1 |
Kim, J.W. and Lee, C.S., A Study on Rate of Returns in Engineering Projects. Journal of the Society of Korea Industrial and Systems Engineering, 2008, Vol. 31, No. 3, pp. 74-79.
|
2 |
Kim, J.W., Lee, C.S., and Kim, J.-K., A Study on the Real Rate of Return in Real Investment. Journal of the Society of Korea Industrial and Systems Engineering, 2009, Vol. 32, No. 4, pp. 124-127.
|
3 |
Kim, J.W., Arrangement Terms of Engineering Project, Spring 2014 KIIE-KORMS Joint Conference Proceedings, Busan, 2014, pp. 2009-2010.
|
4 |
Lin, S., The Modified Internal Rate of Return and Investment Creterion. The Engineering Economist, 1976, Vol. 21, No. 4, pp. 237-248.
DOI
|
5 |
Park, C.S. and Choi, S.H., Fundmentals of Engineering Economics, Seoul, Cheongram, 2014.
|
6 |
Park, C.S., Kim, G.T., and Choi, S.H., Engineering Economics, Seoul, Youngchi, 2005.
|
7 |
Solomon, E., The Arithmetic of Capital-Budgeting Decision, Journal of Business, 1956, Vol. 29, No. 2, pp. 124-129.
DOI
|