• Title/Summary/Keyword: Project Evaluation Form

Search Result 80, Processing Time 0.027 seconds

A Study on the Establishment of Visual Landscape Impact Factors for Natural Landscape Management (자연경관관리를 위한 시각적 경관영향 요소 설정에 관한 연구)

  • Shin, Min-Ji;Shin, Ji-Hoo
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.4
    • /
    • pp.135-146
    • /
    • 2018
  • A Visual landscape planning and management system has been introduced and implemented by each ministry so as to solve the problems of visual landscape destruction due to recognition on the value of natural landscape of beautiful territory and various development projects. At present, this system emphasizes the importance of the visual and perceptual aspect of the landscape however, there is a lack of techniques required for comprehensively predicting, evaluating, and managing it. Furthermore, sustainable landscape management after the completion of development projects has been inadequately carried out, as the focus has been only on consultation in the planning process of the development project in institutional performance. To this end, we presented objective and standardized criteria to predict and judge the effects of development projects on landscapes before project implementation. During the implementation of the development project, the influence of the visual landscape becomes accumulated in the construction progress stage. There is a need to identify the main viewpoints and to examine the continuous changes in the landscape-influencing factors, owing to the remarkable influences on the landscape, such as the change in the topography and the change caused by the artificial structure. During the stage of managing the influence on the visual landscape after the completion of the project, the influence on landscape should be monitored by measuring the change in the continuous landscape-influencing factors and determining the extent to which the actual reduction plan has been implemented. These processes should be performed continuously to maintain the quality of the visual landscape. The change in the landscape caused by the development project is shown to cause relatively greater visual damage than other factors composing the landscape owing to the influence of the artificial factors including the structure or the building. This shows that not only detailed examination of the visual impact before the development project but also continuous management is required during and after the development project. For this purpose, we derived eight landscape-influencing factors including form/shape, line, color, texture, scale/volume, height, skyline, and landscape control point. The proposed considering to be of high utilization in that it has a clear target of the landscape influencing factors.

An Experimental and Analytical Study on Shear Transfer for Safety Evaluation of Concrete Structure (콘크리트 구조물의 전단 안정성 평가를 위한 전단전달 실험 및 해석)

  • Kim, Kwang-Soo
    • Journal of the Korean Society of Safety
    • /
    • v.23 no.3
    • /
    • pp.42-50
    • /
    • 2008
  • This study, push-off tests for the initially uncracked specimens were conducted to investigate shear transfer mechanism in reinforce concrete elements. Experimental programs for shear transfer were undertaken to investigate the effect of the concrete compressive strength, the presence of steel stirrups as shear reinforcement and the amount of steel stirrups. As the shear plane is loaded, several cracks form in a direction inclined to the shear plane, creating compression struts in the concrete. For this stage, shear is being transferred through a truss-like action produced by the combination of the compressive force in the concrete struts and the tensile force that the steel reinforcement crossing the shear plane develops. In the normal strength concrete specimens with steel stirrups, ultimate failure occurred when the compression struts crushed in concrete. In the high strength concrete specimens, on the other hand, ultimate failure occurred when the steel stirrups developed their yield strength.

Economic Evaluation Method for Marine Electric Generating Systems Using a Comprehensive Economic Index (종합 경제성 평가지수에 의한 선박 발전장치의 경제성평가법)

  • Jeong-Je Kim;Seung-Taek Chang
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.30 no.1
    • /
    • pp.10-19
    • /
    • 1993
  • Design optimisation generally necessitates a tool of assessing the economics of designs. This paper proposes a method of assessing the economics of marine electric generating systems. The pay back period(PBP) and the net present valuve(NPV) of the investment for a designed project are properly converted into a economic index. The mechanical factors dominating the easiness in operating the system are also assessed and quantified to form a index which eventually is added to the economic index producing a comprehensive economic index. The method has been tested on a design example and it's validity has been shown.

  • PDF

EVALUATION OF NONDESTRUCTIVE TESTS ANALYSIS TO ESTIMATE INPLACE STRENGTH OF CONCRETE

  • Parviz Ghoddousi;Mohsen Tadayon;Pedram H. Mojarad
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.672-680
    • /
    • 2005
  • There are a lot of reasons to use In-place tests. Construction schedules often require that operations such as form removal, post-tensioning, termination of curing, and removal of reshores be carried out as early as possible. To enable these operations to proceed safely as soon as possible requires the use of reliable in-place tests to estimate the in-place strength. In-place test results are not reliable for engineering judgment. These results should be interpreted and correlated to standard compressive strength, based on the test method. In this paper some of these test procedures and their limitations are discussed. In this study we will go on for Rebound number, Pullout, Ultrasonic pulse velocity, and Cast-in-place cylinder methods which are most useful methods in the Asia.

  • PDF

Economic Evaluation of ODA Project - A Case of Poultry Farm in Uganda - (우간다 양계부문 ODA 사업의 농가단위 경제성 평가)

  • Yang, Heon-Yong;Seo, Il-Hwan
    • Journal of Korean Society of Rural Planning
    • /
    • v.26 no.4
    • /
    • pp.67-79
    • /
    • 2020
  • As globalization, international cooperation has grown in importance. In accordance with this trend, Korea has been receiving high demands from international organizations about expanding the scale of Official Development Assistance(ODA) in line with its improved national status. In addition, in the economic aspect of Korea, the ODA project is expected to provide new growth opportunities in the mid- to long-term by promoting cooperation with developing countries. Uganda is an area with high strategic value due to good agricultural conditions and favorable geographical conditions. The poultry industry is a business that is generally carried out to the Ugandan, but due to economic problems such as initial investment cost, most of them have raised poultry on a small scale which is not enough for main income. This paper proposes the construction and operation plan of adapting to small poultry farms in the village-intensive type to sustainable income for residents in Uganda through ODA project in Korea's agricultural technology. The economic feasibility was analyzed from the long-term perspective when the initial construction cost was supported or not and the poultry species ratio was adjusted in terms of initial and operating costs. Economic analysis was performed using Net Present Value(NPV) method. As of after 10 years, when operating in the form of shifting kuroiler to layers, it was estimated to earn about 700,000 ugx more than when only kuroiler is raised, and it is able to reduce about 14 million ugx from the initial cost than when only raising layers. As of 20 years, the most profitables scenario was the breeding of 100 kuroilers and 400 layers methods. however, this case was anlayzed to be unsuitable for Uganda farmers, with initial costs more than three times higher than the shifting method of the kuroiler to layers. If the initial construction cost is supported by ODA project, the initial investment cost can be recovered in the first year with the shifting method, whereas raising only layers take two years to recoup the cost. In the meantime, when studying livestock industry in Uganda, it was examined by relying on statistical data, but this paper is meaningful in that it predicted how much it is economically effective based on field experience.

Improving the Reliability of the National Database for Chemical Hazard Information (국가 화학물질 유해성정보 데이터베이스 구축 과정의 신뢰도 제고 방안에 관한 연구)

  • Lee, Somin;Lee, Minhyeok;Kang, Mijin;Kwon, Soon-Kwang;Ra, Jin-Sung;Park, Beaksoo
    • Journal of Environmental Health Sciences
    • /
    • v.46 no.4
    • /
    • pp.410-422
    • /
    • 2020
  • Objectives: According to the Act on Registration, Evaluation, Etc. of Chemicals, new and existing chemicals must be registered by 2030. In addition, industries need to submit hazard data as an attachment during the registration process. Therefore, we constructed a nationwide chemical database to support small industry by providing hazard data and original sources. During the process, we developed a new standard procedure for minimizing errors and increasing reliability. Methods: We analyzed the categories of errors and the cause of the errors through the verification results of the 2019 project. We present an improved database construction methodology and system. Results: Errors are categorized according to their causative factors into simple, technical, and structural type errors. Simple errors arise simply because of decreased concentration or negligence in following the instructions. Technical errors are caused by a discrepancy between the professional field and the type of data. Structural errors indicate systemic errors such as incomplete forms on the excel database or ambiguity in the guidelines. Lessons from the errors collected in the 2019 project are used to update the procedures for database authorization and technical guidelines. The main update points are as follows; 'supplementation of review process', 'giving regular training to external reviewers', 'giving additional information to authors, like physico-chemical properties of substances, degradability, etc.', 'amendment of excel form', and 'guideline upgrades'. Conclusions: We conducted this study with the aim of improving the accuracy and reliability of the database of hazard information for chemical substances. The new procedures and guidelines are now being used in the 2020 project for construction of a hazard information database for Korea.

Post earthquake performance monitoring of a typical highway overpass bridge

  • Iranmanesh, A.;Bassam, A.;Ansari, F.
    • Smart Structures and Systems
    • /
    • v.5 no.4
    • /
    • pp.495-505
    • /
    • 2009
  • Bridges form crucial links in the transportation network especially in high seismic risk regions. This research aims to provide a quantitative methodology for post-earthquake performance evaluation of the bridges. The experimental portion of the research involved shake table tests of a 4-span bridge which was subjected to progressively increasing amplitudes of seismic motions recorded from the Northridge earthquake. As part of this project, a high resolution long gauge fiber optic displacement sensor was developed for post-seismic evaluation of damage in the columns of the bridge. The nonlinear finite element model was developed using Opensees program to simulate the response of the bridge and the abutments to the seismic loads. The model was modified to predict the bent displacements of the bridge commensurate with the measured bent displacements obtained from experimental analysis results. Following seismic events, the tangential stiffness matrix of the whole structure is reduced due to reduction in structural strength. The nonlinear static push over analysis using current damaged stiffness matrix provides the longitudinal and transverse ultimate capacities of the bridge. Capacity loss in the transverse and longitudinal directions following the seismic events was correlated to the maximum displacements of the deck recorded during the events.

Comprehensive validation of silicon cross sections

  • Czakoj, Tomas;Kostal, Michal;Simon, Jan;Soltes, Jaroslav;Marecek, Martin;Capote, Roberto
    • Nuclear Engineering and Technology
    • /
    • v.52 no.12
    • /
    • pp.2717-2724
    • /
    • 2020
  • Silicon, especially silicon in the form of SiO2, is a major component of rocks. Final spent fuel storages, which are being designed, are located in suitable rock formations in the Earth's crust. Reduction of the uncertainty of silicon neutron scattering and capture is needed; improved silicon evaluations have been recently produced by the ORNL/IAEA collaboration within the INDEN project. This paper deals with the nuclear data validation of that evaluation performed at the LR-0 reactor by means of critical experiments and measurement of reaction rates. Large amounts of silicon were used both as pure crystalline silicon and SiO2 sand. The critical moderator level was measured for various core configurations. Reaction rates were determined in the largest core configuration. Simulations of the experimental setup were performed using the MCNP6.2 code. The obtained results show the improvement in silicon cross-sections in the INDEN evaluations compared to existing evaluations in major libraries. The new Thermal Scattering Law for SiO2 published in ENDF/B-VIII.0 additionally reduces the discrepancy between calculation and experiments. However, an unphysical peak is visible in the neutron spectrum in SiO2 obtained by calculation with the new Thermal Scattering Law.

A Study on the Calculation of Productive Rate of Return (생산투자수익률 계산방법에 대한 연구)

  • Kim, Jin Wook;Kim, Kun-Woo;Kim, Seok Gon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.3
    • /
    • pp.95-99
    • /
    • 2015
  • The IRR(internal rate of return) is often used by investors for the evaluation of engineering projects. Unfortunately, it has serial flaws: (1) multiple real-valued IRRs may arise; (2) complex-valued IRRs may arise; (3) the IRR is, in special cases, incompatible with the net present value (NPV) in accept/reject decisions. The efforts of management scientists and economists in providing a reliable project rate of return have generated over the decades an immense amount of contributions aiming to solve these shortcomings. Especially, multiple internal rate of returns (IRRs) have a fatal flaw when we decide to accep it or not. To solve it, some researchers came up with external rate of returns (ERRs) such as ARR (Average Rate of Return) or MIRR (MIRR, Modified Internal Rate of Return). ARR or MIRR. will also always yield the same decision for a engineering project consistent with the NPV criterion. The ERRs are to modify the procedure for computing the rate of return by making explicit and consistent assumptions about the interest rate at which intermediate receipts from projects may be invested. This reinvestment could be either in other projects or in the outside market. However, when we use traditional ERRs, a volume of capital investment is still unclear. Alternatively, the productive rate of return (PRR) can settle these problems. Generally, a rate of return is a profit on an investment over a period of time, expressed as a proportion of the original investment. The time period is typically the life of a project. The PRR is based on the full life of the engineering project. but has been annualised to project one year. And the PRR uses the effective investment instead of the original investment. This method requires that the cash flow of an engineering project must be separated into 'investment' and 'loss' to calculate the PRR value. In this paper, we proposed a tabulated form for easy calculation of the PRR by modifing the profit and loss statement, and the cash flow statement.

Analysis on the Status of Joint Forestry Project in National Forest (국유림 공동산림사업 실태분석에 관한 연구)

  • Kim, Dong-Hyeon;Ko, Chi-Ung;Kim, Dong-Geun
    • Journal of agriculture & life science
    • /
    • v.53 no.6
    • /
    • pp.45-53
    • /
    • 2019
  • The purpose of this study is to analyze the status of the joint forest project, which is one of the national forest management system, by using stakeholder participation, transparency of decision making, accountability of actors and stakeholders, The questionnaire survey was conducted using the 5 - point scale and the written form. As a result of the questionnaire survey, various stakeholder participation items had the highest opportunity to participate with an average of 3.3 and the lowest score with 2.3 points for establishing conflict and conflict resolution structures. Transparency was analyzed to be 3.4 points for the project disclosure, 2.7 points for information sharing and education promotion activities for local residents, 3.3 points for the detailed role of the project implementer, and 2.7 points for internal and external monitoring and evaluation of the project with various stakeholders. The results of this research, analyzed through the participatory forest management index, are deemed to be used as basic data for the establishment of a plan for the revitalization of national forest participation management.