A Study on the Theory and its Case Study of Production Design - Focused on the Japanese Construction Projects - (생산설계의 이론과 적용 사례연구 -일본의 건축공사 프로젝트를 대상으로-)

  • Kim, Jin-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.89-101
    • /
    • 2005
  • The early phase of construction projects, communication among the related participants has great influence on the further transaction of the projects. However, important decision making are made by the experience of the field managers in practice without the method for systematic analysis. For example, in building construction project, selection process for construction method has been executed by decision making of some architects dependent on their experience. As a result, there have been frequent construction method alterations during the construction process and delay of duration, addition of cost, etc have followed accordingly. The main reasons of such a mal-functional transaction are due to the absent of the reasonal procedure of decision making reflecting the characteristics of construction project. Therefore, there is a need for an supporting tool and production design for the selection of rational construction method. The objective of this study is to propose production design process and decision making model in relation to various influent factors at the early phase of construction projects. To achieve these objectives, this study 1)analyzes the prior theory about production design, 2)we have studied about selection process for optimal construction method through constraint analysis in structural works, 3)performs a case study to embody the problems of the production design, and 4)proposes a cooperative committee model for supporting production design by analyzing the results of case study and interviewing experts. It is anticipated that the effective tool of proposed model would be able to improve communication among the related participants and systematically accumulate data that might be used in similar construction projects.

Efficiency Improvement of Environmental Assessment Procedure through Introduction of Screening (스크리닝 도입을 통한 환경평가 절차 효율화 방안)

  • Shin, Kyung-Hee;Cho, Kong-Jang;Yim, Hyo-Sook
    • Journal of Environmental Policy
    • /
    • v.10 no.1
    • /
    • pp.129-150
    • /
    • 2011
  • This paper proposes an improvement to differentiate assessment procedure for projects in consideration of their environmental impact as a means to improve efficiency in environmental impact assessment ("EIA") procedure. The targets of analysis were limited to lower impact projects. The current EA system in Korea has already attempted to introduce separate proceedings for certain projects.Tangible results from these efforts, however, have been limited. Other countries have adopted a "screening" system to determine whether EIA is applicable to a particular project, and if so, what procedure will be used therein. Therefore, this study suggests the screening as the process wherein need for EIA is determined with respect to projects which have undergone Prior Environmental Review System(PERS) and which appear to have comparatively negligible environmental impact. In this case, EIA can be omitted and the developer can then draft a mitigation plan instead. This study found that exempting certain projects deemed as having low environmental impact can considerably shorten the duration required for both environmental assessment and consultation, thereby improving efficiency. Other expected effects from the adoption of this screening include reduction in delays in project execution due to environmental assessments and reduced red tape through the provision of increased autonomy to developers and the approving authorities.

  • PDF

Probability-based Critical Path Estimation for PERT Networks of Repetitive Activities (반복작업 PERT 네트워크의 확률기반 주공정 산정기법)

  • Yi, Kyoo-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.6
    • /
    • pp.595-602
    • /
    • 2018
  • Network-based scheduling methods can be classified into CPM method and PERT method. In the network scheduling chart, critical path can be estimated by performing the forward calculation and the backward calculation though the paths in the network chart. In PERT method, however, it is unreasonable to simply estimate the critical path by adding the sum of the activity durations in a specific path, since it does not incorporate probabilistic concept of PERT. The critical path of a PERT network can change according to the target period and deviation, and in some cases, the expected time of the critical path may not be the path with longest expected time. Based on this concept, this study proposes a technique to derive the most-likely critical path by comparing the sum of estimated time with the target time. It also proposes a method of systematically deriving all alternate paths for a network of repetitive activities. Case studies demonstrated that the most-likely critical path is not a fixed path and may vary according to the target period and standard deviation. It is expected that the proposed method of project duration forecasting will be useful in construction environment with varying target date situations.

Multi-objective Optimization Model for Tower Crane Layout Planning in Modular Construction (모듈러 건축의 타워크레인 배치계획 수립을 위한 다중 최적화 모델 개발)

  • Yoon, Sungboo;Park, Moonseo;Jung, Minhyuk;Hyun, Hosang;Ahn, Suho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.36-46
    • /
    • 2021
  • With an increasing trend toward high-rise modular construction, the simultaneous use of tower cranes at a modular construction site has recently been observed. Tower crane layout planning (TCLP) has a significant effect on cost, duration, safety and productivity of a project. In a modular construction project, particularly, poor decision about the layout of tower cranes is likely to have negative effects like additional employment of cranes and redesign, which will lead to additional costs and possible delays. It is, therefore, crucial to conduct thorough inspection of field conditions, lifting materials, tower crane capacity to make decisions on the layout of tower cranes. However, several challenges exist in planning for a multi-crane construction site in terms of safety and collaboration, which makes planning with experience and intuition complicated. This paper suggests a multi-objective optimization model for selection of the number of tower cranes, their models and locations, which minimizes cost and conflict. The proposed model contributes to the body of knowledge by showing the feasibility of using multi-objective optimization for TCLP decision-making process with consideration of trade-offs between cost and conflict.

Consistency Analysis between Predicted and Measured PM10 and NO2 Air Quality During Environmental Impact Assessment of Linear Construction Projects (선형사업에 대한 환경영향평가 시 대기질 예측치와 실측치의 정합성 분석 - PM10과 NO2를 중심으로 -)

  • No Ol, Lim;Hyun Chan, Sung;Sun Jeong, Kim;Ji Young, Kim;Seong Woo, Jeon
    • Journal of Environmental Impact Assessment
    • /
    • v.31 no.6
    • /
    • pp.378-387
    • /
    • 2022
  • Since air pollution has become a global issue to be managed, the Republic of Korea (ROC) is protecting air quality by predicting the air condition before a construction project starts through EnvironmentalImpact Assessment (EIA) and measuring the air condition afterwards the construction project ends through Post-environmental Impact Assessment (PEIA). The aim of this study consists on verifying the predicted and measured concentration data and analyzing their consistency in order to deduce improvement directions. Linear EIA projects which the investigation during operation period have been concluded between years 2017 and 2019 were used. As a result, the following improvement directions were suggested: reduction of EIA air quality standards, strengthen the management of projects with construction duration longer than 5 years, incorporation of first or second quarter (winter or spring) into the investigation period, consideration of construction equipment or conditions for better prediction. The strength of this study is that we arranged and utilized EIA predicted and PEIA measured data to understand the present EIA procedure and made meaningful suggestions through the consistency analysis contributing to air quality maintenance and investigation methodology enhancement.

Development of Data Warehouse for Construction Material Management (건설공사 자재 관리를 위한 데이터 웨어하우스 개발)

  • Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.3
    • /
    • pp.319-325
    • /
    • 2011
  • During a construction project, construction managers must be provided with material information to help them to make decisions more efficiently without delaying the delivery of material. Construction work can be smoothly performed with the proper material supply. Construction duration depends on several material-related decisions, including the order, delivery, and allocation of material to the correct work location. Hence, it is worthwhile to introduce data warehouse techniques that generate subject-oriented and integrated data to construction material management. The data warehouse for construction material management can perform multidimensional analysis and then define KPIs (Key Performance Index) in order to provide construction managers with construction material information such as lead time, material delivery rate, material installation rate and so on. This research proposes a method of effectively facilitating large amounts of data in the operating systems during the construction management process. In other words, the proposed method can supply structured and multi-perspective material-related information using data warehouse techniques.

Development of Time-Cost Trade-Off model Based on Emergency Construction Work Scenario (돌관공사 시나리오 기반 공기-비용 최적화 모델 개발)

  • Lee, Sihyun;Lee, Seounghyun;Son, Jaeho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.43-51
    • /
    • 2016
  • Recently, the cost of construction projects has escalated due to a significant increase in size and complexity. Many construction projects have failed to meet their originally intended project deadline due to various factors such as weather, labor supply, equipment, procurement, accidents, etc. Consequently, emergency construction work scenario has to be implemented in order to shorten the duration and satisfy the original estimated schedule. However, many critical decisions in emergency scenario rely solely on the experience of a construction manager. Thus, this paper proposes TCTO optimization model to decide the most effective alternative out of various working scenarios which are generated by the combination of work group and work time. The developed TCTO model provides the optimum schedule that satisfies the practical constraints. Future research could involve the integration of resource leveling with the proposed model. This would make the model more versatile.

Estimation of Design Flood Considering Time Distribution of Rainfall (강우 시간분포를 고려한 설계홍수량산정)

  • Park, Jae-Hyun;Ahn, Sang-Jin;Hahm, Chang-Hahk;Choi, Min-Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1191-1195
    • /
    • 2006
  • Now days, heavy storm occur to be continue. It is hard to use before frequency based on flood discharge for decision that design water pocket structure. We need to estimation of frequency based on flood discharge on the important basin likely city or basin that damage caused by flood recurrence. In this paper flood discharge calculated by Clark watershed method and SCS synthetic unit hydrograph method about upside during each minute of among time distribution method of rainfall, Huff method choosing Bocheong Stream basin that is representative basin of International Hydrologic Project (IHP) about time distribution of rainfall that exert big effect at flood discharge estimate to research target basin because of and the result is as following. Relation between probability flood discharge that is calculated through frequency analysis about flood discharge data and rainfall - runoff that is calculated through outward flow model was assumed about $48.1{\sim}95.9%$ in the case of $55.8{\sim}104.0%$, SCS synthetic unit hydrograph method in case of Clark watershed method, and Clark watershed method has big value overly in case of than SCS synthetic unit hydrograph method in case of basin that see, but branch of except appeared little more similarly with frequency flood discharge that calculate using survey data. In the case of Critical duration, could know that change is big area of basin is decrescent. When decide time distribution type of rainfall, apply upside during most Huff 1-ST because heavy rain phenomenon of upsides appears by the most things during result 1-ST about observation recording of target area about Huff method to be method to use most in business, but maximum value of peak flood discharge appeared on Huff 3-RD too in the case of upside, SCS synthetic unit hydrograph method during Huff 3-RD incidental of this research and case of Clark watershed method. That is, in the case of Huff method, latitude is decide that it is decision method of reasonable design floods that calculate applying during all $1-ST{\sim}4-TH$.

  • PDF

A Study on Participation of Consultant in Curtain Wall Construction (커튼월 공사에서의 단계별 컨설턴트 참여방안 연구)

  • Yoon Hyung-Soo;Yi Dong-Seob;Koo Cho-Jin;Hyun Chang-Tack
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.618-621
    • /
    • 2003
  • The purpose of this study was to propose the participation of consultant pertinent to ground situations. The careful consideration of participating consultant reduces life cycle cost. duration and improves quality. The first step is studying Curtain-wall construction process by researching the documents, and Second step is analyzing Curtain-wall construction's problem through having a interview with a concerned experts (Architect, Gene-con, Sub-con. Consultant). Then we study how consultant solves the problem, propose the way of participation of consultant. The way of participation consist of three phases. the first one is to participate in design & construction process and the second one is to participate in design process, the third one is to participate in construction process. These participations are decided by evaluating project, design phase. construction phase. The verification of these participating strategies was implemented by the interview with the experts.

  • PDF

Motion Adjustment for Dynamic Balance (동적 균형을 위한 동작 변환)

  • Tak, Se-Yun;Song, O-Yeong;Go, Hyeong-Seok
    • Journal of the Korea Computer Graphics Society
    • /
    • v.5 no.2
    • /
    • pp.33-41
    • /
    • 1999
  • This paper presents a new algorithm about motion adjustment for dynamic balance. It adjusts an unbalanced motion to an balanced motion while preserving the nuance of original motion. We solve dynamic balancing problem using the zero moment point (ZMP) which is often used for controlling the balance of biped robot. Our algorithm is consists of four steps. First, it fits joint angle data to spline curves for reducing noise. Second, the algorithm analyzes the ZMP trajectory so that it can detects the dynamically-unbalanced duration. Third, the algorithm project the ZMP trajectory into the supporting area if the trajectory deviates from the area. Finally, the algorithm produces the balanced motion that satisfies the new ZMP trajectory. In this step, the constrained optimization method is used so that the new motion keeps the original motion characteristics as much as possible. We make several experiments in order to prove that our algorithm is useful to add physical realism to a kinematically edited motion.

  • PDF