A Study on the Cost Estimate System Development Method for Nuclear Power Plant Construction Projects

  • Lee, Sang Hyun
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.133-137
    • /
    • 2017
  • Nuclear power plants in Korea are usually built based on a duplicated model; so the project cost data of the preceding unit can be used as reference when estimating the project cost for the succeeding unit. However, since the contracting method is oriented towards the price, empirical factors such as making top-down estimations using the reverse calculation method based on the completion cost of the preceding unit is dominant. In order to develop a project cost database to resolve such problems, the detailed cost boundary of the project cost data must be categorized by project and by system. This study proposes a method to connect the code of account with the base quantities and the IAEA account, and proposes a database structure for the development of a project cost estimation system. The estimation system developed in the future is expected to utilize the proposed project cost data structure.

  • PDF

Development and Application of Integrated Management System in Nuclear Power Plant Construction Project

  • Lee, Sang Hyun;Byon, Su Jin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.700-701
    • /
    • 2015
  • Nuclear power plant construction project can be called essential to establish a systematic project management system compared to other construction projects, taking into account the size and complexity and safety. To develop into a project management system for the Korea situation with the ongoing construction of the nuclear power plant was directed to promote nuclear power project management. In this paper, we introduce a comprehensive project management system for nuclear power projects. Currently considering the nuclear life cycle design, construction, and was developed by considering the flow of information to operate, and test each step linkage. The systems in English were developed to meet owner's requirements for advancing into overseas projects. Another point is that the systems were developed by management module, so that functions of each area can be selectively applied. It is expected that the system will establish itself as one that can be used for the entire lifecycle of nuclear power plants through gradual and systematic establishment of necessary data.

  • PDF

Adjusting Planning Management and Control to the Owner Environment Case Study: Consultant Adjustment to the Owner Environment in Thailand

  • Sruntummakul, Apai;Leungbootnak, Narong;MIN, Vuthea
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.3
    • /
    • pp.10-17
    • /
    • 2015
  • Consultant and owner play a very important role in the construction sector which is one of the main sectors in economic development. There are many stakeholders in a construction project including but not limited to: owner, consultant, contractor, subcontractor, and supplier. The consultant is the party who is to stay in close touch with the project owner, which both consultant and owner are considered as the main key stakeholders to make the project happen. It's not a simple task for a consultant to just implement the same style of management and control within various projects that are of a different background and character of owners. Thus, the adjusting plan management and control to the owner environment has been an essential technique to drive the project to success. The objective of this paper is to identify the significant management techniques for adjusting a plan of management and control to the owner environment in Thailand. The methodology is the identification throughout the analogous to abduction from literature review and our empirical observations of Future Engineering Consultants Co, Ltd. We have been in consultation for twenty-five years (25) in Thailand with 209 projects from both public and private owners. As a result, there are (1) Project management styles, (2) Personal style, (3) Owner expectation management, (4) Scope Management, (5) Time Management, (6) Cost Management, (7) Quality Management, and (8) Environmental Management. The input are: a clear defined goal, showing respect by giving good service, maintaining high quality, keeping in touch with owners, and resources. This would give the output of the project's success by meeting the owner's expectation and requirements.

A Study on the Development and Evaluation of Partial Design Project for Computer Network Design Course Utilizing Software Simulator (소프트웨어 시뮬레이터를 활용한 네트워크설계 교과목의 요소설계 과제개발 및 평가에 관한 연구)

  • Choi, Dae-Woo
    • Journal of Engineering Education Research
    • /
    • v.15 no.2
    • /
    • pp.3-9
    • /
    • 2012
  • Normally, people think the results of engineering design project can be seen and be touched, however, it's not easy to develop such design subjects at IT related program. This matter turns into an initiative of Seoul Accord corresponding to the Washington Accord. In this paper, an engineering design project is developed from the lecture course that can hardly develop a touchable project due to the lack of expanse or the own characteristics of the course in the IT related program that follows the Washington Accord. An open-ended design project with the pre-defined design components and realistic constraints is developed for the Computer Network Design course. Each team consisted of 2 or 3 students performs the project for more than 5 weeks utilizing a software simulator, the Packet Tracer. In order to analyze the effectiveness, we have used various evaluation tools such as final presentation, peer evaluation, survey results, and mid/final exams. We concluded that the hard and soft skills of students have been improved considerably through the project.

Impacts of PM's Leadership Type on Project Performance in PPP Project (PPP 사업에서 프로젝트관리자(PM)의 리더십유형이 프로젝트성과에 미치는 영향)

  • Hwang, Jae-Seung;Boo, Jeman
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.41-49
    • /
    • 2018
  • Recently, PPP (Public-Private-Partnership) Projects, which private companies invest in, plan, design, construct and operate, have become more popular around the world. The construction industry environment is becoming increasingly competitive. The PPP project is composed of various organizations, so it is very difficult to carry out the project successfully. In this environment, the construction companies are trying hard to secure a competitive advantage. In this study, we tried to identify the role of project manager's leadership and project citizenship behavior as a precedent for creating performance in PPP (Private-Public-Partnership) project. We examine the impact of PM's transformational leadership and transactional leadership on project citizen behavior and examine the impact of project citizen action on project management performance and completion performance. For this study, we conducted a questionnaire survey on PPP project participants. As a result, the following results were obtained. First, transformational leadership and transactional leadership had a significant influence on project citizenship behavior. Second, project citizen behavior had a significant impact on both project management performance and project completion performance. The idealized influence of transformational leadership and the Active management by exception of transactional leadership were found to be very important in shaping PPP team's project citizenship behavior. Therefore, this study has academic implications in studying the effects of PM leadership and project citizenship behavior on the performance of PPP project. And it is expected that it will help selection and training of PM to secure a competitive advantage for construction companies that implement PPP projects practically.

A Study on the Differences of University Performance according to Participation in the Engineering Educational Innovation Support Project (정부재정지원 사업 참여에 따른 대학 성과 차이 분석 연구 : 2018~2020년 공학교육혁신지원사업과 LINC사업을 중심으로)

  • Huh, Ji-suk;Hwang, Yunja
    • Journal of Engineering Education Research
    • /
    • v.25 no.4
    • /
    • pp.13-20
    • /
    • 2022
  • The purpose of this study is to objectively grasp the effect of the engineering education innovation support project among the national engineering-related financial support projects by dividing the groups according to the participation of support projects from 2018 to 2020 and dividing the university performance. As a result of the research the engineering education innovation support project has been consistently producing excellent results of field-based engineering education such as field-oriented industrial-educational collaboration capstone design, technology commercialization, and development and operation of corporate-linked education. It was found that the results showed that the dropout rate of college were lowered. In the future, it needs to be prepared as a place for new and free trials, innovations, and opportunities so that the engineering education innovation support projects can become the mother of other business groups.

Electrical and Communication System Design for the Proton Accelerator Research Center (양성자가속기 연구센터 관련 전기 및 통신설비 설계)

  • Mun, Kyeong-Jun;Lee, Seok-Ki;Jeon, G.P.;Nam, Jung-Min;Jo, Jin-Sam;Kim, Jun-Yeon
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.343-344
    • /
    • 2008
  • 90년대에 들어서면서부터 미래원천기술 개발에 필요한 양성자원 및 중성자원의 중요성이 부각됨으로써, 이에 적합한 고에너지(수백 MeV${\sim}$수 GeV) 및 대전류(수십 mA)의 대형 양성자 가속기가 개발되어 반도체 생산, 의료장비 등 여러 분야에 널리 적용되고 있는 추세이다[1, 2]. 이에 양성자 사업단은 21세기 미래 원천기술을 개발하고 산업경쟁력을 제고하며 공공복지를 증진시킬 수 있는 양성자가속기를 개발하여, NT, BT, IT, ST등 중요 국가과학기술분야의 발전기반을 확충하기 위한 프론티어 사업목표로 하고 있으며 이에 부응할 수 있는 양성자 가속기 연구센터 건설계획을 설정하여 추진 중에 있다. 본 논문에서는 양성자가속기 연구센터 지원시설 건축설계의 일환으로 수행되고 있는 전기, 소방, 통신 및 방범설비 설계과정에서 각 설비설계시의 주요기능 및 특징에 관해 기술하고자 한다.

  • PDF

DATA WAREHOUSE PROTOTYPE SYSTEM TO SUPPORT THE MASTER PLAN OF URBAN REGENERATION PROJECT

  • Dong-Hyun Cho;Sang-Geum Lee;Hyung-Jin Park;Kyo-Jin Koo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.361-368
    • /
    • 2009
  • In the Urban Regeneration Project, the scale becomes huge and the composition of participating organizations is complex. It is necessary to establish the master plan fast and effectively harmonize conflict options and interests in the early stage of the project. However, the master planner, who is tasked to establish the master plan, and the master planning team, are difficult to establish the master plan fast while effectively considering various and complex information related to regeneration. The Urban Regeneration Project is composed of various types of computer files like HWP, EXL, PDF, DWG and others. When the master plan is established, it is necessary to link the information items and physical files of urban generation in order to effectively save the files in storage for easy search and utilization. This study developed a prototype system to support participating subjects of the Urban Regeneration Projects. It will effectively utilize the information items in the physical computer files using information blocks and Metadata. The developed system provides the base to effectively manage large amount of documents in the early stage of the Urban Regeneration Project and make effective decision-making using the concept of data warehouse.

  • PDF

A STUDY ON CONSTRUCTION SCHEDULE OPTIMIZATION INTEGRATING WITH CASH-FLOW

  • Hyung-Guk Lee;Dong-Pil Shin;Sung-Hoon An;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.141-144
    • /
    • 2013
  • This paper presents a system called a Cash-flow based Construction Schedule Optimization system(CfSO). The existing CPM effectively handles schedule and cost management. However, funding strategy should be considered to obtain maximum profit and to progress a project favorably. One of measures is to coordinate the contract terms between owner and subcontractors (or suppliers). Contractor may decrease the interest cost attributed to project financing by adjusting the timing of cash-inflows and cash-outflows. It is an excellent method maximizing profits. This paper presents a method to estimate the amount of a cash-flow occurred periodically by integrating the terms of contract into scheduling. The proposed method is implemented as a system prototype in Microsoft Excel. This system provides a user an automated tool that identifies an optimal schedule that secures maximum profit by adjusting start and finish times of non-critical activities' free-floats without affecting on the project completion time. This system supports a project manager to establish an optimum project schedule and identifies profitable contractual conditions against to a construction owner.

  • PDF

Gradational Risk Management in Procurement Phase for Plant Projects (플랜트 프로젝트의 구매조달 단계별 리스크 분석에 관한 연구)

  • Na, Sung-Yub;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.3
    • /
    • pp.59-65
    • /
    • 2009
  • In the plant EPC project, the procurement work can be considered as the most important part that affects the success or failure of project as it has the closest mutual influence in every execution process of the project. Procurement takes up generally 60% ~ 70% of the entire project budget and the current trend of plant EPC project becoming larger in scale and a variety of process technology being applied. So, it is needed to identify the risks that are expected to occur according to the stages of procurement work, namely, proposal stage, manufacturer selection and purchasing agreement stage, expediting the process management of manufacturer stage, inspection stage and logistics & transportation stage. The management of observation and control of the risks should be performed with the response techniques which are 'avoid',' transfer'and' mitigate'.

  • PDF