An Integrated Expert Model for Delay Management in Construction Projects

  • jalal, Majid Parchami;Yousefi, Elham
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.3
    • /
    • pp.1-14
    • /
    • 2017
  • Delay claim should actually be supported by a set of proper information so that the contractors could prove their validity. The so-called information should be able to clarify the relationship between delay events and how they impact on the whole project. Therefore, exploiting an integrated system by people who are involved in construction business would certainly prove helpful. In the present study, delay analysis methods have been investigated along with selecting a relatively comprehensive method which has been modified, and eventually, a novel model and its required modules have been proposed for evaluating delay claims. The suggested integrated model is formed to identify delayed events, to classify delays, to measure the impacts of delays on the project scheduling, and finally to estimate the damages which were caused by those so-called delays. A decision support system (DSS) model which is related to the integrated system is actually extracted from Iran's general contract conditions, that is, 4311 magazine (equivalent to red FIDIC book). It is then programmed and coded by C# program. This DSS model can be used as an input of Easy Plan program. In addition, at the end of this research, the coded DSS has been used along with the so-called program so that a modified and developed model could be generated.

A COMPARATIVE STUDY OF DELAYS FACTORS IN PROJECT COMPLETION IN LIBYA AND UK CONSTRUCTION INDUSTRY

  • Shebob, A;Dawood, N; Xu, Q
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.614-620
    • /
    • 2011
  • Delays in completing construction projects have significant financial and social impact to all parties involved in the construction process and in particular in developing countries. This is very evident in most construction projects in Libya and in both public and private sectors. The research study was initiated by Libyan Government and the main aim of the project is to develop a new strategy in reducing the impact of delay factors. In order to achieve this, a number of objectives have been set-to conduct a comprehensive literature survey, to conduct a comparative study of the delay factors in project completion in both Libya and UK using semi structured questionnaire and finally, to identify and analyse the causes of delay and ranked them using frequency of occurrence and severity. The critical causes of delay for construction projects were quite different between Libya and UK. For the former, the most critical causes of delay in Libyan construction industry were low skills of manpower, changes in the scope of the project, slowness in giving instruction and poor qualification of consultant, while for the latter they were financial problems, bad weather conditions on the job site and change in the scope of project. Statistical experiments including Paired Samples T-Test, was run to test the significance of the survey data in both countries Libya and UK. The statistical results confirmed the collected data from the survey were significant.

  • PDF

Investigating Main Causes for Schedule Delay in Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.33-46
    • /
    • 2014
  • Delay is the most common problem in the construction industry. It has many negative effects on project's success in terms of time, cost, quality, and safety. From the literature review, a total of thirty-five factors of delay were selected. These factors were divided into seven groups related to materials, manpower, owner, consultant, contractor, construction, and external problems. This study was carried out to identify the main causes of delay for a construction project through their importance level. The importance level was determined based on the frequency of occurrence and severity of impact. The structured questionnaire has distributed to the respondents who have much experience in construction management in Bangladesh. The results of analysis indicated that top five factors of construction delay according to their level of importance are: (1) price of construction materials increased very rapidly, (2) political situation (revolution/ public strikes), (3) shortages of skilled workers, (4) poor site management and supervision by contractor, (5) incompetent/ immature subcontractors. These findings of this study are expected to be significant contributions to Bangladesh construction industry in controlling current performance of project on time overrun.

Construction Delays in Developing Countries: A Review

  • Islam, Muhammad Saiful;Trigunarsyah, Bambang
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.1
    • /
    • pp.1-12
    • /
    • 2017
  • Construction delay is one of the basic constrains to achieve the project objectives in developing countries. This study aims to find the causes and effects of construction delays in developing countries. A thorough literature review has been done following the content analysis method. The relevant literature of 28 developing countries was collected from the scholarly journals published in the period of 2006 to 2016. The different developing countries are grouped into three geographic regions, i.e. South and Southeast Asia, Middle East, and Africa. In these regions, total 53 potential causes of delay under 8 major groups are identified. Frequency and ranking of these factors have been done. The factors, delay in progress payment by owner, contractors' cash flow problem, improper planning and scheduling, poor site management, and change order by owner during construction, are acknowledged as critical causes of delay in developing countries. This study will assist both academic and professional experts providing more insight about the construction delays and project management in developing countries.

Case Analysis on Application of Project Delay Analysis Method in Domestic Construction Project (국내 건설공사에서 공기지연 분석방법 적용 사례 분석)

  • Kim, Seon-Gyoo;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.98-106
    • /
    • 2019
  • Recently, the number of project delay-related claims and disputes in Korean construction projects has been increasing rapidly. This suggests that the domestic construction contract practice, which has traditionally been superior to the client, is changing into a mutually balanced relationship among the contracting parties. The project delay analysis selects the application method according to the type of schedule approved at the start of the construction and how the schedule management was performed during the construction. The most important prerequisite for project delay analysis is that a complete CPM schedule agreed at the beginning of the construction is prepared and the actual progress of such schedule is well documented. This study is about applying the project delay analysis methodology of a case where a contractor claims damages to a client while constructing a large new private building construction project. In this study, it is determined whether the application of the as-planned analysis method is appropriate to the incomplete CPM schedule and then proposes the as-planned vs. as-built analysis method based on the new standard as an alternative. Next, apply the as-planned vs. as-built analysis method to the schedule in the case project, and then compare it with the result of the as-planned analysis method. The purpose of this study is to suggest a project delay analysis method suitable for the domestic schedule management practices, so that it can be used as a meaningful reference in project delay disputes and litigations of domestic construction projects.

Delay Factor Analysis and Process Enhancement System Development Focusing on Masonry Work (조적공사에서의 작업 지연 요소 도출 및 개선 시스템 제안)

  • Park, Min Ha;Lee, Hye Lin;Ko, Yong-Ho;Han, SeungWoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.119-120
    • /
    • 2015
  • Appropriate management of the finish works in construction project is one of most important activities that must be conducted considering the total duration of the project. Masonry work is a fundamental process that is performed in the preliminary steps of finish works. However, it has been investigated that the analysis of delay factors affecting masonry work has been neglected in the domestic construction site. Therefore, this study deducts delay factors affecting masonry work by literature review and survey on site engineers and labors. This study has been conducted as a preliminary step of developing a construction project interference management system which is expected to suggest objective information for the decision making in construction sites.

  • PDF

Critical Factors Causing Delay on State-Funded Construction Projects in Vietnam

  • Luu, Van Truong;Kim, Soo-Yong;Pham, Nguyen-The-Thanh;Nguyen, Thanh-Long;Nguyen, Tuan-Kiet
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.104-108
    • /
    • 2015
  • Delay on State-Funded Construction Projects (SFCPs) in Dong Thap - a province in Mekong Delta of Vietnam, as many provinces of Vietnam, have caused budget overrun through many recent years. The budget-overrun situations, in turn, have deepened the delay. Identifying critical factors affecting delay SFCPs plays a key role to mitigate negative impact of delay. 134/160 questionnaires were collected from personals working for project owners, consultants, supervisors and contractors in Dong Thap Province. Convenient sampling method was used. EFA was resulted in critical 04 factors with 20 variables caused delay in SFCPs, including: "Project technic, contractor's financial capacity and adjustment role of the government", "Regulation and Policy", "Mutual benefit support and concern between the government and residents", and "Disadvantage of construction site and weather season". Reliable measures to reduce delay on SFCPs are discussed to establish legal corridors to strictly controlling the process, consider mutual benefit between the government and its residents, and evaluating construction conditions. Those measures are considered could be applied in not only Dong Thap province, but most provinces of Vietnam as well.

  • PDF

Delay Factors Based on the Importance of Finish Work in Apartment Construction Project (공동주택 마감공사 중요도 기반 작업지연 요인 분석)

  • Lee, Seung-Hoon;Lee, Sang-Hyo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.125-129
    • /
    • 2010
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

  • PDF

Causal Loops and Stock-Flow Models of Project Delay Confronted with Location of Locally Unwanted Facilities (비선호시설 입지에 관한 프로젝트 지체의 인과구조와 유량-저량 묘형)

  • Lee, Man-Hyung;Choi, Nam-Hee
    • Korean System Dynamics Review
    • /
    • v.7 no.1
    • /
    • pp.91-118
    • /
    • 2006
  • The purpose of this study is to find what factors are directly related to the delay of public projects, usually going beyond the planned deadline and budget. From a series of System Dynamics simulation works applied to the Cheongju Cremation Project, the research finds that the negative externalities originated from the adjacent location of the LULU(locally unwanted land use) facilities have exerted significant influence on dynamic perceptions of key stakeholders, typically resulting in project delay. As shown repeated experiments, the proposed negotiation-based models would produce relatively higher planning performance level than the typical approaches hinged on the administrative-expediency tactics. Even though the former may require more human and material resources in the very beginning stage, as they have to deal with diverse grievances raised by major stake-holders, most of them would bound for strengthening reinforcing loops within the complex structure. These results also imply that negotiation or consensus-building approaches would enhance mutual agreement among stake-holders, upgrading the overall quality of project management.

  • PDF

Delay Factor Analysis of Public Project Based on System Dynamics (SD를 이용한 공공 프로젝트의 지체요인 분석)

  • 이만형;이정민
    • Korean System Dynamics Review
    • /
    • v.4 no.2
    • /
    • pp.95-130
    • /
    • 2003
  • The purpose of this study is to find what causes make public projects hold off, going beyond the planned deadline and budget. Using System Dynamics(SD) and their derivative Urban Dynamics(UD) models, it intends to analyze major feedback loops based on VENSIM and to simulate them with STELLA software, all of which are interrelated with various causes of project delay. To prevent or ameliorate project delay, first of all it advises to focus on endogenous delaying factors not exogenous ones. These factors either reinforce or balance certain loops in complex causal structure, In the case example on the Cremation Building Project in Cheongju, Residents’ participation demand make negotiation put off and delayed negotiation reinforces administrative-expediency planning in order to observe a time limit, on the other hand, once building consensus, it increase both the level of planning performance and public trust. In the meantime, the real planning process used to neglect residents opinions and manage public grievance only through compensation, he a result of simulation, visible fruit of negotiation in the initial phase seems to be not satisfactory owing to funds and time consumed, but after reaching an mutual agreement among stakeholders, planning performance is effective and strategic than administrative-expediency planning viewed in both financial and time angle. It proposes to devise specific tools schematizing project implementation. In order to upgrade the quality of project management, it recommends for planners to adopt key concepts based on SD/UD diagrams and causal loops, which would contribute to enriching Planning abbots.

  • PDF