.31-51
    • /
    • 2011
  • Many companies have considered IT outsourcing as one of strategic alternatives in order to rapidly respond to changing business environment and strengthen their competitiveness. Despite its strategic role, however, IT outsourcing project has been plagued by a high failure rate and difficulty in realizing the promised project performance because of its inappropriate risk management. This study examines the effect of IT project management risk factors on project performance. We propose that project risk management factors(communication, technology sharing, and project control) influence project performance(process performance and product performance). Based on the empirical results, theoretical and practical implications of the study are discussed along with its limitations.

A Study on Project Management Scheduling Module Development using the Rule and CBR (규칙(Rule) 과 CBR 기법을 활용한 프로젝트 일정관리 모듈 구현에 관한 연구)

  • Sin, Ho-Gyun;Kim, Yeong-Jun;Jeon, Seung-Ho
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.05a
    • /
    • pp.343-354
    • /
    • 2004
  • A Project planning is one of the most important processes that determines success and failure of the project. Scope management for project planning is also essential job in system integration project. However project planning is very difficult because lots of factor and their relationships should be considered. Therefore project planning of SI project has been done by project manager s own knowledge and experiences. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study also present method (ODW model) to cope with the limitations of the existing study that has uniformly customizing the methodology by only project complexity. We propose PPSM(Project planning support module) that apply Rule for determination of route map and document level, and CBR for WBS identification.

  • PDF

Factors That Affect Project Time and Cost Performance during Highway Construction Using Incentive/Disincentive Provisions

  • Pyeon, Jae-Ho;Park, Moonseo;Jung, Sangsun;Park, Taeho
    • Land and Housing Review
    • /
    • v.11 no.4
    • /
    • pp.115-124
    • /
    • 2020
  • Incentive/Disincentive (I/D) contract is designed for minimizing any disruption of traffic flow in road construction projects. I/D contracting projects have been evaluated with regard to time and cost performance in various states, more than 35 states. However, construction project managers and planners have little understanding of the project factors that affect the project time and cost performance of highway construction projects using I/D regulations. Therefore, the purpose of this research is to find factors that affect I/D project success or failure to improve the decision-making process for the implementation of I/D projects. In order to achieve the objectives of this research, the researchers collected I/D road construction project data from FDOT and performed evaluation for each collected project. Then, project data analysis to identify key factors that affect I/D project performance was performed. In conclusion, five significant factors for project time performance and six significant factors for project cost perfornace were identified and summarized.